Delegated Report - Code - Planning OPW25 0174 (As Published) · OPW25/0174
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
968 CD01 Driveway 20 October
2025
Prepared by Robinson Architects
As annotated by Council
CURRENCY PERIOD
2. The Currency Period for this development approval lapses if the development has not
substantially started by 11 November 2027, unless an application to extend the currency
period is approved by Council.
SITE SPECIFIC CONDITIONS
3. The Arakoon Crescent road carriageway must be constructed to achieve a minimal width of
3.2 metres measured from the existing western edge of the road edge to the new eastern
edge.
All pavement widening or construction of new pavement must join neatly to the existing
pavement so that there are no irregularities in line or level resulting at or adjacent to the join
for the length of the construction. Where necessary the existing pavement must be brought
to a satisfactory standard to allow for the above.
4. All works in Council’s road reserve must not present as a trip hazard to pedestrians.
5. Install a high-contrast corner marker at the wall’s lower corner (or an equally effective
delineator) to clearly define the corner of the retaining wall.
6. Landscaping as a fall protection treatment must:
a. Include species consistent with the approved species list for the character area in The
Noosa Plan 2020 – Planning Scheme Policy 2 (SC6.3).
b. Be located to avoid impeding on vehicle sight lines.
PRIOR TO COMMENCEMENT OF WORKS
Engineering
7. All necessary approvals from external service providers (eg Unitywater) and external parties
on which the development works are proposed have been obtained and a copy supplied to
Council.
8. Certificates demonstrating currency of public liability insurance and works insurance covering
the works must be submitted to Council prior to any works commencing.
9. Any changes to the details associated with the supervising RPEQ or Principal Contractor
during construction, must be notified to council in writing within five business days of the
change occurring.
10. Any conflict between the development and an existing or proposed service must be referred
to the relevant service authority for determination prior to commencement of works.
DURING CONSTRUCTION
Engineering
Page 4 of 9
Document Set ID: 24276062
Version: 2, Version Date: 11/11/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning OPW25 0174 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 384 KB (small file)
- File type
No other editions are linked here.