Decision Notice - 010.2006.00001065.001 [As Published] · 142006.1065
-7-
55.1. Plan Examination $ 930.00
55.2. Inspection Fee $ 810.00
55.3. Checking as-constructed data $ 135.00
55.4. CCTV fee $ 130.00
55.5. Live sewer inspection $ 160.00
55.6. BALANCE OWING $ 2165.00 PAID 05/01/08 RN361893
56. Approval of these plans has been taken as a Notice of intention to commence works on the
development.
57. Council will provide all fittings and valves for the cut-in to the existing water supply as well as
labour to perform the cut-in. The Developer shall bear the actual cost of this work, and payment
shall be made before the cut-in is done.
58. All water connection fees are to be paid prior to the pre-start meeting. The water main must be
commissioned prior to installing the water services and water meters. The water service tappings
on the new water main/s within the development must be undertaken by an approved
subcontractor under direct Council supervision. Tappings on water mains not constructed as part
of the development works are to be carried out by Noosa Shire Council at developer’s cost.
59. Council will arrange for Serck Controls Pty Ltd to connect the sewerage pump station to Council’s
SCADA system. This requires Serck Controls Pty Ltd to configure the system to include the
station and set up the Spill Management procedure and provide reports. The cost of these works
(estimate has been included in fees listed in Clause 55 above) is to be met by the developer.
5 REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:
Referral Trigger Referral Status Referral Agency Referral Address
Nil
6 APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table:
Plan / Document No. Rev. Plan / Document Name Date
Council’s Policy on Landscaping Guidelines
PP-HEND OP2 Planting Plan – EDAW I AECOM 03/04/2007
16076-OW2 C Driveway & Drainage – SCG Consulting 08.10.07
Engineers
16076-C1 A Sewer Main Relocation – SCG 19.12.06
Consulting Engineers
16076-OW1 C Operational Works – SCG Consulting 08.10.07
Engineers
WD.201 T1 Basement Floor Plan – Kidd Co Jan ‘07
Designers
7 ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
7 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2006.00001065.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 74 KB (small file)
- File type
No other editions are linked here.