                                                                                                                                                                            SEDIMENT AND EROSION
                                                                                                                                                                              CONTROL DETAILS
                                                                      GRATE TO BE GEOFABRIC
                                                                      WRAPPED.



                                                                                    SPACER BLOCK                        EARTH BUND CONSTRUCTION NOTES
                                                                                                                        1. BUILD WITH GRADIENTS BETWEEN 1 PERCENT AND 5 PERCENT.                                                                                OVERLA                               TRAPPED SEDIMENT
                                                                                                                        2. AVOID REMOVING TREES AND SHRUBS IF POSSIBLE - WORK AROUND THEM.                                                                            ND FLO
            ROLL OF NETTING FILLED
            WITH 50 TO 70mm GRAVEL.
                                                                                                                        3. ENSURE THE STRUCTURES ARE FREE OF PROJECTIONS OR OTHER IRREGULARITIES THAT COULD IMPEDE                                                                   W                       TURF STRIPS
                                                                                                                           WATER FLOW.
                                                                                                                        3. BUILD THE DRAINS WITH CIRCULAR, PARABOLIC OR TRAPEZOIDAL CROSS SECTIONS, NOT V SHAPED.
                                   KERB INLET PROTECTION
                                                                                                                                                                                                                                                                                                                                                                                                                            LINDSAY CONSULTING PTY
                                                                                                                        4. ENSURE THE BANKS ARE PROPERLY COMPACTED TO PREVENT FAILURE.
                                                                                                                                                                                                                                                                                                                                                                                                                              LINDSAY CONSULTING PTY LTD




                                                                                                                        5. COMPLETE PERMANENT OR TEMPORARY STABILISATION WITHIN 10 DAYS OF CONSTRUCTION.
                                                           NTS                                                                                                                                                                                                                                                                                                                                                                                 LTD

                                                                                                                                                  DIRECTION OF FLOW
                                                                                                                                                                                                                                                                                                                                                                                                                                                                             RPEQ 4928
                                   OVERLA                   TRAPPED SEDIMENT
                                                                                                                                                                                                                                                                 TYPICAL GRASS FILTER STRIP DETAIL                                                                                                                          OFF. 2C/82 PARKER STREET, MAROOCHYDORE         PH 54 792 118
                                         ND FLO                                                                                                                                                                                                                                                      N.T.S.
                                                  W                 TURF STRIPS                                                                                                                      BATTER GRADE
                                                                                                                                                                                                     1:2 max.
                                                                                                                                                                                                                                                                                                                                                                                                                           THIS DRAWING REMAINS THE PROPERTY OF
                                                                                                                   CHANNEL STABILISATION
                                                                                                                   AS REQUIRED
                                                                                                                                                                                                                      UNDISTURBED
                                                                                                                                                                                                                      AREA
                                                                                                                                                                                                                                                                                                                                                                                                                           LINDSAY CONSULTING PTY LTD AND IS FOR
                                                                                                                                              NOTE:-
                                                                                                                                              Min. GRADE 0.25%                                                                                                                                                                                                                                                               THE SOLE USE OF THE CLIENT. NO PART
                                                                                                                                              Max. GRADE 0.75%
                       TURF FLARES TO
                                                                                                                                              MUST HAVE A STABILISED OUTLET.
                                                                                                                                              MAYBE USED AS CONTOUR DRAINS
                                                                                                                                                                                                                                                                                                                                                                                                                           MAY BE USED IN PART OR WHOLE WITHOUT
                       RESTRICT SCOURING
                       ALONG TURF EDGE                                                                                                                                                                                                                                                                                                                                                                                        PRIOR EXPRESS WRITTEN CONSENT OF
                         TURF STRIP
                                                                                                                                                                                                                                                                                                                                                                                                                                 LINDSAY CONSULTING PTY LTD
                         BEHIND KERB                                                                                                                        CAN BE CONSTRUCTED WITH
                                                                                                                                          GRADIENT OF DRAIN OR WITHOUT CHANNEL
                                                                                                                                                                           ALL BATTER GRADES
                                                                                                                                                                                                                                                                                                                                          SURFACE ROUGHENING                                                               CLIENT AND PROJECT DESCRIPTION
                                                                       road surface
                                                                                                                                          1% to 5%                         2(H):1(V) MAX.
                                                                                                                                    DIRECTION
                                                                                                                                    OF FLOW

                                                                                                                                150 mm min.                                               300 mm min.
                                                                                                                                                                                                                                                                                                                                                  150 MM MIN.                    SPILLWAY
                                                                                                                                                                                                                                                                                                                                                                                                                             EAGLE SURVEYS
                                                                                                                                                                                                                                                                                                                                                                                 150 MM MIN.
                                     GRASSED     FILTER STRIPS
                                           NOT TO REGULAR SCALE
                                                                                                                                                          2 metres min.
                                                                                                                                            NOTE: ONLY TO BE USED AS TEMPORARY BANK
                                                                                                                                            WHERE MAXIMUM UPSLOPE LENGTH IS 80 METRES.

           STORMWATER TREATMENT DETAILS                                                                                                 EARTH BUND CUT OFF DRAIN                                                                                                  AGGREGATE OR RECYCLED CONCRETE.                                                          ROCK TRENCHED 200 MM INTO GROUND                                  PROPOSED SUBDIVISION
           SEDIMENT FLOCCULATION
           The job of a flocculent is to effectively break down the dominance of the clay particles that contain a residual negative eleCIRCUITro-magnetic charge and thus allowing individual particles
                                                                                                                                                                                                                                                                                                                                  FLO
                                                                                                                                                                                                                                                                                                                                     W                                                                                       33 CRANK STREET,
                                                                                                                                                                                                                                                                                                                                                                                                                             TEWANTIN
           to be drawn together and settle under gravity.

           METHOD OF APPLICATION                                                                                                                                                                                                                                                                                                         SPACING OF CHECK DAMS ALONG CENTRELINE
           Large sediment basins such as the one this site, require that the gypsum is mixed into a slurry with water and then sprayed over the surface of the turbid water in the sediment                                                                                                                                              AND SCOUR PROTECTION BELOW EACH CHECK
           basin.   It is essential that the gypsum is spread evenly over the entire surface for efficient treatment of the turbid water.                                                                                                                                                                                                DAM TO BE SPECIFIED ON SWMP/ESCP
           Generally the gypsum should be applied at a rate of about 32 kgm per 100 cubic metres of detained turbid water, as per the adjacent table.
           should be calibrated after the first two storm events to assess the actual flocculent application rate and settling time required for the site.
                                                                                                                                                            The above dosing rate for the site                                                                                                            ROCK CHECK DAM
           The final application rate should be sufficiently high to permit adequate sediment sediment flocculation (less than 50 NTU) and basin dewatering within two days (48 hours) from the
           conclusion of each storm event, whilst maintaining other required water quality criteria such as pH (6.5 - 8.5) and dissolved oxygen (>80%).                                                                                              ROCK CHECK DAM CONSTRUCTION NOTES
                                                                                                                                                                                                                                                     1. CHECK DAMS CAN BE BUILT WITH VARIOUS MATERIALS, INCLUDING ROCKS, LOGS, SANDBAGS AND STRAW BALES. THE
           METHOD OF TESTING THE STORMWATER
           The stormwater detained in the sediment basin will be tested at a suitable location that will be decided upon at the site. The sample should be taken at a location that has adequate
           access so no sediment is resuspended while the testing is being conducted.
                                                                                                                                                                                                                                                        MAINTENANCE PROGRAM SHOULD ENSURE THEIR INTEGRITY IS RETAINED, ESPECIALLY WHERE CONSTRUCTED WITH STRAW
                                                                                                                                                                                                                                                        BALES. IN THE CASE OF BALES, THIS MIGHT REQUIRE THEIR REPLACEMENT EVERY TWO TO FOUR MONTHS.
                                                                                                                                                                                                                                                     2. TRENCH THE CHECK DAM 200 MM INTO THE GROUND ACROSS ITS WHOLE WIDTH. WHERE ROCK IS USED, FILL THE
                                                                                                                                                                                                                                                                                                                                                                                                                           DRAWING TITLE
                                                                                                                                                                                                                                                                                                                                                                                                                             EROSION CONTROL DETAILS
           The stormwater detained in the sediment basin will be tested with the TPS 90-FLT water quality logger. The TPS 90-FLT unit samples and records the dissolved oxygen, conductivity,                                                           TRENCHES TO AT LEAST 100 MM ABOVE THE GROUND SURFACE TO REDUCE THE RISK OF UNDERCUTTING.
           pH, turbidity and temperature of the stormwater. For further details and specifications on the TPS 90-FLT please refer to Appendix B.                                                                                                     3. NORMALLY, THEIR MAXIMUM HEIGHT SHOULD NOT EXCEED 600 MM ABOVE THE GULLY FLOOR. THE CENTRE SHOULD
           If the TPS 90-FLT unit is not present a practical field test that approximates the required 50 NTU level is to fill a clear plastic or glass 65mm diameter soft drink bottle with the
                                                                                                                                                                                                                                                        ACTING AS A SPILLWAY, BEING AT LEAST 150 MM LOWER THAN THE OUTER EDGES.
           water and then hold it up to the light. If seeing clearly through the sample is not possible, then the sample is probably above the 50 NTU level.
                                                                                                                                                                                                                                                     4. SPACE THE DAMS SO THE TOE OF THE UPSTREAM DAM IS LEVEL WITH THE SPILLWAY OF THE NEXT DOWNSTREAM
                                                                                                                                                                                                                                                        DAM.
           METHOD OF DEWATERING
           The sediment basin can be dewatered as soon as the water quality criteria met (refer table below). A pump is to be used to decant the basin with a floating inlet to prevent the
           settled sediments from being removed from the basin. The pumping must cease prior to the settled sediments being drawn into the intake pipe, it is essential that materials from
           the sediment layer are not discharged in the pumping process.                                                                                                                                                                                                                                                                                         STABILISE STOCKPILE
                                                                                                                                                                                                                                                                                                           .)                                                    SURFACE
                                                                                                                                                                                                                                                                        EARTH BANK                        X
                                                                                                                                                                                                                                                                                                       (MA                                2:1
                                                                                                                                                                                                                                                                                                  PE                                            SLO
                                                                                                                                                                                                                                                      FLOW                                     SLO                                                    PE
             STORMWATER DISCHARGE QUALITY CRITERIA                                                                                                                                                                                                                                       2:1                                                               (MA
                                                                                                                                                                                                                                                                                                                                                                 X.)
              ACCEPTABLE TSS                      ACCEPTABLE PH                   DISSOLVED O2                                                                                                                                                                                                                                                                                                                             SCALES
              50mg/L                                      6.5 - 8.5                   > 80%                                                                                                                                                                                                                                                                     SEDIMENT FENCE
                                                                                                                                                                                                                                                                                                     TOPSOIL STOCKPILE
                                                                                                                                                                                                                                                       TOPSOIL STOCKPILE CONSTRUCTION NOTES
             SEDIMENT BASIN FLOCCULENT APPLICATION                                                                                                                                                                                                     1. PLACE STOCKPILES MORE THAN 2 (PREFERABLY 5) METRES FROM EXISTING VEGETATION, CONCENTRATED
                                                                                                                                                                                                                                                          WATER FLOW, ROADS AND HAZARD AREAS.
            AGENT           INDICATIVE DOSAGE                         COMMENTS                               PRECAUTIONS & CONSTRAINTS                         MIN. REQD. ON SITE                                                                      2. CONSTRUCTION ON THE CONTOUR AS LOW, FLAT, ELONGATED MOUNDS.
                                                                                                                                                                                                                                                       3. WHERE THERE IS SUFFICIENT AREA, TOPSOIL STOCKPILES SHALL BE LESS THAN 2 METRES IN HEIGHT.
                                                                                                                                                                                                                                                       4. WHERE THEY ARE TO BE IN PLACE FOR MORE THAN 10 DAYS, STABILISE FOLLOWING THE APPROVED
              GYPSUM        32kg/100cub.m                             LITTLE PH CHANGE, SLIGHT INCREASE IN   NEEDS TO BE SPREAD EVENLY ACROSS POND.          260 kgm                                                                                      ESCP OR SWMP TO REDUCE THE C-FACIRCUITOR TO LESS THAN 0.10.
                                                                      SALINITY                               CAN CAUSE SCUM DEPOSITS IN EQUIPMENT.                                                                                                     5. CONSTRUCTION EARTH BANKS (STANDARD DRAWING 5-5) ON THE UPSLOPE SIDE TO DIVERT WATER AROUND
                                                                                                                                                                                                                                                          STOCKPILES AND SEDIMENT FENCES (STANDARD DRAWING 6-8) 1 TO 2 METRES DOWNSLOPE.
             NOTE: NOTIFY ENGINEER TO CONFIRM DOSAGES & APPLICATION PRIOR TO USE.




                                                      OPEN CONCRETE BLOCKS                                                                                      SEDIMENT AND EROSION
                                                                                                                                                                  CONTROL DETAILS
                                                                                                                                               ALL EROSION AND SEDIMENT IN ACCORDANCE WITH IN ACCORDANCE WITH                                                                            UNDISTURBED AREA                                                                                                                  SURVEY DATUM
                                                                                                                                                 WITH MAROON BOOK MANUAL FOR EROSION AND SEDIMENT CONTROL
                                     GRAVEL FILTER
                            SANDBAG OVERLAP                      4.0m MIN.
                                                                                                                                                                                                                                                                                                                                                                                                                            .
                            ONTO KERB
                                                                                                                                                GEOTEXTILE             STAKES
                                                                                                                                               FILTER FABRIC                                                        STAKES
                                                                                                                                                                                                                                        DROP INLET                                                                                                              1.5m TIMBER STAKES
                                                                                                                                              RUNOFF WATER                                                                              WITH GRATE
                          RUNOFF
                                        1.5m M                                                                                                WITH SEDIMENT
                                                                                                                                                                                                                                                                                                       DISTURBED
                                                                                                                                                                                                                                                                                                                                                                AT MAX 2.5m CENTRES
                                                                                                                                                                                                                                                                                                                                                                                                                           ASSOCIATED CONSULTANTS
                                                                                                                                                          0.2m                                                                                                                                         AREA
            600mm (NOM) GAP
                                            IN.

                                                                                                                                                                                                                                                                                                                           DIRECTION OF FLOW
            BETWEEN SAND BAGS                                                                                                                                             FILTERED              GEOTEXTILE
            ACT AS SPILLWAY
                THREE LAYERS OF
                SANDBAGS WITH ENDS
                                                                                                                                             BURIED FABRIC                 WATER                FILTER FABRIC
                                                                                                                                                                                                                                                                                                                                   SEDIMENT FENCE
                OVERLAPPED.
              DOWN STREAM GULLY    PROTECTION DETAILS                                                                                                            GEOTEXTILE INLET FILTER                                                        STAKES CIRCUITN INTO GROUND                                   W
                                                                                                                                                                                                                                                                                                         FLO
                           NOT TO SCALE                                                                                                        GEOTEXTILE INLET FILTER CONSTRUCTION NOTES                                                                            FL
                                                                                                                                                                                                                                                                       OW
                                                                                                                                               1. FABRICATE A SEDIMENT BARRIER FROM GEOTEXTILE.                                              GEOTEXTILE FILTER FABRIC
                                                                                                                                               2. FOLLOW DETAIL FOR SEDIMENT FENCE FOR GEOFABRIC
                                                                                                                                                  INSTALLATION. REDUCE PICKET SPACINGS TO 1m CENTRES.
                                                                         BURY THE TOP OF THE PLASTIC                                           3. DO NOT COVER THE INLET WITH GEOTEXTILE UNLESS THE
                                                                         IN TRENCH MIN 300mm DEEP.                                                DESIGN IS ADEQUATE TO ALLOW FOR ALL WATERS TO                                                                                                                                                       23
                        FLOW                                             STAPLE AT 150mm CENTRES.                                                                                                                                                                                                                      W                                                24
                                                                                                                                                  BYPASS IT.                                                                                                                                                        FLO




                                                                                                                                                                                                                                                                                                                                                                                     25
                                                                         COMPACT SOIL OVER BLANKET




                                                                                                                                                                                                                                                                                                                                                                                                26
                                                                                                                                                                                                                                                                                                                                                PRO                                       A
                                                                                                                                                                                                                                                                                                                                                   PER
         CENTRELINE SECTION AT POINTS "A"                                                                                                                                                                                                                                                                      HOLD IN PLACE                               TY
                                                                                                                                                                                                                                                                                                                                                                LINE                                 90 DEG
                                                                                                                                                                                                                                                                                                               WITH SAND BAGS                                                        SEDIMENT
                                                                      FILL TRENCH WITH SOIL                                                                                                                                                                                                                                                                                           TRAP
                                                                                                                                                                                                     t                                                                                   GEOTEXTILE FILTER SOCK
                                                                      AND COMPACT                                                                                                               men
                                                                                                                                                                                                                                                                                                                                                                                          A
                                                                                                                                                                                                                                                                                         FILLED WITH 25MM GRAVEL
                                                                                                                                                                                           lign
        OVERLAP-BURY UPPER END OF                                                                                                                                   15.                ty A
                                                                   STAPLES: 8 GAUGE                                                                                MIN 0m           per
    LOWER BLANKET AS IN "A". OVERLAP                                                                                                                                            Pro
     END OF TOP BLANKET 300mm AND
                 STAPLE AT 150 CRS.
                                                                   (4mm) WIRE                                                                                                              Berm (300mm MIN height)
                                                                                                                                                                                                                                                     KERB INLET PIT SEDIMENT BARRIER



                                                                                                                                        NOM
                                                                                                                                                                                                                                                                                                                                                                             SEDIMENT




                                                                                                                                        200
                                                                                                                                                                                                                                                                                                                                                                              TRAP
                          FLOW
                                                                                                                                                                                                                                                                                                                                                                       50m                      NOTE: POINTS A AT SAME
                                                                                                                     Geotextile fabric,                                                                                                                                                                                                                                        MAX              ELEVATION
                                                                                                                     Bidum U34 or similar
                                                                                                                                                                            3.0mN                                                           1.5m TIMBER STAKES
            CENTRELINE SECTION AT POINTS "B"                                                       Unbound pavement material (gravel) to Grading
                                                                                                   B, Table 9 of QT Specification MRS11.05,
                                                                                                                                                                              MI
                                                                                                                                                                                              cha
                                                                                                                                                                                                  nne
                                                                                                                                                                                                      l
                                                                                                                                                                                                            dwa
                                                                                                                                                                                                                y
                                                                                                                                                                                                                                            AT MAX 2.5m CENTRES
                                                                                                                                                                                                                                                                                 SELF-SUPPORTING
                                                                                                                                                                                                                                                                                 GEOTEXTILE                                                       SEDIMENT FENCES
                                                                                                                                                                                           &            roa
                                                                                                   exclude material finer than sieve 2.36mm                                      Ker b
                                                                                                                                                                                               or
                                                                                                                                                                                                   ne w
                                                                                                                                                                                                                                                                              DIRECTION OF
                                                                                                                                                                                                                                                                                                                                           Sedi
                                                                                                                                                                                                                                                                                                                                           - uncontouredFenceconcentrati
                                                                                                                                                                                                                                                                                                                                                ment             installeond ofacross  thed contour
                                                                                                                                                                                                                                                                                                                                                                                 flow shoul  be avoided
                                                                                                                                                                                    i s t ing,                                      500mm TO 600mm                            FLOW
                                                           A                                                                                                                     Ex                                                                                                                                                                                    NOT TO REGULAR SCALE


                                                                                                                            Runoff from pad directed to sediment trap                                                                 600mm MIN                                      ON SOIL, 150mm x 100mm
                                                                                                                                                                                                                                                                                     TRENCH WITH COMPACTED
                                                                                                                                                                                                                                                                                     BACKFILL AND ON ROCK, SET
                                                      B                                                               TEMPORARY CONSTRUCTION ENTRY/EXIT SEDIMENT TRAP
                                                                                                                       Not to Scale
                                                                                                                                                                                                                                                     SECTION DETAIL                  INTO SURFACE CONCRETE                                                                                                                REVISION LIST
     STAPLE BLANKETS
                                                                                                                                                                 CATTLE GRID 3.0m NOM WIDTH                                                                                                                                                                                                                               A ORIGINAL ISSUE                                      21/5/25
                                                                                                                                                                     SET 300mm ABOVE GROUND
          AT GRID OF
         1m CENTRES
                                                                                                                                        CONSTRUCTION SITE MIN
                                                                                                                                                              5m
                                                                                                                                                                                                        T
                                                                                                                                                                                                                                                                                                                                                                                                                          A ORIGINAL ISSUE                                      21/5/25
                                             B                                                                                                                                                      MEN
                                                                                                                                                  NOM




                                                                                                                                                                                               LIGN
                                                                                                                                                  200




                                                                                                                                                                                              A
                                                                                                                                                                      10                   TY
                                                                                                                                                                   MIN m               PER       EL                                                                                                                                      ;SEDIMENT FENCE CONSTRUCTION NOTES
                                        B                                                                                                                                           PRO HANN                                                                                                                                             1. CONSTRUCTION SEDIMENT FENCES AS CLOSE AS
                                              FLOW




                                                                                                                                                                                          C       AY
                                                                                                                 GEOFABRIC FABRIC, BIDIM A34                                          B&      ADW                                            KERB INLET PIT SEDIMENT BARRIER                                                             POSSIBLE TO BEING PARALLEL TO THE CONTOURS OF THE
                                                                                                                                                         300




                                                                       STAPLE OUTSIDE EDGES                      OR SIMILAR                                            m           KER EW RO                                                 CONSTRUCTION NOTES                                                                          SITE, BUT WITH SMALL RETURNS. THE CATCHMENT AREA
                                                                       AT 300mm CRS.                                                                               3 IN                N                                                                                                                                                 SHOULD BE      SMALL ENOUGH TO LIMIT WATER FLOW IF
                                                                                                                                                                     M              OR                                                       1. FABRICATE A SLEEVE FROM GEOTEXTILE OR WIRE MESH                                          CONCENTRATED AT ONE POINT.
                                                                                                                                                                           TI N G,                                                              LONGER THAN THE LENGTH OF THE INLET PIT AND FILL                                         2. CUT A 150-mm DEEP TRENCH ALONG THE UPSLOPE
                                                                                                                 RUNOFF TO BE DIRECTED TO A SEDIMENT TRAP,               S
                                                                                                                                                                   EXI
                       CLEAN/DIRTY DIVERSION DRAINS                                                              REFER STANDARD DRAWING D-0041.                                                                                                 WITH 25mm TO 50mm GRAVEL.
                                                                                                                                                                                                                                             2. FORM AN ELLIPTICAL CROSS-SECIRCUITION APPROX. 150mm
                                                                                                                                                                                                                                                                                                                                         LINE OF THE FENCE FOR THE BOTTOM OF THE FABRIC TO
                                                                                                                                                                                                                                                                                                                                         BE ENTRENCHED.
                                                                                                                                TEMPORARY ENTRY/EXIT                                                                                            HIGH, 400mm WIDE.
                                                                                                                                                                                                                                             3. PLACE THE FILTER AT OPENING LEAVING AT LEAST
                                                                                                                                                                                                                                                100mm BETWEEN KERB INLET AND SLEEVE. MAINTAIN
                                                                                                                                                                                                                                                                                                                                         3. CIRCUIT TIMBER STAKES INTO GROUND AT 2.5m
                                                                                                                                                                                                                                                                                                                                         INTERVALS (MAX) AT THE DOWNSLOPE EDGE OF THE TRENCH.
                                                                                                                                                                                                                                                                                                                                         4. FIX SELF-SUPPORTING GEOTEXTILE TO THE UPSLOPE
DIVERSION DRAIN CONSTRUCTION NOTES                                                                                                                                                                                                              OPENING WITH SPACER BLOCKS.                                                              SIDE OF THE POSTS ENSURING IT GOES TO THE BASE OF
                                                                                                                                                                                                                                             4. FORM A SEAL WITH KERB TO PREVENT SEDIMENT                                                THE TRENCH. FIX THE GEOTEXTILE WITH WIRE RECOMMENDED
1. REMOVE ANY ROCKS, CLODS, STICKS OR GRASS FROM THE SURFACE BEFORE LAYING PLASTIC.
                                                                                                                 TEMPORARY ENTRY/EXIT CONSTRUCTION NOTES                                                                                                                                                                                 BY THE MANUFACTURER. THE USE OF SHADE CLOTH FOR
                                                                                                                                                                                                                                                BYPASS.
2. ENSURE THAT TOPSOIL IS AT LEAST 75mm DEEP.                                                                                                                                                                                                5. SANDBAGS FILLED WITH GRAVEL CAN SUBSTITUTE FOR                                           THIS PURPOSE IS NOT SATISFACTORY.
                                                                                                                 1. STRIP THE TOPSOIL, LEVEL THE SITE AND COMPACT THE SUBGRADE.                                                                                                                                                          5. JOIN SECTIONS OF THE FABRIC AT A SUPPORT POST
3. ENSURE PLASTIC WILL BE CONTINUOUSLY IN CONTACT WITH THE SOIL BY GRADING THE SURFACE                           2. COVER THE AREA WITH NEEDLE-PUNCHED GEOTEXTILE.                                                                              THE MESH OR GEOTEXTILE PROVIDED THEY ARE PLACED
   CAREFULLY FIRST.                                                                                                                                                                                                                             SO THAT THEY FIRMLY ABUT EACH OTHER AND                                                  WITH A 150mm OVERLAP.
                                                                                                                 3. CONSTRUCTION A 200mm THICK PAD OVER THE GEOTEXTILE USING ROAD BASE OR 30mm.                                                                                                                                          6. BACKFILL THE TRENCH OVER THE BASE OF THE FABRIC
4. LAY FABRIC IN "SHINGLE FASHION", WITH THE END OF EACH UPSTREAM ROLL OVERLAPPING THOSE                         4. ENSURE THE STRUCTURE IS AT LEAST 15m LONG OR TO BUILDING ALIGNMENT AND AT                                                   SEDIMENT LADEN WATERS CANNOT PASS BETWEEN.
   DOWNSTREAM. ENSURE EACH ROLL IS ANCHORED PROPERLY AT ITS UPSLOPE END.                                                                                                                                                                                                                                                                 AND COMPACT IT THOROUGHLY OVER THE GEOTEXTILE.                                  Computer File
                                                                                                                    LEAST 3m WIDE.
5. ENSURE FULL WIDTH OF FLOW CHANNEL IS COVERED BY THE PLASTIC.                                                  5. WHERE SEDIMENT FENCE JOINS ONTO THE STABILISED ACCESS, CONSTRUCTION A HUMP OR
                                                                                                                    GRATE IN THE STABILISED ACCESS TO DIVERT WATER TO THE SEDIMENT FENCE.                                                                                                                                                                                                                                                                  250314OPW.DWG
                                                                                                                                                                                                                                                                                                                                                                                                                         DRAWING NUMBER                                      SHEET   REV.

                                                                                                                                                                                                                                                                                                                                                                                                                                                            25-0314-C4         4 B
Log in to download the original file

250314OPW-B Operational Works Drawings.pdf · 2.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.