Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

AppendixB_CodeandOverlayAssessment · MCU16/0078

Attached to the e-mail MCU16/0078 - Development Application.

of 133

Text shows just the words. Original shows the document exactly as it was published.

Appendix B Code and Overlay Assessment
45 Elizabeth Street, Noosaville



 Division 6—Residential Uses Code
 Specific Outcome                                      Probable Solution                          Response                                              Complies
                                                       30m for transmission lines between
                                                       133kV and 275kV; and c) 40m for
                                                       transmission lines greater than 275kV.

   Hot Water Systems

   O3 Hot water systems are installed and operated     S3.1 All hot water systems installed       The dwellings will be provided with a hot water       YES
   to support the efficient use of natural resources   are—                                       system in accordance with SO3.1.
   and minimise consequent pollution such as
   greenhouse gas emissions.                              a) solar systems; or

                                                          b) electric heat pump systems; or

                                                          c) natural gas or LPG systems; or

                                                          d) any combination of a), b) or c).

   Water supply and conservation

 O4 On-site water storage is designed and operated     S4.1 & S5.1 For a Class 1 building15       The site is not outside a reticulated water service   N/A
 to support the efficient use of water;                other than a Detached house or             area.
                                                       Multiple Housing Type 1, outside a
 AND                                                   reticulated water service area, a
                                                       rainwater tank is to be installed with
 O5 On-site water storage is adequate for
                                                       the following minimum storage
 occupants every day use and fire fighting
                                                       capacities— a) Where no more than 3
 purposes.
                                                       bedrooms – 45,000 litres; or b) Where
                                                       more than 3 bedrooms – 60,000 litres;

                                                       Advisory note The 5,000 litres required
                                                       can be included within the water
                                                       required in S4.2 or S5.1 providing it is


                                                                                                                                                                   44

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

AppendixB_CodeandOverlayAssessment.pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.