250314OPW-B Operational Works Drawings

of 5

Page text shows just the words. Original shows the document exactly as it was published.

PROJECT NOTES (NOTE THAT ALL NOTES MAY NOT APPLY)
GENERAL                                                        CONTRACTORS SUBMISSIONS                                              EARTHWORKS                                                    CONCRETE                                                                                                                        REINFORCEMENT
1.   THESE ENGINEERING DRAWINGS HAVE BEEN PREPARED FROM         1.   THE REINFORCEMENT, PRESTRESSING AND STRUCTURAL STEEL           8.   WHERE ANY FILLING IS CARRIED OUT ON THE SITE AFTER         1.       CONCRETE WORK SHALL BE IN ACCORDANCE WITH                                                                             1.   REINFORCEMENT IS TO BE IN ACCORDANCE WITH THE
     INFORMATION AVAILABLE AT THE TIME. AS THIS INFORMATION          MATERIAL SUPPLIER MUST BE CERTIFIED BY ACRS (AUSTRALIAN             THE COMPLETION OF THE SITE INVESTIGATION, THE                       AS3600-2018.                                                                                                               AS/NZS4671 AND TO BEFIXED AS SHOWN ON THE DRAWINGS.
     MAY BE THE SUBJECT OF CHANGE PRIOR TO OR DURING                 STANDARDS CERTIFICATION AND VERIFICATION OF                         FOLLOWING REQUIREMENTS SHALL BE FOLLOWED:
     CONSTRUCTION, THE CONTRACTOR IS REQUESTED TO ADVISE        2.   REINFORCING, PRESTRESSING AND STRUCTURAL STEELS) FOR                                                                           2.       CONSTRUCTION JOINTS SHALL BE PROPERLY FORMED AND                                                                      2.   REINFORCEMENNT GRADES ARE INDICATED BY THE FOLLOWING
     THE ENGINEER WHERE DIFFERENCES OCCUR. THESE DRAWINGS            THE SUPPLY OF REINFORCEMENT, PRESTRESSING STRUCTURAL                •    THE SITE SHALL BE STRIPPED OF ALL VEGETATION                   USED ONLY WHERE SHOWN OR SPECIFICALLY APPROVED BY                                                                          SYMBOLS:
     SHALL NOT BE USED FOR FINALSETOUT OF THE PROJECT                STEEL.                                                                   PRIOR TO THE PLACEMENT OF ANY FILLING                          THE ENGINEER.                                                                                                                   N-    HOT ROLLED RIBBED REBAR (500 MPa)
                                                                                                                                                                                                                                                                                                                                                                                                     LINDSAY CONSULTING PTY
                                                                                                                                                                                                                                                                                                                                                                                                       LINDSAY CONSULTING PTY LTD




     UNLESS SPECIFICALLY STATED.                                                                                                              MATERIAL.                                                                                                                                                                                      R-    HOT ROLLED PLAIN ROUND (250 MPa)                                     LTD
                                                                3.   SUBMIT CURRENT CERTIFICATES.                                                                                                   3.       DO NOT SCALE STRUCTURAL DRAWINGS TO OBTAIN                                                                                      SL - SQUARE MESH
2.   INSPECTIONS ARE REQUIRED TO BE PERFORMED BY A DULY                                                                                  •    COMPACTION STANDARDS FOR FILLING MATERIAL                      DIMENSIONS.                                                                                                                     RL - RECTANGULAR MESH
     APPOINTED COMPETANT PERSON(S). REFER TO PRINCIPLE
     CONTRACTOR, CERTIFER, STATE GOVERMENT LEGLISLATION OR
                                                               STRUCTURE LOADINGS                                                             CONTROLLED FILLING                                     4.      REFER ARCHITECT FOR SETOUT DIMENSIONS.
                                                                                                                                                                                                                                                                                                                                             TM - TRENCH MESH                                                                                         RPEQ 4928

     COUNCIL FOR FOR HOLD POINTS.                                                                                                                                                                                                                                                                                                     THE BAR SIZE IS INDICATED BY A NUMBER AFTER THE   ABOVE        OFF. 2C/82 PARKER STREET, MAROOCHYDORE         PH 54 792 118
                                                               THE STRUCTURE HAS BEEN DESIGNED FOR THE FOLLOWING DESIGN
                                                               EVENTS, IN ACCORDANCE WITH THE BUILDING CODE OF AUSTRALIA.
                                                                                                                                              (A)   SAND FILLING UP TO 800 DEEP, PLACED IN          5.       MAXIMUM AGGREGATE SIZE SHALL BE 20 mm                                                                                SYMBOL, WHICH INDICATES THE BAR DIAMETER IN MILLIMETRES.          THIS DRAWING REMAINS THE PROPERTY OF
3.   THESE DRAWINGS SHALL BE READ IN CONJUNCTION WITH ALL                                                                                           MAXIMUM 300mm THICK LAYERS AND
     ARCHITECTURAL AND OTHER CONSULTANTS' DRAWINGS AND          1.   STRUCTURE IMPORTANCE LEVEL: 2                                                  COMPACTED WITH A VIBRATING ROLLER TO            6.       THE SLUMP OF THE CONCRETE SHALL BE 80 mm ± 10 mm                                                                      3.   COVER TO BE MAINTAINED DURING POURING BY USE OF PLASTIC     LINDSAY CONSULTING PTY LTD AND IS FOR
     SPECIFICATIONS AND WITH SUCH OTHER WRITTEN                                                                                                     ACHIEVE A MINIMUM DYNAMIC CONE PENETRO-                                                                                                                                             TIPPED METAL CHAIRS, PLASTIC CHAIRS AND/OR MORTAR             THE SOLE USE OF THE CLIENT. NO PART
     INSTRUCTIONS AS MAY BE ISSUED DURING THE COURSE OF THE     2.   ANNUAL PROBABILITY OF EXCEEDANCE:                                              METER READING OF 7 BLOWS PER 300                7.       MINIMUM CONCRETE STRENGTHS/COVER FOR ALL NON SLAB ON                                                                       BLOCKS.                                                     MAY BE USED IN PART OR WHOLE WITHOUT
     CONTRACT.                                                                                                                                      PENETRATION (REFER AS 1289.F3.3).                        GROUND MEMBERS SHALL BE AS FOLLOWS:-
                                                                     WIND                      1:500                                                                                                                                                                                                                               4.   COVER SHALL BE AS SPECIFIED ELSEWHERE . CHAIRING SHALL         PRIOR EXPRESS WRITTEN CONSENT OF
4.   ALL DISCREPANCIES SHALL BE REFERRED TO THE ARCHITECT            EARTHQUAKE                1:500                                                SAND FILL MAY BE FLOODED IF NECESSARY TO      -----------------------------------------------------------------------------------------------------------------------------         BE SPACED SUCH THAT THE FOLLOWING                                 LINDSAY CONSULTING PTY LTD
     FOR DECISION BEFORE PROCEEDING WITH THE WORK.                                                                                                  ACHIEVE THIS COMPACTION STANDARD,                                                                                 MEMBER LOCATION                                                   TOLERANCES ARE ACHIEVED DURING CONCRETE POUR :
                                                                                                                                                                                                  MEMBER TYPE                                   EXTERNAL                                    INTERNAL
                                                                                                                                                    PROVIDED THE WATER CAN SUBSEQUENTLY BE
5.   ALL DIMENSIONS RELEVANT TO SETTING OUT AND OFF-SITE
                                                                3.   WIND LOADING HAS BEEN DETERMINED IN ACCORDANCE
                                                                     WITH AS/NZS 1170.2 WIND ACTIONS, USING THESE                                   DRAINED FROM THE SITE.
                                                                                                                                                                                                                                    COVER                  STRENGTH              COVER                  STRENGTH
                                                                                                                                                                                                                                                                                                                                            ABOVE GROUND -      +10 mm/-5 mm                        CLIENT AND PROJECT DESCRIPTION
     WORK SHALL BE VERIFIED BY THE CONTRACTOR BEFORE                                                                                                                                                                                                                                                                                        BELOW GROUND -      +40 mm/-20 mm
                                                                                                                                                                                                                                                                                                                                                                                                      EAGLE SURVEYS
                                                                     VALUES:                                                                                                                      SUSPENDED SLABS                   30mm                     40 MPA              25mm top                 32 MPA
     CONSTRUCTION AND FABRICATION IS COMMENCED.                                                                                               (B)   NON-SAND FILLING UP TO 400 DEEP, PLACED IN
                                                                     WIND REGION             B                                                      MAXIMUM 150 mm THICK LAYERS AND               WALLS                                                                                                                            5.   UNLESS NOTE D OTHERWISE SPLICES IN REINFORCEMENT
6.   THE ENGINEER'S DRAWINGS SHALL NOT BE SCALED.                    TERRAIN CATEGORY        2.5                                                    COMPACTED WITH A MECHANICAL ROLLER.           (INCL TILT PANELS)                40mm                     40 MPA              25mm top                 40 MPA                        SHALL BE MADE ONLY IN THE POSITION SHOWN. WRITTEN
                                                                                                                                                    CLAY FILL SHALL BE MOIST DURING COMPACTION.                                                                                                                                         APPROVAL BY THE STRUCTURAL ENGINEER SHALL BE OBTAINED
7.   DURING CONSTRUCTION THE CONTRACTOR SHALL BE
                                                                     SHIELDING MULTIPLIER    1.0
                                                                     TOPOGRAPHIC MULTIPLIER 1.0                                                                                                   BLOCKWORK FILL                    60mm                     25 MPA              40mm top                 25 MPA                        FOR ANY OTHER SPLICES.                                        PROPOSED SUBDIVISION
     RESPONSIBLE FOR MAINTAINING THE STRUCTURE IN A STABLE                                                                                    (C)   CONTROLLED FILLING SHALL CONTINUE FOR AT
     CONDITION AND ENSURING NO PART SHALL BE OVERSTRESSED
                                                                     REGIONAL WIND SPEED, VR 57.0 m/sec.
                                                                                                                                                    LEAST 1 METRE PAST THE EDGE OF THE            PAVEMENTS
                                                                                                                                                                                                  (GENERAL)                         30mm                     32 MPA                ---                        ---
                                                                                                                                                                                                                                                                                                                                   6.   WELDING OF REINFORCEMENT WILL BE PERMITTED ONLY AFTER         33 CRANK STREET,
     UNDER CONSTRUCTION ACTIVITIES.                                                                                                                 FOOTING BEAM AND SHALL BE BATTERED BACK                                                                                                                                             APPROVAL BY THE STRUCTURAL ENGINEER.
                                                                     INTERNAL PRESSURE COEFFICIENT Cp,i +0.2, _0.3
                                                                                                                                                    TO THE ORIGINAL SURFACE WITH A SLOPE OF       PAVEMENTS
                                                                                                                                                                                                                                                                                                                                                                                                      TEWANTIN
8.   WORKMANSHIP AND MATERIALS ARE TO BE IN ACCORDANCE          4.   EARTHQUAKE LOADING HAS BEEN DETERMINED IN                                      NO MORE THAN 1:2 (VERT : HOR).                (NON-                                                                                                                            7.   REINFORCEMENT SHALL BE BENT COLD IN ACCORDANCE WITH
     WITH THE RELEVANT CURRENT S.A.A. CODES INCLUDING ALL            ACCORDANCE WITH AS/NZS1170.4 USING THESE VALUES:                                                                             PNEUMATIC TYRES)                  30mm                     32 MPA                ---                        ---                       AS3600 EXCEPT WHERE APPROVED BY THE STRUCTURAL
     AMENDMENTS, AND THE LOCAL STATUTORY AUTHORITIES,                                                                                         (D)   WHERE THE DEPTH OF FILLING MATERIAL EXCEEDS                                                                                                                                         ENGINEER. NO RE-BENDING SHALL BE PERMITTED UNLESS
                                                                                                                                                                                                  -----------------------------------------------------------------------------------------------------------------------------
     EXCEPT WHERE VARIED BY THE CONTRACT DOCUMENTS.                  SOIL CLASS                                   Ce                                THAT SPECIFIED ABOVE, THE FILLING MATERIAL                                                                                                                                          APPROVED BY THE STRUCTURAL ENGINEER.
                                                                     HAZARD FACTOR (z)                            0.08                              SHALL BE COMPACTED AS FOLLOWS:-
9.   THE APPROVAL OF A SUBSTITUTION SHALL BE SOUGHT FROM             PROBABILITY FACTOR (kp)                      1.0
                                                                                                                                                                                                    8.       ALL CONCRETE SHALL BE VIBRATED.                                                                                       8.   ALL REINFORCEMENT SHALL BE SECURELY SUPPORTED IN ITS        DRAWING TITLE
     THE ENGINEER, BUT IS NOT AN AUTHORISATION FOR AN EXTRA.         EARTHQUAKE DESIGN CATEGORY (EDC)             I                                 •   SAND FILL TO 65% DENSITY INDEX IN                                                                                                                                               CORRECT POSITION DURING CONCRETING BY APPROVED
     ANY EXTRA INVOLVED MUST BE TAKEN UP WITH THE ARCHITECT
     AND/OR PRINCIPLE BEFORE THEWORK COMMENCES.                 5.   UNLESS NOTED OTHERWISE THE STRUCTURAL WORK
                                                                                                                                                        ACCORDANCE WITH AS1289.E6.1                 9.       ALL CONCRETE SHALL BE CURED IN ACCORDANCE WITH AS3600
                                                                                                                                                                                                                                                                                                                                        PLASTIC BAR CHAIRS U.N.O.
                                                                                                                                                                                                                                                                                                                                                                                                     NOTES
                                                                                                                                                    •   NON-SAND FILL TO 95% MAXIMUM DRY            10. ALL CONCRETE SHALL BE SAMPLED AND TESTED IN
                                                                     SHOWN ON THESE DRAWINGS HAS BEEN DESIGNED FOR                                                                                                                                                                                                                     MAXIMUM CENTRES OF SUPPORTING CHAIRS SHALL BE 600mm
                                                                                                                                                        DENSITY (STANDARD COMPACTION) IN                ACCORDANCE WITH AS3600 AND AS1379.
10. UNLESS NOTED OTHERWISE ALL DIMENSIONS ARE IN                     THE FOLLOWING LIVE LOADS:                                                                                                                                                                                                                                    FOR FABRIC, 600mm FOR BARS UP TO 12mm DIAMETER, 900mm FOR
    MILLIMETRES                                                                                                                                         ACCORDANCE WITH AUSTRALIAN STD                                                                                                                                            BARS 16mm AND GREATER.
                                                                                                                                                                                                  11         THE CONTRACTOR IS TO NOTIFY THE STRUCTURAL
                                                                             AREA                           LIVE LOAD                                                                                        ENGINEER IN WRITING OF ANY ADMIXTURES TO BE USED IN
11. ALL LEVELS ARE EXPRESSED IN METRES.                                                                UNIFORM        POINT                         •   COMPACTION TESTS SHALL BE CARRIED                                                                                                                                          9.   ALL OPENINGS AND RE-ENTRANT CORNERS IN THE CONCRETE
                                                                                                                                                        OUT ON EACH LAYER AS THE FILLING IS                  THE CONCRETE MIX.
                                                                                                                                                                                                                                                                                                                                        SHALL HAVE 3-N12 BARS x 2000 LONG TOP AND BOTTOM,
12. ALL PROPS AND FORMWORK FOR BEAMS AND SLABS SHALL BE              INTERNAL (GENERAL)                1.5 kPa           1.8 kN                         PLACED. IF THE COMPACTION STANDARD
                                                                                                                                                                                                             NO ADMIXTURES SHALL BE USED WITHOUT WRITTEN
                                                                                                                                                                                                                                                                                                                                        CENTRED DIAGONALLYACROSS THE CORNER.                        SCALES
    REMOVED BEFORE CONSTRUCTION OF ANY MASONRY WALLS OR              INTERNAL (LIGHT GARAGE)           2.5 kPa           13 kN                          SPECIFIED IS NOT ACHIEVED, THEN A
                                                                                                                                                                                                             APPROVAL BY THE STRUCTURAL ENGINEER.
    PARTITIONS ON THE FLOOR.                                         INTERNAL (LIGHT INDUST)           5.0 kPa           4.5 kN/m                       "PIER AND SLAB" AND "PIER AND BEAM"                                                                                                                                        10. REINFORCEMENT LAPS SHALL BE AS FOLLOWS:-
                                                                     INTERNAL (OFFICES)                3.0kPa            2.7 kN                         FOOTING DESIGN SHALL BE ADOPTED
                                                                                                                                                                                                    12. UNLESS NOTED OTHERWISE ALL FORMED EDGES AND CORNERS                                                                                 •    12mm      500 mm
13. ALL NON LOADBEARING WALLS SHALL BE KEPT CLEAR OF THE             BALCONIES                         2.0 kPa           1.5 kN/m                       WITH ALL PIERS FOUNDED ON THE
                                                                                                                                                                                                        OF CONCRETE MEMBERS SHALL HAVE 20mm CHAMFERS.                                                                                       •    16mm      700 mm
    UNDERSIDE OF SLABS AND BEAMS BY 20mm                             ROOF                              0.25kPa                                          NATURAL UNDERLYING MATERIAL.
                                                                     STORAGE                           2.4 kPa/m storage height                                                                                                                                                                                                             •    20mm      900 mm
                                                                                                                                                                                                    13. DRIP GROOVES ARE TO BE PROVIDED AT ALL EXPOSED EDGES.                                                                               •    24mm      1000 mm
14. UNLESS OTHERWISE SHOWN. SUBTERRANEAN TERMITE                                                                                             ROLLED FILLING
                                                                                                                                                                                                        COVER TO REINFORCEMENT TO BE MAINTAINED.                                                                                            •    28mm      1200 mm
    PROTECTION SHALL BE IN ACCORDANCE WITH AS 3660 -
    PART 1 AND THE BCA.                                                                                                                       (A)   SAND FILLING UP TO 600 DEEP, PLACED IN                                                                                                                                                  •    32mm      1400 mm
                                                                                                                                                                                                    14. REINFORCEMENT IS REPRESENTED DIAGRAMMATICALLY AND
                                                                                                                                                    MAXIMUM 300mm THICK LAYERS AND COMPACTED BY
15. NON-STRUCTURAL ITEMS SUCH AS DAMP PROOF COURSING,          WATERPROOFING                                                                        REPEATED ROLLING WITH AN EXCAVATOR.
                                                                                                                                                                                                        NOT NECESSARILY SHOWN IN TRUE PROJECTION.                                                                                       FOR ALL OTHER REINFORCEMENT SIZES REFER TO ENGINEER
    FLASHING AND WEEP HOLES ARE NOT SHOWN FOR CLARITY.
                                                                1.   REFER TO ARCHITECTS DOCUMENTATION FOR WATERPROOFING                                                                            15. SIZES OF CONCRETE ELEMENTS DO NOT INCLUDE THICKNESS
    REFER TO THE ARCHITECTURAL DETAILS AS REQUIRED                                                                                            (B)   NON-SAND FILING UP TO 300 DEEP, PLACED IN
                                                                     DETAILS AND PRODUCT SPECIFICATIONS GENERALLY.                                                                                      OF APPLIED FINISHES. FALLS TO UPPER SURFACES OF SLABS TO
                                                                                                                                                    MAXIMUM 150mm THICK LAYERS AND COMPACTED BY
                                                                                                                                                                                                        BE IN ADDITION TO SLAB THICKNESS.
SAFETY                                                          2.   WHILE THE SELECTION AND DETAILING OF WATERPROOFING
                                                                                                                                                    REPEATED ROLLING WITH AN EXCAVATOR

                                                                     PRODUCTS IS OUTSIDE THE SCOPE OF THE STRUCTURAL                                                                                16. BEAM DEPTHS ARE WRITTEN FIRST AND INCLUDE SLAB
1.   REFER TO THE PROJECT DOCUMENTS FOR AN ASSESSMENT OF             DOCUMENTATION, THE FOLLOWING ITEMS MUST BE NOTED:
                                                                                                                                              (C)   WHERE THE DEPTH OF FILLING MATERIAL EXCEEDS
                                                                                                                                                    THAT SPECIFIED ABOVE, THE FILLING MATERIAL
                                                                                                                                                                                                        THICKNESS.                                                                                                                                                                                  SURVEY DATUM
     THE RISKS ASSOCIATEDWITH THE ANY WORKS AND
                                                                                                                                                    SHALL BE COMPACTED AS FOLLOWS:-
     RECOMMENDED TREATMENTS.                                         (i)     REINFORCED CONCRETE AND REINFORCED                                                                                     17. CAMBER -UNLESS NOTED OTHERWISE ON DRAWINGS, SLABS
                                                                             CONCRETE BLOCKWORK ON THEIR OWN ARE NOT                                •   SAND FILL TO 65% DENSITY INDEX IN
                                                                                                                                                                                                        SHALL BE GIVEN A POSITIVE UPWARD CAMBER AT MIDSPAN 0F                                                                                                                                        .
2.   WHERE THERE IS IS NO OVER RIDING PROJECT DOCUMENT/                      WATERPROOF.                                                                                                                3MM PER 1000mm SPAN. METHOD OF CAMBERING IS TO BE
                                                                                                                                                        ACCORDANCE WITH AS1289.E6.1
     SPECIFICATIONS THEN REFER TO THE PRINICIPLE CONTRACTOR                                                                                                                                             AGREED WITH THE ENGINEER. BEAMS SHALL BE CAMBERED AS
     FOR ALL SAFETY REQUIREMENTS                                     (ii)    LINDSAY CONSULTING PTYL LTD RECOMMENDS                                                                                     SHOWN ON DRAWINGS (NEGATIVE CAMBER IS NOT ALLOWED).
                                                                                                                                                    •   NON-SAND FILL TO 95% MAXIMUM DRY
3.   CONSULTATION WITH AFFECTED PARTIES IS MANDATORY WHEN
                                                                             WATERPROOFING MEASURES FOR ALL EXTERNAL                                    DENSITY (STANDARD COMPACTION) IN
                                                                                                                                                                                                    18. CALCIUM CHLORIDE IS NOT PERMITTED TO BE USED.
                                                                                                                                                                                                                                                                                                                                                                                                    ASSOCIATED CONSULTANTS
                                                                             SLABS OVER USABLE SPACES AND EXTERNAL SINGLE                               ACCORDANCE WITH AUSTRALIAN STD
     IDENTIFYING HAZARDS,ASSESSING RISKS AND DECIDING ON                     SKIN MASONRY.
     CONTROL MEASURES.                                                                                                                                                                            19   EXACT SIZE AND LOCATION OF PENETRATIONS ARE TO BE
                                                                                                                                                    •   COMPACTION TESTS SHALL BE CARRIED
                                                                     (iii)   FAILURE TO PROVIDE WATERPROOFING, OR                                                                                      OBTAINED FROM WORKSHOP DRAWINGS PRIOR TO SCHEDULING
                                                                                                                                                        OUT ON EACH LAYER AS THE FILLING IS
4.   CONSTRUCTION SHALL BE CARRIED OUT USING SAFE WORK                       INADEQUATE WATERPROOFING MEASURES MAY                                                                                OF REINFORCEMENT, AND ARE NOT TO EXCEED DIMENSIONS WHERE
                                                                                                                                                        PLACED. IF THE COMPACTION STANDARD
     METHODS AND IN ACCORDANCE WITH THE FOLLOWING                            RESULT IN LEAKS.                                                                                                     SHOWN ON STRUCTURAL     DRAWINGS.
                                                                                                                                                        SPECIFIED IS NOT ACHIEVED, THEN A
     DOCUMENTS:-
                                                                                                                                                        "PIER AND SLAB" AND "PIER AND BEAM"
                                                                     (iv)    PROLONGED LEAKS CAN LEAD TO PREMATURE                                                                                  20. DO NOT CUT REINFORCEMENT ON SITE TO CLEAR
                                                                                                                                                        FOOTING DESIGN SHALL BE ADOPTED
LEGISLATION                                                                  DETERIORATION OF STRUCTURAL ELEMENTS.                                      WITH ALL PIERS FOUNDED ON THE
                                                                                                                                                                                                        PENETRATIONS.DISPLACE REINFORCEMENT SLIGHTLY AS
                                                                                                                                                                                                        NECESSARY.
                                                                                                                                                        NATURAL UNDERLYING MATERIAL.
-    WORKPLACE HEALTH AND SAFETY ACT 2011                            (v)     WATER LEAKING THROUGH CONCRETE STRUCTURES
-    WORKPLACE HEALTH AND SAFETY REGULATION 2011                             TYPICALLY CONTAINS CALCIUM WHICH CAN DAMAGE                                                                            21. NO CHASES, HOLES GREATER THAN 150mm DIAMETER, OR
                                                                             PAINTWORK                                                                                                                  EMBEDMENT OF PIPES GREATER THAN 40mm DIAMETER OTHER
                                                                                                                                                                                                        THAN THOSE SHOWN ON THE STRUCTURAL DRAWINGS SHALL
QUEENLAND GOVERNMENT CODES OF PRACTICE                                                                                                                                                                  BE MADE IN THE CONCRETE SLABS. FOR ALL OTHER CONCRETE
                                                               EARTHWORKS                                                                                                                               MEMBERS NO PENETRATIONS, CHASES OR EMBEDMENTS SHALL
-    CONFINED SPACES: CODE OF PRACTICE 2016
                                                                                                                                                                                                        BE MADE WITHOUT PRIOR APPROVAL BY THE STRUCTURAL
-    FORMWORK CODE OF PRACTICE 2016                             1.   EARTHWORKS TO COMPLY WITH AS3798.                                                                                                       ENGINEER.
-    HAZARDOUS MANUAL TASKS: CODE OF PRACTICE 2016
-    HOW TO MANAGE WORK HEALTH AND SAFETY RISKS: CODE OF        2.   STRIP SITE OF ALL TOPSOIL, VEGETATION AND DELETERIOUS                                                                          22. CONDUITS CAST INTO CONCRETE MEMBERS SHALL BE SPACED
     PRACTICE 2011                                                   MATTER TO A MINIMUM DEPTH OF 150 mm.                                                                                               AT MAXIMUM    DISTANCE POSSIBLE AND UNDER NO
-    MANAGING NOISE AND PREVENTING HEARING LOSS AT WORK:
                                                                                                                                                                                                        CIRCUMSTANCES CLOSER THAN A CLEAR SPACING OF TWICE
     CODE OF PRACTICE 2015                                      3.   PROOF ROLL SUBGRADE TO REVEAL SOFT SPOTS. SOFT SPOTS                                                                               THE LARGER CONDUIT DIAMETER FROM PARALLEL
-    MANAGING THE RISK OF FALLS AT WORKPLACES: CODE OF               TO BE REMOVED AND BACKFILLED. ALL NATURAL SUBGRADE IS                                                                              REINFORCEMENT OR ANY OTHER CONDUIT.
     PRACTICE 2011                                                   TO BE COMPACTED TO ACHIEVE A DENSITY INDEX OF 70%.
-    MANAGING WORK ENVIRONMENT AND FACILITIES: CODE OF
                                                                                                                                                                                                  23.  ALL SAW JOINSTS SHALL BE CARRIED OUT WITHIN 8 HRS OF
     PRACTICE 2011                                              4.   MATERIAL WON FROM SITE TO BE INSPECTED BY ENGINEER FOR                                                                           POURING OF SLABS USING A "SOFT CUT" SAWOR SIMILAR.
-    MOBILE CRANE: CODE OF PRACTICE 2006                             APPROVAL PRIOR TO USE AS FILLING UNDER SLABS. ANY                                                                                 THE STIME SHALL BE SREDUCED TO 4 HRS WHERE THE
-    SCAFFOLDING: CODE OF PRACTICE 2009                              IMPORTED FILL TO HAVE A MINIMUM CBR VALUE OF 15%. ALL FILL                                                                        TEMPERATURE EXCEEDS 32 DEGREES ON THE DAY         OF THE
                                                                                                                                                                                                                                                                                                                                                                                                   REVISION LIST
-    STEEL CONSTRUCTION: CODE OF PRACTICE 2004                       TO BE COMPACTED TO EITHER CONTROLLED OR ROLLED FILL                                                                          POUR                                                                                                                                                                                             A ORIGINAL ISSUE                                      21/5/25
-    TILT-UP AND PRE-CAST CONSTRUCTION INDUSTRY CODE OF              STANDARD AS SPECIFICAED ELSEWHERE                                                                                                                                                                                                                                                                                             A ORIGINAL ISSUE                                      21/5/25
     PRACTICE 2003
-    TOWER CRANE: CODE OF PRACTICE 2006                         5.   WHERE SERVICE TRENCHES ARE REQUIRED TO BE EXCAVATED
-    WORK HEALTH AND SAFETY CONSULTATION, CO-OPERATION               BELOW FOOTING BASE LEVEL, SIDE OF TRENCH SHALL BE
     AND CO-ORDINATION CODE OF PRACTICE 2011                         LOCATED AWAY FROM SIDE OF FOOTING BY THE SAME DISTANCE
-    SAFE DESIGN OF STRUCTURES CODE OF PRACTICE 2014 OTHER           THAT THE TRENCH IS BELOW FOOTING BASE. WHERE THIS
     REFERENCES:                                                     CANNOT BE ACHIEVED, THE STRUCTURAL ENGINEER SHALL BE
-    NATIONAL CODE OF PRACTISE FOR PRECAST, TILT UP AND              CONTACTED FOR FURTHER DIRECTION.
     CONCRETE ELEMENTS IN BUILDING CONSTRUCTION, 2008
                                                                6.   ALL SOIL CONDITIONS SHALL BE AS PER SPECIFIED
                                                                     GEOTECHNICAL REPORT. WHERE CONDITIONS VARY FROM
                                                                     REPORT THE GEOTECHNICAL ENGINEER SHALL BE CONTACTED
                                                                     FOR DIRECTIONS

                                                                7.   THE CONTRACTOR(S) SHALL FULLY INFORM THEMSELVES OF
                                                                                                                                                                                                                                                                                                                                                                                                  Computer File
                                                                     THE GROUND CONDITIONS ON SITE PRIOR TO COMMENCEMENT
                                                                     OF THE WORKS AND ADOPT SEEPAGE AND DRAINAGE CONTROL
                                                                                                                                                                                                                                                                                                                                                                                                                                    250314OPW.DWG
                                                                     AND CONSTRUCTION PRACTICES APPROPRIATE FOR THE SITE                                                                                                                                                                                                                                                                          DRAWING NUMBER                                      SHEET   REV.

                                                                                                                                                                                                                                                                                                                                                                                                                                     25-0314-IF2        2 B
                                                                     CONDITIONS.
Log in to download the original file

250314OPW-B Operational Works Drawings.pdf · 2.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.