BMD Consulting P/L - Brisbane

BMD Corporate Centre
25 Cambridge Parade

Manly
Brisbane QLD 4179

Ph: 0738937008 Fax: 0738934088
Email: [email protected]

To: PO Rox

TEWANTIN, QLO

Job Description :

WE ARE SENDING YOU THE ATTACHED :

 

 

| Transmittal Advice |

\Q\ Transmittal #: 2
4sGcs Date: 11/12/2007
Job: CB-0849
L25&26 SP151406, L21 RP867627

NOOSAVILLE QLD

& L1 RP133192, Eumond Noosa Rd

METHOD OF DISTRIBUTION:

ss CONSULTING

 

 

 

 

I Shop Drawings - Film TC Electronic T Schedules
[ Reports T Amendments l” Specifications ¥ Drawing
Document Type Drawing No. Description
Drawing CB0849-ESC01A EARTHWORKS MANAGEMENT LAYOUT PLAN __
Drawing | CBQB49-ESCQ2C | SEDIMENT BASIN 1 AND EROSION CONTROL PLAN
Drawing | CB0849-ESC03B | SEDIMENT BASIN 1 PLAN AND DETAIL
Drawing CB0849-ESC04 B SEDIMENT BASIN 2 AND EROSION CONTROL PLAN

 

 

 

 

 

THESE ARE TRANSMITTED as checked below:

For approval rc
T Preliminary r
T Construction r
[For review and comment r
[ Tender ~

Approved as submitted F Resubmit ___ copies for approval

As Constructed F Submit__ copies for distribution
Returned for corrections
Other

Prints returned after loan to us

T Return ___ corrected prints

Remarks: PLEASE FIND ATTACHED 1 x A3

Copy To:

From: David Polden (BMD Consulting P/L - Brisbane)

Signature:

RQ eo ———

If enclosures are not as noted, kindly notify us at once.

Page 1 of 1

 
Full text of the other 5 pages

Page 2

< CONSULTING

Our Ref: CB0849
11 December 2007

The Chief Executive Officer
Noosa Council

P.O. Box 141

TEWANTIN QLD 4565

Attention: Ron Read
Dear Sir,
Re: Operational Works Application
Bunnings Noosaville

184 Eumundi Noosa Road, Noosaville

In response to your request for further information in connection with the above application we enclose
our emended drawings and comment on the items in your fax dated 27/11/2007.

1, We have added the finished surface contours to Drawing No. CB0849-ESCOIC. We
haven't changed the Cardno drawing as we have not designed the bulk earthworks levels.
However the contours to the embankment and Gateway Drive have been clearly marked.

2. The adjoining lot has been added to the catchment to sediment basin No. 2 - refer
drawing CB0849-ESC03B.
3. The quantity of earthworks is shown on Cardno’s drawing. The short fall quantity of

11,000m? approximately will be imported from the Gateway Drive site and will not be
transported over Council’s road network.

4. The site entry and wash down bay is indicated on Drawing No. CB0849-ESCOIC and is
now positioned on the Gateway Drive boundary.

5. Rock checks have been used in lieu of hay bales.

6. The outlet from sediment basin No. 2 has been reoriented such that flow from the outlet
will discharge to the south where it can be directed wholly within the development

boundary towards the existing culverts under Gateway Drive.

We trust this assists your review and we look forward to receipt of your approval in due course.

Yours fgt

  

lle.

David Polden
BMD Consrfting Pty Ltd

BMD Consulting Pty Lid
ABN; 23 O10 743 692

BMD CORPORATE CENTRE

Southern Queensland Gold Coast Northern Australia New South Wales Cairns

25 Cambrlige Pde SO Price $1 Level 1, 57 Mitchell St 3 The Crescent Homebush Bay NSW 2127 Unit 2, 110 Aumutles St

Manly Qid 4179 Nerang Qld 4211 North Ward Qld 4810 PO Box 3541 Rhodes Shopping Centre Cais Qtd 4870

PO Bax 197 Wynnum Qld 4178 PO Box 764 Nerang Old 4211 PO Box 6008 fownsville MC Qld 4810 Rhodes NSW 2138 1: 07 4035 1844 F:07 4035 1566
T: 07 3893 7000 F: 07 3853 4088 1: 07 5596 2400 F: 07 5596 2849 T: 07 4750 7000 F:07 4750 7077 ¥: 02 9475 6900 F: 02 9475 6999 €: [email protected],com.au

E: [email protected] €: [email protected] €: [email protected] E: [email protected]

weew.bind.com.au

    

Page 3

 

 

 

Fay kane (\Gecunentn and Soto Hing te Desktop

 

REFER DWG (B0849-C03

eee

 

 

 

i
2
2

2 30

LOT 26
SP151406

 

“a

 

 

LEGEND
Sm

 

PROPOSED EARTHWORKS
CONTOURS
(0.2m INTERVALS]

PROPOSED SEO
BASIN CONTOURS
(0 2m INTERVALS)

 

mem SFemmmem <SFammm SILT FENCE

WITH SAFETY MESH

on ROCK EROSION PROTECTION

CONSTRUCTION EXtTZENTRY

TRAFFIC CLEANING FACILITY

 

 

 

co co fm CATCH DRA’

HAY BALE FILTER

 

2
a
tm

FILL

CUT

 

 

 

 

 

NOTE:-

LOCATION & LEVELS OF ALL EXISTING SERVICES
TO BE CONFIRMED ON SITE BY CONTRACTOR
PRIOR TO THE COMMENCEMENT OF CONSTRUCTION.
{T 1S THE CONTRACTOR'S RESPONSIBILITY TO
PERFORM A OtAL BEFORE YOU DIG SEARCH PRIOR
TO COMMENCEMENT OF WORKS

 

 

 

 

 

 

NOTE: -
FOR DETAILS OF EXISTING GROUND CONDITIONS
REFER TO.

AL REPORT PREPAREO BY COFFEY
GEOSCIENCES No. B17974/01-8 DATED
98.07.2006

@) REPORT PREPARED BY DOUGLAS
PARTNERS No. 339B4 DATED 16 08 2006

2) FOR DETAILS OF METHODOLOGY FOR
PROPOSED IN SITU GROUND IMPROVEMENT OF
THE UNCONSOLIGATEO FILL ON THE SITE, REFER
TO REPORT BY LANOPAC TECHNOLOGIES No
P74B-O1."A) OATEO AUGUST 2007.

 

 

 

 

2 STRAND POST & WIRE FENCE

TEMPORARY SEOIMENT BASIN

 

 

 

 

 

eee ETL

 

 

 

 

 

.94tstT 130 AM

 

 

 

 

 

 

 

 

 

 

 

 

SCALE 1:500 {Al}
ci Ei Desk C.PAUNESCU Ghent
BMD Stina Enaaer | onmn [connec BUNNINGS GROUP LIMITED
& Project Managers %,. Checked P-MALONEY | Project
SS. nen a9 0 143 wad reas BUNNINGS WAREHOUSE NOOSAVILLE
CON ULTING areroved By] MALONEY rae NOT FOR CONSTRUCTION
‘NOQSA COUNCEL FORMA TION AEQUEST TwH | oF | nae ee ee mmunsemems Head Offwe - Brahane NPER No. | 191572 EARTHWORKS MANAGEMENT ‘Drawing No. Rev
‘Amodinacts ay | aees | Dae | Wo. ‘Amendments by tench bay nsw Tn) Fe RP Po (OTE MAD as ottice [22 09.10.07 LAYOUT PLAN
THES ORAWING CANNOT BE COPIED OR REPRIKKICED DV ANY FORM OA USED FOR ANY OTHER PURPOSE OTHER THAN THAT ORKANALLY INTEMOED WITHOUT THE WRITTEN PERO@SSION OF GHD CONSIA TING PTY LO. EE Ree TS sel, Cae Meee Ma am oT uTS9 5555. Ph [oT) (03S He] Datars AWD. CBOB49 ESCO1) A

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

z

Page 4

 

 

Ee nama C\Docenante and Seitiogs in byte Derk ag OUNCES WEST

 
    

REFER DW

  

WB0829-C03_ ———
ee
—p To —_——

 

 

LOT 26
SP151406

   

 

 

EARTHWORKS QUANTITIES

CUT - 16,762m

 

FILL - 25,861m

 

(MPORTEO FILL OF 11,119m (CUT
VOLUME] WILL BE OBTAINED FROM
GATEWAY RISE SITE

—s Sh Sf

 

 

 

 

                   

 

   

   
  

SEDIMENT BASIN 1

 

 

 

 

NOTE:-

1) FOR DETAILS OF EXISTING GROUND CONDITIONS

+ oo
LJ
REFER TO.
A) REPORT PREPARED BY COFFEY

GEOSCIENCES No. 817974/01-B DATED
06.07.2004
B) REPORT PREPARED BY DOUGLAS

PARTNERS No. 33984 DATED 16.08.2006
2) FOR DETAILS OF METHODOLOGY FOR
PROPOSED IN SITU GROUND IMPROVEMENT OF
THE UNCONSOLIDATED FILL ON THE SITE, REFER
TO REPORT BY LANOPAC TECHNOLOGIES No
P718-01.UA} DATED AUGUST 2007

 

 

to (co

 

 

 

 

S823

   

 

 

    
   

   

  

"

    

 

3 STRAND POST AND WIRE
FENCE WITH SAFETY MESH

   

TOTAL CATCHMENT (AJ © 2 76ha.
ASSUME > 33% OF SOW ¢ 002@
tw 2 OS

SETTLING VOLUME (Vs) + 100 & kaa Cv x A
vr SIT a 05 x 276
© 73a!

SETTLING DEPTH = 1.0m

GASIN DIMENSIONS AT @ASE 112 RATION

Ar Me!

wo 908

L + om

De 10m

      

     

ROCK CHECK OAMS TO BE SPACED
NO MORE THAN SOm APART

1k

Vs © 722m!

STORAGE VOLUME © 0.5 x Vs
= lbte

DEPTH © OSm

SPULWAY AREA
2 10%
150mm
oom
h mnutes
60ma/h
0.77
Crtxa
905 L/see

 

are

 

 

 

         

 

 
  

   

WEIR FORMULA: @ © 08 e146 x LN

            

= 1328 UK

= 0965 701.920
bite

0.166)

  

   

CONVEYANCE
CATCHMENT AREA

  

(0 —— (0 —— (0 tm 7

WEIR FLOW DEPTH © 333e0

 

 

                       

 

 

PROPOSED EARTHWORKS
CONTOURS
(0 2m INTERVALS)

PROPOSED SED
BASIN CONTOURS
{0.2m INTERVALS}

SILT FENCE

32 STRAND POST & WIRE FENCE
WITH SAFETY MESH

ROCK EROSION PROTECTION

CONSTRUCTION EXIT/ENTRY

TRAFFIC CLEANING FACILITY

CATCH DRAIN

ROCK CHECK DAMS

TEMPORARY SEDIMENT BASIN

 

 

NOTE:

 

 

 

LOCATION & LEVELS OF ALL EXISTING SERVICES
TO BE CONFIRMED ON SITE BY CONTRACTOR
PRIOR TO THE COMMENCEMENT OF CONSTRUCTION
IT I$ THE CONTRACTOR'S RESPONSIBILITY TO
PERFORM A OAL BEFORE YOU O16 SEARCH PRIOR
TO COMMENCEMENT OF WORKS

 

 

 

 

 

2.

 

COMPACTION.

 

SEDIMENTATION NOTES

 

BEING LOWEREO

WILL ADVISE ON TREATMENT.

FABRIC

CONSTRUCTION PHASE SEQUENCE

ew —_—e—Eeorr EOS

1. CONSTRUCT SEDIMENT BASIN, SEQIMENT FENCES AND DIVERSION BUNDS.

COMMENCE CLEARING AND CONSTRUCT CATCH DRAINS.
3. COMMENCE FILLING AND EARTHWORKS INCLUDING COMPACTION.
&. CONSTRUCTION OF STORMWATER LINES AND GULLIES INCLUDING BACKFILLING AND

S TURF STRIPS 900mm WIDE SHALL BE LAID TO BASE OF ALL DOWNSTREAM
EARTHWORKS BATTERS - ANO THE REMAINDER OF THE BATTERS SHALL BE TOPSOILED
AND GRASS SEEDED IMMEDIATELY UPON COMPLETION OF EARTHWORKS, ANO AT THE

Zoe SATISFACTION OF SUPERINTENDENT. EIGHTY PERCENT {80%} GRASS COVERAGE SHOULD

BE ACHIEVED PRIOR TO REMOVAL. SEDIMENT FENCES TO BE REMOVED AFTER
CONSTRUCTION OF ROADS

1. ALL SEDIMENT CONTROL DEVICES (SILT FENCES, SPILLWAYS, ROCK CHECK DAMS) TO BE
CHECKED AFTER ALL MAJOR RAINFALL EVENTS AND RECTIFIED AS NECESSARY

2. F SEDIMENT WATER IS SHOWN TO HAVE SUSPENDED SOLIDS > SOmg/Lt. THEN THE USE OF
A FLOCCULANT IS TO BE APPLIED AS DIRECTEO BY SUPERINTENDENT PRIOR TO THE BASIN

THE BASIN IS TO BE ORAINED BY OPENING THE VALVE OR UNPLUGGING THE END OF THE

OUTLET PIPE. ONCE DRAINED THE OUTLET PIPE WILL BE PLUGGED AGAIN,

THE FIELO TEST tS :- FILL A CLEAR 6Smm SOFT DRINK BOTTLE WITH BASIN WATER
IF YOU CAN NOT SEE CLEARLY THROUGH THE SAMPLE, THEN A
FLOCCULANT NEEDS TO BE APPLIED.

THE PH OF THE WATER MUST BE IN THE RANGE 65 to 8.5 PRIOR TO DISCHARGE.

RESULTS ARE OUTSIDE THESE LIMITS THE SUPERINTENDENT IS TO BE NOTIFIED ANO HE

3. OUTLET BAFFLE - POSTS 100mm - AT tm CRS SET 800mm DEEP WITH SEDIMENT FENCE

(F THE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4. INLET BAFFLE - POSTS 100mm - AT tm CRS SET 600mm OEEP WITH SEDIMENT FENCE FABRIC
WITH SOmm HOLES CUT AT 300mm CRS
5. SEDIMENT BASINS TO BE INSPECTED AT LEAST ONCE EVERY WEEK AND DE-SILTED AFTER
EACH MAJOR STORM EVENT OR AS DIRECTED BY SUPERINTENDENT.
— 6. THE FINAL LOCATION OF SILTATION AND EROSION CONTROL DEVICES HAY BE ADJUSTED AS
Fy NECESSARY ON SITE BY THE SUPERINTENDENT
E SCALE 1.500 (At)
: ‘Design C.PAUNESCU Chent
: a Strata! Enanoers (@G | [ome [cranes BUNNINGS GROUP LIMITED
=] _© | moose Counce TOM REQUEST tw | op [uve & Project Managers *,) Checked P.MALONEY | Project
BLS | ceorecreacat Corments 40060 on] en (SS sana go rea can obs Ogi BUNNINGS WAREHOUSE NOOSAVILLE
ite tetioeret = [me CONSULTING Aewrves On| CAE Pe HOT FOR CONSTRUCTION
7 1 wt
o | es Srey tae Head Offge - Brinbane NPER No | 191572 SEDIMENT BASIN 1 AND Drawing No. Rev
a ‘Amendinents By | Appt Ho. Amendenects By | Ape | Date | car fam aensees Pr (07) 3893 151 Date 09.40.07 N _
3 THES DRAWING CANNOT BE COPED OR REPROOUCED ON ANY FORM OR USED FOR ANY OTHER PURPOSE OTHER THAN THAT ORIGNALLY INTENDED WITHOUT THE WRITTEN PERM®SSION OF BHD CONSULTING PTY LTD. Sentgiehonty im Soe ea manana, ters ned Datum AKO. EROSION CONTROL PLAN CB0B49 ESC02| C

 

Page 5

 

 

    

1000ma SETTLING ZONE
500mm STORAGE ZONE

ox, water, tines. ..1

30g tg to

RL

 

  

950

 

ERFORATED RISER. TO:
ii ER SEEPAGE

  

 

PT | EASTING MORTHNG

1 | svanests | -coovz27

2 | caunoos | -cooensss

3 | certwen | -co097 963

«| sennzws | -cowsess

SPILLWAY WITH ROCK PROTECTION 5 | corescis | core ros

tm WiDE GEOFABRIC UNDER ALL ROCK 6 | soz | -sooesere
TOP OF BANK 7 | soneses7a | -co072234

RLW7S

     

          

 

SEDIMENT CONTROL BASIN
EMBANKMENT FILL NOTES

1 FILL AREA TO BE STIRPPED OF TOPSOIL AND SURFACE
APPROVED BY GEOTECHNINCAL ENGINEER PRIOR TO THE
COMMENCEMENT OF FILLING.

2 EMBANKMENT FILL MATERIAL SHALL BE FREE OF ORGANIC
MATTER, OVERSIZED INCLUSIONS AND ANY DELTERIOUS
MATERIAL SUCH AS TIMBER, STEEL, PLASTIC OR SOIL OF
EXCESSIVELY HIGH MOISTURE CONTENT THE MAXIMUM
PARTICLE SIZE SHALL NOT EXCEED 150mm FILL TO BE PLACED
IN LAYERS OF 200mm

3 THE FILL SHALL BE PLACED AND COMPACTED AT OR ABOVE
OPTIMUM MOISTURE CONTENT TO THE FOLLOWING REQUIRMENTS
-MIN DENSITY RATIO 96 % SMDD

-MAX DENSITY RATIO 103% SHDD

=VARIATION OF THE FILL MOISTURE CONTENT 0-2% OF
STANDARD OPTIMUK

& THE STRIPPEQ AREA IS TO BE APPROPRIATELY BENCHED
TO FACILITATE NEAR HORIZONTAL FILL PLACEMENT

 

 

 

 

 

 

 

COMPACTED EARTHWORKS
BUND (TYP)

  

VALVE END OF PIPE

TO BE OPENED ONLY AFTER BASIN
TESTING TO BE CLOSED AFTER BASIN
DRAINED (TYP)

RAIN AS DIRECTED
ay Sbebaatencen

ALL FLOW FROM
SEDIMENT BASINS TO BE
ORECTED TO CULVERT

UNDER GATEWAY DRIVE,

—

\

APPROX LOCATION OF —4
EXISTING CULVERT. \J

  
 
 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MATCH INTO
WW 3 BATTER

\

MATCH INTE
1) BAT

SEDIMENT BASIN
DISCHARGE L

CATION

IN

%o.

PROPOSEO

 

|

 

 

REFER OWG (B0849-C03

 

s0m

 

 

SSEDIMENT BASIN=2,2

 

 

 

 

 

 

          

 

 
 

RELIEF DISCHARGE
THROUGH 150 STEEL
PIPE. REFER TO

OeTAK

     
      

 

 

 

>

 

 

 

   

 

 

 

 

 

 

 

 

SEOIMENT BASIN
RL 9S

  
  

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

     

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

WEIGHTED BASE
mayo
CUT-OFF TRENCH 600am MIN DEPTH JUMPED ROCK )-0 6m DIAL
ACKFILLED WITH IMPERMEA|
Ea mene. Pe
T
NTS.
‘200mm THICK MASS CONCRETE
/. fe» 2SHPo
a: < < . ad Ps
4
a Z ae
« é a a 4a
GRATED MESH TOP «
TO PREVENT LITTER TO oe
x QUTLET NEEDLE PUNCHED o| ff
gy ~ GEOFABRIC 2
re RLISD_ pppoe fe + :
3 150@ STEEL PIPE RISER
‘ TO TOP OF SEDIMENT 4
z STORAGE 20NE 1, 7
2 4a
3 SEDIMENT e
zi STORAGE [see STEEL PIPE
q ZONE ~ -< £ <
q a aan -
: 2 ot : 750
q : got I Qo
i \ 150@ STEEL PIPE NOTE: CONCRETE SURFACE TO BE FINISHED AS SMOOTH
5 MASS cone BASE L ‘AS POSSIBLE ON ALL FACES ~
i CUT-OFF WALL DETAIL
z DETAIL SCALE 120
0 $s » 5 20 ia
cysts
E ‘ SCALE £250 (At)
5
3] Desigt C.PAUKESCU Céent
. BMD Stactine rowers (Gy) | Or | ePAnESE BUNNINGS GROUP LIMITED
. & Project Managers *, 0 S| Checked PMALONEY | Project
=| 6 _[ moosa COUNCL MFORMATION REGUEST Tw | oO | nua _ aS Aen 22 0m a3 m2 mm — BUNNINGS WAREHOUSE NOOSAVILLE
Fs om ew | iz wor CONSULTING Approved By.| PMALONEY Fo=> NOT FOR CONSTRUCTION
3] ps _| essuco For Comment o en | os.007 ‘ 391572 IMENT BASIN 1
3 : Srey suns Head Office - Brisbane PER Ho. SED Drawing No. Rev
al Sowstner o | woe | ose [1 Aneotec Be [we | ee mn Ee Tome mage PLAN AND DETAIL CB0849-£5003] B
i THIS DRAWING CANNOT BE COPIED OR REPRODUCED IN ANY FORM OR USED FOR ANY OTHER PURPOSE OTHER THAN THAT ORIGINALLY INTENDED WITHOUT THE WRITTEN PERMISSION OF BHD CONSULTING PTY LTO Dames iene rat ue ARDS.

 

Page 6

 

 

Fig Mame C\Omumenty and Settingy in hygasCarhtop\ OBNCUEECD. 91 ESE

LOT 26
SP151406

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

a

REFER DWG (B0849-C01

 

SEDIMENT BASIN 2 {TYPE ‘C' ORY

 

CATCHMENT AREA = = 0.75ha

po-a

SETTLING AREA A = 3400 x Q = 460m’

SETTLING DEPTH = 0.6m

BASIN DIMENSIONS AT SURFACE (1:2 RATIO)
A = L80m

Wo 16.0m

30.0m

0.6m

 

L

D

SETTLING ZONE

D = 0.6m

Vs = 256m?

STORAGE VOLUME = 1.0 x Vs
= 256m?

DEPTH = 0.58m

—_ eee ood

 

 

 

 

9 5 * nu R om

ee

ore

SCALE 1:400 (All

 

   

SECURE GEOTEXTILE TO GABIONS
WITH 20MM TO 30MM AGGREGATE
OR OTHER MEANS

SEDIMENT STORAGE ZONE

SEDIMENT SETTLING ZONE

SETTLING ZONE

   

CENTRE SPILLWAY

OUTLET
PROTECTION

PLAN VIEW

GABION EMBANKMENT

NEEDLE-PUNCHED GEOFTEXTILE

CREST OF SPILLWAY
500MM
oo

NEEDLE-PUNCHED GEOTEXTILE

 

 

\ 600MAy

 

 

 

 

 

550

 

 

SPILLWAY SECTION

SOOMM MIN, —

DOWNSTREAM ELEVATION

NOTES.

REMOVE ALL VEGETATION AND TOPSOIL FROM UNDER THE DAM WALL AND FROM WITHIN. THE STORAGE
AREA

EXCAVATE TO 300MM DEPTH FOR DAM BASE AND FORM A LEVEL BASE FOR THE GABIONS

LINE THE EXCAVATION WITH A NEEDLE PUNCHED GEOTEXTILE ALLOWING SUFFICIENT GEOTEXTILE TO
LINE FROM THE TOE OF THE DAM, UNDER THE WALL, OVER THE UPSTREAM GABIONS ANO SPILLWAY TO
SOOMM BELOW THE SPILLWAY EXIT ON THE DOWNSTREAM FACE

WALL PROFILE ANO OUTLET PROTECTION SHALL BE MADE UP OF GABION UNITS FILLED WITH GRADED
ROCK AS SPECIFIED ON SWMP

CONSTRUCT A SPILLWAY SOOMM BELOW THE CREST OF THE DAM AND FOR THE WIOTH SPECIFIED ON
THE SWMP

LAP THE GEOQTEXTILE OVER THE UPSTREAM FACE AND THROUGH THE SPILLWAY AND FIX IN PLACE
WITH THE TOP ROW OF GABIONS

COVER THE UPSTREAM FACE AND GEOTEXTILE WITH 20MM TO 30MM GRAVEL

PLACE A “FULL OF SEDIMENT” MARKER TO SHOW WHEN LESS THAN DESIGN CAPACITY OCCURS AND
SEDIMENT REMOVAL IS REQUIRED

REPLACE UPSTREAM GEOTEXTILE LAYER EACH TIME SEDIMENT IS REMOVED

 

Laer Tere

 

 

 

 

 

 

 

 

 

 

 

 

 

6 | NOOSA COUNCIL INFORMATION REQUEST tw [ of | ner
A | tSSUED FoR APPROVAL on Pa | 2.10.07
No Amendments ay | Appd | Dato | No. Amondments By

 

 

 

 

Plat Date 11-00-02 4-17 P84

THIS DRAWING CANNOT Gf COPIED OR REPROQUCED IN ANY FORM OF USEO FOR ANY OTHER PURPOSE OTHER THAN THAT ORKINALLY MTENDED WITHOUT THE WRITTEN PERMISSION OF BMD CONSULTING PTY LTD.

Sygeey Bites

1 The Crescent
Nemeth Gay, WW TET
PO ow 350% hadnt

 

Chit Engineer
Structural at
& Project Managers %, Misc

TonsuttING

Shapging Centre, MS 2007 wwe

C.PAUNESCU Client

C.PAUNESCU

P_MALONEY | Project
Tito

 

  

BUNNINGS GROUP LIMITED
BUNNINGS WAREHOUSE NOOSAVILLE

 

 

ABM 23 Ow 143 407

 

 

 

 

    

 

   

 

 

PaALONEY NOT FOR CONSTRUCTION
seenun war SEDIMENT BASIN 2 AND Drawing No. Rev
a — EROSION CONTROL PLAN CB0849 £5604 B

 

 

 

 

 

 

 

 

 

Used in these records

About this file

File size
638 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2125 - Response to Info Request [As Published].pdf · 638 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.