Council archive · source document
AppendixB_CodeandOverlayAssessment · MCU16/0078
Attached to the e-mail MCU16/0078 - Development Application.
Appendix B Code and Overlay Assessment 45 Elizabeth Street, Noosaville Water Supply and Sewerage Reticulation Code (Division 21) Probable solution Specific outcome Response Complies O13 Alignment of sewerage reticulation S13.1 Infrastructure is constructed on The development will comply with the relevant infrastructure is to allow for easy access for the the preferred alignments in accordance Sewerage Reticulation design guidelines as required. ongoing maintenance by Council. with PSP6 –Engineering Design Detailed Services Plans will be prepared and Standards — Water and Sewerage. submitted for approval at Operational Works stage. O14 Any alterations or repairs to infrastructure as S14.1 Any alterations or repair to Any alterations or repair to infrastructure as a result YES a result of the development are made at no cost to infrastructure as a result of the of the development will be completed at the Council. development are completed at the developer’s expense. developer’s expense. 126
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
AppendixB_CodeandOverlayAssessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.