Council archive · source document
AppendixB_CodeandOverlayAssessment · MCU16/0078
Attached to the e-mail MCU16/0078 - Development Application.
Appendix B Code and Overlay Assessment 45 Elizabeth Street, Noosaville Erosion and Sediment Control Code (Division 15) Table 14-53 —Erosion and sediment control Specific outcome Probable solution Response Complies runoff from disturbed areas flows to the catchpit; AND S1.6 For buildings, a) temporary or permanent downpipes are connected to the stormwater system before laying the roof; or b) localised erosion is avoided by directing flow from downpipes over non-erosive areas. Stormwater runoff O2 Stormwater is diverted around disturbed areas. S2.1 Diversion drains or bunds are All site works shall be undertaken in accordance with YES designed and constructed to drain a detailed Erosion and Sediment Control Plan. This upstream run-off around the disturbed plan shall be prepared at Operational Works stage of site; AND the development and will be implemented during all stages of construction. S2.2 Discharge from the diversion drains do not cause run-off impacts to other properties; OR S2.3 Alternative methods, as described in the Institution of Engineers Australia (Queensland Division) Soil Erosion and Sediment Control - Guidelines for 89
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
AppendixB_CodeandOverlayAssessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.