Approved Plans MCU21-0206 & OPW21-0341
Original PDF page 9, section 1. The text section number identifies this passage in the reader.
NOOSA COUNCIL
APPROVED PLAN
MCU21/0206 & OPW21/0341
26 APRIL 2022
IVE m
IVE m T
As annotated by Council
T NA 0.40
NA 0.30 T 7m
T 4m S 15m
S 10m H
IVE m IVE m IVE m IVE m H
T T IVE m T T
NA 0.30
NA 0.30 NA 0.60 T NA 0.40
T 6m NA 0.60 T 5m
T 6m T 6m
S 18m S 18m T 6m
S 18m S 18m
H S 16m H
H H H
119.11
118.37
117.26
116.92
116.42
116.69
116.61
129°44'50"
43.225
116.07
116.48
REFER TO APPROVED DRAWINGS BY "
EXISTING LANDSCAPE
117.55
PLACE DESIGN GROUP" FOR EXISTING
118.20
118.82
116.67
118
BUFFER LANDSCAPE PLANTS
7
434.3m2
11
116.28
Ban rob Acm smi Cal tar Acm smi Ban rob Acm smi Cal tar Acm smi Ban rob Acm smi Cal tar Acm smi
115.92
9
(3) (1) (3) (1) (3) (1) (3) (1) (3) (1) (3) (1)
11
119.46
120.28
115.78
116.02
116
IVE m
116.36 116.00
116.98
Lom lon T
NA 0.40 m
118.81
117.70
(58)
T S7 m
Vegetation
120.46
18
116.21
116.12
RETAINING
120.30
120.07
WALL TO
ENGINEERS
Buffer H Aus dul (18)
119.86
DETAILS
8
119.76
116.3
119.75
120.55
115.65
Dia bre (9) Dia bre (9) Dia bre (9) Aus dul (8) Dia bre (9) Dia bre (9) Dia bre (9)
120.98
Aus dul (12) Hib sca (8) Hib sca (8) Aus dul (8)
LANDSCAPE PART 4
L4 1 : 150 6 Lorraine Avenue
Marcoola Beach, QLD, 4573
07 5448 8500
[email protected]
www.buildingsuncoastgreen.com.au
QBCC Licence No. 65942
Y 28.03.22 MEZZANINE CHANGES SB DJ
S-W 11.03.22 NORTH ELEVATIONS CHANGES SB DJ
R 21.02.22 RFI / CIVIL CHANGES SB DJ
Q 07.02.22 DIMS TO EXIST. TREE TRUNKS SB DJ
P 02.02.22 SITE COVER ADDED SB DJ
O 28.01.22 REMOVED TREES & RE-LABLED SB DJ
N 19.01.22 RFI CHANGES SB DJ
M 14.01.22 INSERT SURVEY / EXISTING TREES SB DJ
L 26.11.21 CARETAKER REDUCED SB DJ
K 22.11.21 CIVIL DWGS / LANDSCAPE PLAN SB DJ
J 29.09.21 ENGINEERS FFL / AREAS /OPENINGS SB DJ
I 16.08.21 MEZZ / HEIGHTS / STAIRS ALTERED SB DJ
H 22.07.21 CLIENT RE-DESIGN SB DJ
G 21.05.21 RE-CALCULATE AREAS SB DJ
F 06.05.21 NEW LAYOUT / AV TURNING SB DJ
E 19.04.21 CLIENTS CHANGES TO BUILDING SB DJ
D 12.04.21 AV TURNING PATH /ALTERED BUILDING SB DJ
C 12.03.21 CLIENTS OPTION / 3D VIEWS SB DJ
B 19.02.21 BUILD TO SOUTHERN BOUNDARY SB DJ
A 12.02.21 SKETCH DRAWINGS SB DJ
Issue Date Subject Initial Auth
Amendments
Client DANIEL EJMONT
LOT 2 & 3 TAYLOR COURT, COOROY,
QLD
Drawing Description
LANDSCAPE PLAN 4
Drawn SB Checked DJ
Scale As indicated Date 12.02.21
Project No. 2021-08 Sheet No. 09 OF 11
CONCEPT DWGS Issue
Y
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Approved Plans MCU21-0206 & OPW21-0341.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.