Council archive · source document
Decision Notice - 010.2006.00001065.001 [As Published] · 142006.1065
Officer: Tracy Arthur
Direct Telephone: (07) 5449 5228
Response Address: PO Box 141, Tewantin QLD 4565
Email: [email protected]
Our Reference: 2006/1065
Your Reference:
18 March 2008
G & M Mann
CARE Kidd & Co Designers
PO Box 262
NOOSA HEADS QLD 4567
Dear Sir/Madam
Decision Notice
Integrated Planning Act 1997
I refer to your application and advise that on 14 March 2008 Council decided to approve the
application in full subject to conditions.
Details of the decision are as follows:
1 APPLICATION DETAILS
Application No: 2006/1065
Street address: 3 Henderson Street, Sunshine Beach, 1/3 Henderson Street,
Sunshine Beach & 2/3 Henderson Street, Sunshine Beach
Real property description: Lot 0 BUP 4358, Lot 1 BUP 4358 & Lot 2 BUP 4358
Planning Scheme: The Noosa Plan
2 DECISION DETAILS
The following type of approval has been issued:
Preliminary Approval for Operational Works - Landscaping, Access, Stormwater Disposal,
Sediment & Erosion Controls & Excavation of The Site
3 REVELANT PERIOD OF APPROVAL
This Preliminary Approval lapses if the development has not happened by 14 March 2010,
unless application to extend the relevant period is approved by Council.
4 ASSESSMENT MANAGER CONDITIONS
Landscaping
1. Prior to the issue of a Development Permit for Operational Works, the following is required:-
1.1. Evidence of the paid Portable Long Service Levy form or written advice that works will
not exceed $80,000; and
1.2. Payment of all bonds and contributions required by the conditions of Material Change
of Use approval (06/0271);
1 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 10 pages
Page 2
-2-
1.3. An amended landscaping plan addressing the issues raised by Conditions 3 – 8 of the
Preliminary Approval.
2. The site is to be landscaped generally in accordance with:
Plan / Rev. Plan / Document Name Date
Document No.
Council’s Policy on Landscaping Guidelines
PP-HEND OP2 Planting Plan – EDAW I AECOM 03/04/2007
and amended by these conditions and notations on the Landscaping Plan.
3. All Stenocarpus sinuatus (Wheel of Fire Tree) species are to be deleted, as they are not
identified as a desirable species under Council’s Planning Scheme. This species shall be
substituted with Elaeocarpus eumundii (Eumundi Ash) and Cupaniopsis anacardioides
(Tuckeroo) species of the same size and be consistent with that proposed along the northern
boundary.
4. Acmena Smithii (Lilly Pilly) species shall be provided along full length of southern and northern
boundaries to achieve screening to a suitable height. Planting shall also occur in the south
western and north western corner adjacent to the swimming pools where no garden beds are
currently proposed.
5. All Elaeocarpus eumundii (Eumundi Ash) species are to be substituted with Elaeocarpus
reticulatus (Blueberry Ash) species, as a more desirable plant species for the coastal areas in
accordance with Council’s Planning Scheme Policy.
6. All Archontophenix cunninghamiana (Bangalow Palm) species are to be deleted, as they are
not a suitable plant for the coastal areas under Council’s Planning Scheme Policy. As other
recommended plantings will serve as a suitable replacement for achieving screening along the
site’s side boundaries.
7. All Linospadix monostachya (Walking Stick Palm) species are to be deleted, as they are not
identified as a desirable species under Council’s Planning Scheme.
8. Two Elaeocarpus reticulatus (Blueberry Ash) species are to be located in the vicinity of the
rear of the building as replacement to the deletion of Linospadix monostachya (Walking Stick
Palm) species and distributed as one for each dwelling unit.
9. Fencing along the northern side of the driveway shall be setback at least 1 metre from the
front property boundary, to comply with Condition 5 of MCU approval (06/0271).
10. The landscape construction is to be implemented in accordance with the amended landscape
plan, planting schedule and horticultural industry best practices.
11. All manholes, inspection pits and grates are to be raised to finished surface levels and kept
free of cover and be visible at all times to ensure prompt access in case of emergency.
12. All trees must be planted a minimum of 1 metre from all services.
13. This Preliminary Approval lapses if the development has not happened by 14 March 2010,
unless application to extend the relevant period is approved by Council.
Environmental Health
14. A waste management plan in accordance with Condition 58 of the MCU approval (06/0271)
shall be submitted prior to the pre-start meeting.
Land Development
15. The development shall be carried out in accordance with:
2 of 11
Page 3
-3-
Plan / Rev. Plan / Document Name Date
Document No.
16076-OW2 C Driveway & Drainage – SCG Consulting 08.10.07
Engineers
16076-C1 A Sewer Main Relocation – SCG 19.12.06
Consulting Engineers
16076-OW1 C Operational Works – SCG Consulting 08.10.07
Engineers
WD.201 T1 Basement Floor Plan – Kidd Co Jan ‘07
Designers
or as modified herein.
16. Excavation of the site and the construction of the proposed works shall not have any adverse
affects on the stability of adjoining buildings and/or structures and/or services and/or lands. In
this regard a Registered Professional Engineer Queensland shall supervise the excavation of
the site and the construction of the new works to determine whether any additional measures
are required to protect the stability of adjoining buildings and/or structures and/or services
and/or lands.
17. The use of vibratory equipment of any kind, (including vibrating rollers and the use of vibrating
installation techniques for sheet piling and other construction vibrations caused by excavating,
earthmoving or demolition machinery or other similar construction techniques) shall be
supervised by a Certified Geotechnical Engineer. Under such circumstances the operator of
such equipment shall at all times comply with the directions of the Geotechnical engineer and
the reasonable and lawful directions of Council officers.
18. All parts of the works (including excavation, retaining structures, tie backs etc) are to be wholly
contained within the subject site. Any subground structures (support anchors, tie backs etc) to
be utilized into adjoining properties, shall only be used if written permission has been granted
by the adjoining property owners.
19. Certification of the completed works must be provided to Council by the supervising engineer.
The certification shall state that the completed works conform with all aspects of the design
and that the completed works will not have any adverse affects on the stability of adjoining
buildings and/or structures and/or services and/or lands.
20. Roof and surface runoff connection to Council’s kerb and channel shall be as shown on
drawing No. 16076-OW2C. Kerb adaptors shall be used in the kerb.
21. A Traffic Management Plan for the development addressing all construction phases shall be
prepared by suitably qualified persons and submitted to Council for approval prior to the pre
start meeting. The report shall address, but not be limited to, all items listed below, further the
plan shall be flexible that it addresses all stages of the development:-
21.1. A single nominated access location to from the site.
21.2. The plan should detail the routing of trucks to and from the site.
21.3. Provision of onsite parking for personnel working on this development, as there is
limited parking available in adjacent streets.
21.4. Provision of safe cycle and pedestrian movements around the development on
Henderson Street.
21.5. No queuing of trucks is permitted on residential streets, especially prior to 7.00am.
Further parked trucks must have engines turned off.
21.6. Provision of signage and traffic controllers in accordance with Manual of Uniform
Traffic Control Devices and Traffic Infrastructure (Roads) Act.
3 of 11
Page 4
-4-
21.7. Provide an indication where the surplus spoil is to be transported to, and/or source of
imported fill material.
22. Suitable sediment control devices ("in pit” pollution control devices) shall be temporarily
installed into the first existing external downstream stormwater structure. These devices are
to be checked and cleaned on a regular basis and specifically after each rain event. These
devices are to remain in place during the civil works and construction phases of the
development. The location and type of device to be installed shall be established at the “pre
start” meeting with Council’s Construction Technical Officer and shall be installed prior to the
commencement of any works.
23. Council’s Construction Technical Officer Michael Conroy (ph 0410 512 505), shall be given
seven (7) days’ notice of intention to commence works to arrange a “pre start” meeting prior to
the commencement of works.
24. The principal contractor must have all the appropriate insurance and public liability
documentation to carry out the works. The principal contractor is also responsible to ensure
that any sub contractors also have the appropriate insurance and public liability
documentation.
25. Prior to the “pre start” meeting, the principal contractor must be provided with a copy
of Council’s signed approved drawings and conditions by the applicant.
26. The Consulting Engineers for the project shall be currently Registered Professional Engineers
of Queensland (RPEQ). The consulting engineers are responsible for arranging all
inspections, with Council’s Construction Technical Officer or nominated staff.
27. Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the
project. (This person will be the contact for the project).
28. Council standards shall apply to these works unless otherwise modified herein.
29. The person acting on this permit shall ensure that its consultants and contractors take all
reasonable care during the construction of the engineering works to ensure that Council
property, road pavements or facilities (such as underground drainage, water supply,
sewerage, footpaths, kerbing, landscaping, street furniture etc.) are protected against any
damage or interference whatsoever.
If any Council property or facilities should be damaged by the Applicant or any of its
Consultants or Contractors through any cause whatsoever in the course of, directly or
indirectly, carrying out the engineering works, the Applicant and/or its Contractors shall
forthwith notify the Manager Land Development and shall forthwith rectify the damage to that
property or facility at its cost and to the satisfaction of the Manager Land Development.
All rectification works are to be completed prior to the commencement of the use or,
alternatively, the Applicant may request the Council to carry out the rectification work at the
Applicant’s cost, such cost being paid by the Applicant to the Council prior to the
commencement of the use.
In the case of any emergency the Council shall be entitled to rectify such damage at the cost
of the Applicant, such cost being paid prior to the commencement of the use.
30. The development of the site shall be carried out in such a manner as to prevent dust and/or
sand nuisance to residents and/or tenants in the vicinity of the development.
31. Construction work and other associated activities are permitted only during the hours of 7.00
am and 6.00 pm Monday to Saturday. No work is permitted on Sundays or public holidays,
except where extended hours are approved by the Manager-Land Development or his
nominee.
32. All signage, including that for safety during construction shall be in accordance with the
Manual of Uniform Traffic Control Devices and Traffic Infrastructure (Roads) Act.
4 of 11
Page 5
-5-
33. Safe pedestrian access on Henderson Street shall be maintained at all times. Should
footpath / road closures be necessary to carry out construction works, Council’s Construction
Technical Officer (ph 0410 512 505) must be notified prior to the proposed closure.
34. Sediment and erosion control measures must be in place prior to works commencing. If such
measures are not in place or are not satisfactory, “on the spot “fines may be issued. Such
fines can be issued if sediments from the site are found to enter or have the potential to enter
Council’s stormwater system or natural waterways. Although the sediment and erosion control
measures have been approved on drawing No. 16076-OW1C, Council’s Manager – Land
Development may request further controls to be installed should approved measures be
inefficient.
35. The owners of the subject property shall maintain the grease/oil arrestor pits/gross pollutant
traps in accordance with the manufacturers specifications.
36. The owners of the subject property shall inspect the grease/oil arrestor pits/gross pollutant
traps on a weekly basis and after each storm event. The owners of the subject property shall
enter into an ongoing maintenance contract with a Registered Contractor to clean and
maintain the grease/oil arrestor pits/gross pollutant traps on a regular three monthly cycle and
on a “On Call” basis in the case of an emergency. The management and maintenance of the
grease/oil arrestor pits/gross pollutant traps shall be included in the Community Management
Scheme for the completed development.
37. These works are also to be in compliance with the relevant conditions of Development Permit
No. 2006/0271.
38. Notwithstanding that Council has checked the plans with due care, where it is found during
construction that variations from Council's standards exist, then Council standards shall apply.
Water & Sewerage
39. The development shall be carried out in accordance with sewerage plans 16076 – C1A –
Sewer Main Relocation.
40. A sewer house connection branch is to be provided in manhole SB06/57/02a to service proposed
development and shall be a maximum of 1.5 meters deep.
41. A copy of the job specification is to be provided to Council’s Inspector within seven (7) days of the
date of this Decision Notice, and prior to commencement of works.
42. The names of any proposed contractors for works are to be submitted in writing, together with
copies of current Public Liability and Workers Compensation Insurances together with certificates
of currency for those policies, for consideration by the Assessment Manager seven (7) days prior
to pre-start meetings and commencement of works.
A separate letter will then be issued approving the contractor (or otherwise) for the works. No
other contractor or subcontractor shall be engaged to carry out the works or any part of the works
without the written approval of the Assessment Manager.
43. Council’s Water & Sewerage Inspector shall be given (7) days notice of intention to commence
works. A pre-start meeting shall be arranged prior to commencement of works by contacting
Council’s Water & Sewerage Inspector, Mr Trevor Mourilyan, Ph. 0417 780 830. Inspector is only
available for pre-start meetings, inspections and testing etc. between the hours of 6:30am to
4:00pm, Monday to Friday. Inspector will not be available outside these hours unless prior
approval is obtained from the Water & Sewerage Capital Works Manager with any costs incurred
by Council outside the hours nominated above, met by the Contractor/Developer. These costs
will be in addition to normal inspection fees.
44. Notwithstanding that Council has checked the plans with due care, where it is found during
construction that variations exist with Council's standards, Council standards shall apply.
45. It is the responsibility of the applicant to ensure that its consultants and contractors take all
reasonable care during the construction of the engineering works to ensure that Council property
or facilities (such as underground drainage, water supply and sewerage) are protected against
any damage or interference whatsoever.
5 of 11
Page 6
-6-
46. If any Council property or facilities should be damaged by the applicant or any of its consultants or
contractors through any cause whatsoever in the course of, directly or indirectly, carrying out the
engineering works, the applicant and/or its contractors shall forthwith notify the Assessment
Manager and shall forthwith rectify the damage to that property or facility at its cost to the
satisfaction of the Assessment Manager prior to the sealing of the survey plan and/or acceptance
of the works on-maintenance. Alternatively, the applicant may request the Council to carry out
the rectification work at the applicant's cost, such cost being paid by the applicant to the Council
prior to the sealing of the survey plan and/or acceptance of the works 'on maintenance' provided
that in the case of emergency, the Council shall be entitled to rectify such damage at the cost of
the applicant such cost being paid prior to the sealing of the survey plan and/or acceptance of the
work 'on maintenance'.
47. The Contractor shall make all necessary arrangements for supply of water required for
construction works. The use of hydrant standpipes on Council mains will NOT be permitted.
Contractors should contact Council’s Water Section on phone 5449 5254 to obtain an application
form for issue of a key to access Council’s water tanker filling stations. Conditions of access and
location of filling stations are detailed on the application form.
48. All sewerage reticulation mains are to be inspected by closed circuit television (CCTV) prior to
acceptance 'on maintenance'. CCTV inspection will be carried out by Council's CCTV
contractor and arranged by Council following satisfactory completion of construction works.
The developer will be responsible for the full cost of CCTV inspection, including any additional
inspection necessary following defect identification and rectification . This charge is payable
prior to commencement of works and will be determined on the unit rate basis current at the
time of approval.
49. All signage, including that for safety during construction shall be in accordance with the Manual of
Uniform Traffic Control Devices and Main Roads Department Roadworks Signing Guide.
50. As Constructed drawings in both hardcopy and digital format (ADAC) produced in GDA94 Zone
56 coordinate value to the standards and requirements of the Assessment Manager are required
for Council records. Such 'as constructed' drawings will be required prior to works being accepted
"on maintenance", where applicable. Requirements for "as constructed" information are detailed
in the current version of Council's Engineering Design Standards (Water & Sewerage) Manual.
51. Release of plans of survey and/or acceptance of the works on-maintenance will not be
considered until lodgement of satisfactory 'as constructed' records. Please note that bonding of
outstanding works will not be considered by Council.
52. Your company, SCG, as Consulting Engineers for the project, are responsible for arranging all
inspections and ensuring that all relevant details required by Council are supplied. The attached
Water and Sewerage Inspection Report form is to be kept by you and presented to Council's
Inspector at each stage of the development requiring a meeting or inspection. The Inspector will
sign the form at each stage when conditions have been satisfied. The works will be accepted 'on
maintenance' when this form, signed by the Inspector for each stage, is returned with a letter
requesting that it go 'on maintenance'.
53. It is Council policy that a maintenance bond be imposed on construction works during the
maintenance period. The maintenance bond shall be 5% of the agreed value of the development
obligations, or $1,500 whichever is the greater amount. This bond must be lodged by (and shall
only be accepted from) the Developer for the works.
54. Construction work and other associated activities are permitted only during the hours of 7:00am
and 6:00pm Monday to Saturday. No work is permitted on Sundays or public holidays, except
where extended hours are approved by the Assessment Manager or his nominee.
55. Cut-ins to existing live sewer are to be performed by Approved Contractor. Noosa Council Works
Inspector shall be present during any work on live sewer undertaken by contractor. An additional
fee of $160.00 (included below) is required to cover costs associated with these live sewer works.
Fees applicable to the above project are listed below:-
6 of 11
Page 7
-7-
55.1. Plan Examination $ 930.00
55.2. Inspection Fee $ 810.00
55.3. Checking as-constructed data $ 135.00
55.4. CCTV fee $ 130.00
55.5. Live sewer inspection $ 160.00
55.6. BALANCE OWING $ 2165.00 PAID 05/01/08 RN361893
56. Approval of these plans has been taken as a Notice of intention to commence works on the
development.
57. Council will provide all fittings and valves for the cut-in to the existing water supply as well as
labour to perform the cut-in. The Developer shall bear the actual cost of this work, and payment
shall be made before the cut-in is done.
58. All water connection fees are to be paid prior to the pre-start meeting. The water main must be
commissioned prior to installing the water services and water meters. The water service tappings
on the new water main/s within the development must be undertaken by an approved
subcontractor under direct Council supervision. Tappings on water mains not constructed as part
of the development works are to be carried out by Noosa Shire Council at developer’s cost.
59. Council will arrange for Serck Controls Pty Ltd to connect the sewerage pump station to Council’s
SCADA system. This requires Serck Controls Pty Ltd to configure the system to include the
station and set up the Spill Management procedure and provide reports. The cost of these works
(estimate has been included in fees listed in Clause 55 above) is to be met by the developer.
5 REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:
Referral Trigger Referral Status Referral Agency Referral Address
Nil
6 APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table:
Plan / Document No. Rev. Plan / Document Name Date
Council’s Policy on Landscaping Guidelines
PP-HEND OP2 Planting Plan – EDAW I AECOM 03/04/2007
16076-OW2 C Driveway & Drainage – SCG Consulting 08.10.07
Engineers
16076-C1 A Sewer Main Relocation – SCG 19.12.06
Consulting Engineers
16076-OW1 C Operational Works – SCG Consulting 08.10.07
Engineers
WD.201 T1 Basement Floor Plan – Kidd Co Jan ‘07
Designers
7 ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
7 of 11
Page 8
-8-
1. Should any changes or modifications to the approved plans be required as a result of
construction constraints, a Change to an Existing Approval Application under the Integrated
Planning Act must be made. Amended plans clearly indicating the changes must be lodged
with this application along with the appropriate fees.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can
also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or
the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.
8 PROPERTY NOTES
Not applicable
9 PRELIMINARY APPROVAL OVERRIDING SCHEME
Not applicable
10 FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit required Subject of the required Development Permit
Development Permit for Operational Landscaping, Access, Stormwater Disposal,
Works Sediment & Erosion Controls & Excavation of The
Site.
11 SELF ASSESSABLE CODES
The developer must comply with the following codes for self-assessable development related to the
development approved under this Decision Notice:
Not applicable
12 SUBMISSIONS
Not applicable
13 REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not applicable
14 RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.
During the appeal period, you as the applicant may make written representations to Council about
the conditions contained within the development approval. If Council agrees or part agrees with the
representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice”
may be given. Taking this step will defer your appeal period, which will continue after Council makes
its decision. (Refer to sections 3.5.17 and 3.5.18 of the Integrated Planning Act 1997).
8 of 11
Page 9
-9-
15 OTHER DETAILS
Should you wish to obtain more information about Council’s decision electronic copies of Council’s
decision are available on line at www.sunshinecoast.qld.gov.au, or at Council Offices.
Yours faithfully,
Tracy Arthur
SENIOR PLANNING OFFICER
9 of 11
Page 10
- 10 -
Appeal Rights
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION
The following is an extract from the Integrated (6) If an application involves assessment against a
Planning Act (Chapter 4). concurrence agency code, appeal rights for submitters
for the application are not available against the part of
Division 8 - Appeals to court relating to the approval that represents the concurrence agency’s
development applications response for the code.
Appeals by applicants Appeals by advice agency submitters
4.1.27.(1) An applicant for a development application 4.1.29.(1) An advice agency may, within the limits of its
may appeal to the court against any of the following- jurisdiction, appeal to the court about the giving of a
(a) the refusal, or the refusal in part, of a development development approval for a development application if-
application; (a) the development application involves impact
(b) a matter stated in a development approval, including assessment; and
any condition applying to the development, and the (b) the advice agency told the applicant and the
identification of a code under section 3.1.6;1 assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a application as a submission for an appeal.
development permit was applied for; (2) The appeal must be started within 20 business
(d) the length of a currency period; days after the day the decision notice or negotiated
decision notice is given to the advice agency as a
(e) a deemed refusal.
submitter.
(2) An appeal under subsection (1)(a) to (d) must be
Appeals for matters arising after approval given (co-
started within 20 business days (the “applicant’s
respondents)
appeal period”) after the day the decision notice or
negotiated decision notice is given to the applicant. 4.1.30.(1) For a development approval given for a
development application, a person to whom any of the
(3) An appeal under subsection (1)(e) may be
following notices have been given may appeal to the
started at any time after the last day a decision on the
court against the decision in the notice-
matter should have been made.
(a) a notice giving a decision on a request for extension
Appeals by submitters
of the currency period for an approval;
4.1.28.(1) A submitter for a development application
may appeal to the court about- (b) a notice giving a decision on a request to make a
minor change to an approval.
(a) the giving of a development approval, including any
conditions (or lack of conditions) or other provisions (2) The appeal must be started within 20 business
of the approval; or days after the day the notice of the decision is
given to the person.
(b) the length of a currency period for the approval.
(3) Subsection (1)(a) does not apply if the approval
(2) The appeal must be started within 20 business resulted from a development application
days (the “submitters appeal period”) after the day (superseded planning scheme) that was
the decision notice or negotiated decision notice is given assessed as if it were an application under a
to the submitter. superseded planning scheme.
(3) If a person withdraws a submission before the (4) Also, a person who has made a request
application is decided, the person may not appeal the mentioned in subsection (1) may appeal to the
decision. court against a deemed refusal of the request.
(4) If an application involves both impact (5) An appeal under subsection (4) may be started
assessment and code assessment, appeal rights for at any time after the last day the decision on the
submitters are available only for the part of the matter should have been made.
application involving impact assessment.
Division 9 - Appeals to court about other matters
(5) If an application is processed under section
6.1.28(2), appeal rights for submitters for the application Appeals for matters arising after approval given (no
are available only for the aspects of the development co-respondents)
that would have required public notification under the 4.1.31.(1) A person to whom any of the following notices
repealed Act. have been given may appeal to the court against the
decision in the notice-
(a) a notice giving a decision on a request to change or
cancel a condition of a development approval.
1
Section 3.1.6 (Preliminary approval may override local planning
instrument)
10 of 11
Page 11
- 11 -
(b) a notice under section 6.1.442 giving a decision to (d) the length of a period mentioned in section 3.5.21
change or cancel a condition of a development currency period;
approval. (e) a deemed refusal.
(2) The appeal must be started within 20 business (2) An appeal under subsection (1)(a) to (d) must be
days after the day the notice of the decision is started within 20 business days (the “applicant’s
given to the person. appeal period”) after the day the decision notice or
(3) Also, a person who has made a request negotiated decision notice is given to the applicant.
mentioned in subsection (1)(a) may appeal to (3) An appeal under subsection (1)(e) may be
the court against a deemed refusal of the started at any time after the last day a decision on the
request. matter should have been made.
(4) An appeal under subsection (3) may be started The Registrar for the Building and Development
at any time after the last day the decision on the Tribunal may be contacted at the website
matter should have been made. http://www.localgovernment.qld.gov.au/
Appeals against decisions to change approval
conditions under the repealed Act
4.1.33A.(1) A person who is dissatisfied with a decision
made on an application to change the conditions
attached to an approval given under section 2.19(3)or
section 4.4 of the repealed Act may appeal to the court
against-
(a) the decision; or
(b) a deemed refusal of the application.
(2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of
the decision is to be given to the person.
(3) An appeal under subsection (1)(b) may be
started at any time after the last day a decision on the
matter should have been made.
Appeals against local laws
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions applied
under a local law about the use of premises or the
erection of a building or other structure permitted by the
planning scheme may appeal to the court against the
decision or the conditions applied.
(2) The appeal must be started within 20 business
days after the day notice of the decision is given to the
applicant.
For Building Works Only
Rights of appeal conferred by Section 4.2.9 of the
Integrated Planning Act 1997 as follows:
Division 3 – Appeals to tribunals relating to
development applications
Appeals by applicants
4.2.9(1) An applicant for a development application may
appeal to the Building and Development Tribunal
against any of the following-
(a) the refusal, or the refusal in part, of a development
application;
(b) a matter stated in a development approval, including
any condition applying to the development, and the
identification of a code under section 3.1.6;3
(c) the decision to give a preliminary approval when a
development permit was applied for;
2
Section 6.1.44 (Conditions may be changed or cancelled
by assessment manager or concurrence agency in certain
circumstances)
3
Section 3.1.6 (Preliminary approval may override local planning
instrument)
11 of 11
Used in these records