07/2125 - Response to Info Request [As Published] · 142007.2125
BMD Consulting P/L - Brisbane BMD Corporate Centre 25 Cambridge Parade Manly Brisbane QLD 4179 Ph: 0738937008 Fax: 0738934088 Email: [email protected] To: PO Rox TEWANTIN, QLO Job Description : WE ARE SENDING YOU THE ATTACHED : | Transmittal Advice | \Q\ Transmittal #: 2 4sGcs Date: 11/12/2007 Job: CB-0849 L25&26 SP151406, L21 RP867627 NOOSAVILLE QLD & L1 RP133192, Eumond Noosa Rd METHOD OF DISTRIBUTION: ss CONSULTING I Shop Drawings - Film TC Electronic T Schedules [ Reports T Amendments l” Specifications ¥ Drawing Document Type Drawing No. Description Drawing CB0849-ESC01A EARTHWORKS MANAGEMENT LAYOUT PLAN __ Drawing | CBQB49-ESCQ2C | SEDIMENT BASIN 1 AND EROSION CONTROL PLAN Drawing | CB0849-ESC03B | SEDIMENT BASIN 1 PLAN AND DETAIL Drawing CB0849-ESC04 B SEDIMENT BASIN 2 AND EROSION CONTROL PLAN THESE ARE TRANSMITTED as checked below: For approval rc T Preliminary r T Construction r [For review and comment r [ Tender ~ Approved as submitted F Resubmit ___ copies for approval As Constructed F Submit__ copies for distribution Returned for corrections Other Prints returned after loan to us T Return ___ corrected prints Remarks: PLEASE FIND ATTACHED 1 x A3 Copy To: From: David Polden (BMD Consulting P/L - Brisbane) Signature: RQ eo ——— If enclosures are not as noted, kindly notify us at once. Page 1 of 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 5 pages
Page 2
< CONSULTING
Our Ref: CB0849
11 December 2007
The Chief Executive Officer
Noosa Council
P.O. Box 141
TEWANTIN QLD 4565
Attention: Ron Read
Dear Sir,
Re: Operational Works Application
Bunnings Noosaville
184 Eumundi Noosa Road, Noosaville
In response to your request for further information in connection with the above application we enclose
our emended drawings and comment on the items in your fax dated 27/11/2007.
1, We have added the finished surface contours to Drawing No. CB0849-ESCOIC. We
haven't changed the Cardno drawing as we have not designed the bulk earthworks levels.
However the contours to the embankment and Gateway Drive have been clearly marked.
2. The adjoining lot has been added to the catchment to sediment basin No. 2 - refer
drawing CB0849-ESC03B.
3. The quantity of earthworks is shown on Cardno’s drawing. The short fall quantity of
11,000m? approximately will be imported from the Gateway Drive site and will not be
transported over Council’s road network.
4. The site entry and wash down bay is indicated on Drawing No. CB0849-ESCOIC and is
now positioned on the Gateway Drive boundary.
5. Rock checks have been used in lieu of hay bales.
6. The outlet from sediment basin No. 2 has been reoriented such that flow from the outlet
will discharge to the south where it can be directed wholly within the development
boundary towards the existing culverts under Gateway Drive.
We trust this assists your review and we look forward to receipt of your approval in due course.
Yours fgt
lle.
David Polden
BMD Consrfting Pty Ltd
BMD Consulting Pty Lid
ABN; 23 O10 743 692
BMD CORPORATE CENTRE
Southern Queensland Gold Coast Northern Australia New South Wales Cairns
25 Cambrlige Pde SO Price $1 Level 1, 57 Mitchell St 3 The Crescent Homebush Bay NSW 2127 Unit 2, 110 Aumutles St
Manly Qid 4179 Nerang Qld 4211 North Ward Qld 4810 PO Box 3541 Rhodes Shopping Centre Cais Qtd 4870
PO Bax 197 Wynnum Qld 4178 PO Box 764 Nerang Old 4211 PO Box 6008 fownsville MC Qld 4810 Rhodes NSW 2138 1: 07 4035 1844 F:07 4035 1566
T: 07 3893 7000 F: 07 3853 4088 1: 07 5596 2400 F: 07 5596 2849 T: 07 4750 7000 F:07 4750 7077 ¥: 02 9475 6900 F: 02 9475 6999 €: [email protected],com.au
E: [email protected] €: [email protected] €: [email protected] E: [email protected]
weew.bind.com.au
Page 3
Fay kane (\Gecunentn and Soto Hing te Desktop
REFER DWG (B0849-C03
eee
i
2
2
2 30
LOT 26
SP151406
“a
LEGEND
Sm
PROPOSED EARTHWORKS
CONTOURS
(0.2m INTERVALS]
PROPOSED SEO
BASIN CONTOURS
(0 2m INTERVALS)
mem SFemmmem <SFammm SILT FENCE
WITH SAFETY MESH
on ROCK EROSION PROTECTION
CONSTRUCTION EXtTZENTRY
TRAFFIC CLEANING FACILITY
co co fm CATCH DRA’
HAY BALE FILTER
2
a
tm
FILL
CUT
NOTE:-
LOCATION & LEVELS OF ALL EXISTING SERVICES
TO BE CONFIRMED ON SITE BY CONTRACTOR
PRIOR TO THE COMMENCEMENT OF CONSTRUCTION.
{T 1S THE CONTRACTOR'S RESPONSIBILITY TO
PERFORM A OtAL BEFORE YOU DIG SEARCH PRIOR
TO COMMENCEMENT OF WORKS
NOTE: -
FOR DETAILS OF EXISTING GROUND CONDITIONS
REFER TO.
AL REPORT PREPAREO BY COFFEY
GEOSCIENCES No. B17974/01-8 DATED
98.07.2006
@) REPORT PREPARED BY DOUGLAS
PARTNERS No. 339B4 DATED 16 08 2006
2) FOR DETAILS OF METHODOLOGY FOR
PROPOSED IN SITU GROUND IMPROVEMENT OF
THE UNCONSOLIGATEO FILL ON THE SITE, REFER
TO REPORT BY LANOPAC TECHNOLOGIES No
P74B-O1."A) OATEO AUGUST 2007.
2 STRAND POST & WIRE FENCE
TEMPORARY SEOIMENT BASIN
eee ETL
.94tstT 130 AM
SCALE 1:500 {Al}
ci Ei Desk C.PAUNESCU Ghent
BMD Stina Enaaer | onmn [connec BUNNINGS GROUP LIMITED
& Project Managers %,. Checked P-MALONEY | Project
SS. nen a9 0 143 wad reas BUNNINGS WAREHOUSE NOOSAVILLE
CON ULTING areroved By] MALONEY rae NOT FOR CONSTRUCTION
‘NOQSA COUNCEL FORMA TION AEQUEST TwH | oF | nae ee ee mmunsemems Head Offwe - Brahane NPER No. | 191572 EARTHWORKS MANAGEMENT ‘Drawing No. Rev
‘Amodinacts ay | aees | Dae | Wo. ‘Amendments by tench bay nsw Tn) Fe RP Po (OTE MAD as ottice [22 09.10.07 LAYOUT PLAN
THES ORAWING CANNOT BE COPIED OR REPRIKKICED DV ANY FORM OA USED FOR ANY OTHER PURPOSE OTHER THAN THAT ORKANALLY INTEMOED WITHOUT THE WRITTEN PERO@SSION OF GHD CONSIA TING PTY LO. EE Ree TS sel, Cae Meee Ma am oT uTS9 5555. Ph [oT) (03S He] Datars AWD. CBOB49 ESCO1) A
z
Page 4
Ee nama C\Docenante and Seitiogs in byte Derk ag OUNCES WEST
REFER DW
WB0829-C03_ ———
ee
—p To —_——
LOT 26
SP151406
EARTHWORKS QUANTITIES
CUT - 16,762m
FILL - 25,861m
(MPORTEO FILL OF 11,119m (CUT
VOLUME] WILL BE OBTAINED FROM
GATEWAY RISE SITE
—s Sh Sf
SEDIMENT BASIN 1
NOTE:-
1) FOR DETAILS OF EXISTING GROUND CONDITIONS
+ oo
LJ
REFER TO.
A) REPORT PREPARED BY COFFEY
GEOSCIENCES No. 817974/01-B DATED
06.07.2004
B) REPORT PREPARED BY DOUGLAS
PARTNERS No. 33984 DATED 16.08.2006
2) FOR DETAILS OF METHODOLOGY FOR
PROPOSED IN SITU GROUND IMPROVEMENT OF
THE UNCONSOLIDATED FILL ON THE SITE, REFER
TO REPORT BY LANOPAC TECHNOLOGIES No
P718-01.UA} DATED AUGUST 2007
to (co
S823
"
3 STRAND POST AND WIRE
FENCE WITH SAFETY MESH
TOTAL CATCHMENT (AJ © 2 76ha.
ASSUME > 33% OF SOW ¢ 002@
tw 2 OS
SETTLING VOLUME (Vs) + 100 & kaa Cv x A
vr SIT a 05 x 276
© 73a!
SETTLING DEPTH = 1.0m
GASIN DIMENSIONS AT @ASE 112 RATION
Ar Me!
wo 908
L + om
De 10m
ROCK CHECK OAMS TO BE SPACED
NO MORE THAN SOm APART
1k
Vs © 722m!
STORAGE VOLUME © 0.5 x Vs
= lbte
DEPTH © OSm
SPULWAY AREA
2 10%
150mm
oom
h mnutes
60ma/h
0.77
Crtxa
905 L/see
are
WEIR FORMULA: @ © 08 e146 x LN
= 1328 UK
= 0965 701.920
bite
0.166)
CONVEYANCE
CATCHMENT AREA
(0 —— (0 —— (0 tm 7
WEIR FLOW DEPTH © 333e0
PROPOSED EARTHWORKS
CONTOURS
(0 2m INTERVALS)
PROPOSED SED
BASIN CONTOURS
{0.2m INTERVALS}
SILT FENCE
32 STRAND POST & WIRE FENCE
WITH SAFETY MESH
ROCK EROSION PROTECTION
CONSTRUCTION EXIT/ENTRY
TRAFFIC CLEANING FACILITY
CATCH DRAIN
ROCK CHECK DAMS
TEMPORARY SEDIMENT BASIN
NOTE:
LOCATION & LEVELS OF ALL EXISTING SERVICES
TO BE CONFIRMED ON SITE BY CONTRACTOR
PRIOR TO THE COMMENCEMENT OF CONSTRUCTION
IT I$ THE CONTRACTOR'S RESPONSIBILITY TO
PERFORM A OAL BEFORE YOU O16 SEARCH PRIOR
TO COMMENCEMENT OF WORKS
2.
COMPACTION.
SEDIMENTATION NOTES
BEING LOWEREO
WILL ADVISE ON TREATMENT.
FABRIC
CONSTRUCTION PHASE SEQUENCE
ew —_—e—Eeorr EOS
1. CONSTRUCT SEDIMENT BASIN, SEQIMENT FENCES AND DIVERSION BUNDS.
COMMENCE CLEARING AND CONSTRUCT CATCH DRAINS.
3. COMMENCE FILLING AND EARTHWORKS INCLUDING COMPACTION.
&. CONSTRUCTION OF STORMWATER LINES AND GULLIES INCLUDING BACKFILLING AND
S TURF STRIPS 900mm WIDE SHALL BE LAID TO BASE OF ALL DOWNSTREAM
EARTHWORKS BATTERS - ANO THE REMAINDER OF THE BATTERS SHALL BE TOPSOILED
AND GRASS SEEDED IMMEDIATELY UPON COMPLETION OF EARTHWORKS, ANO AT THE
Zoe SATISFACTION OF SUPERINTENDENT. EIGHTY PERCENT {80%} GRASS COVERAGE SHOULD
BE ACHIEVED PRIOR TO REMOVAL. SEDIMENT FENCES TO BE REMOVED AFTER
CONSTRUCTION OF ROADS
1. ALL SEDIMENT CONTROL DEVICES (SILT FENCES, SPILLWAYS, ROCK CHECK DAMS) TO BE
CHECKED AFTER ALL MAJOR RAINFALL EVENTS AND RECTIFIED AS NECESSARY
2. F SEDIMENT WATER IS SHOWN TO HAVE SUSPENDED SOLIDS > SOmg/Lt. THEN THE USE OF
A FLOCCULANT IS TO BE APPLIED AS DIRECTEO BY SUPERINTENDENT PRIOR TO THE BASIN
THE BASIN IS TO BE ORAINED BY OPENING THE VALVE OR UNPLUGGING THE END OF THE
OUTLET PIPE. ONCE DRAINED THE OUTLET PIPE WILL BE PLUGGED AGAIN,
THE FIELO TEST tS :- FILL A CLEAR 6Smm SOFT DRINK BOTTLE WITH BASIN WATER
IF YOU CAN NOT SEE CLEARLY THROUGH THE SAMPLE, THEN A
FLOCCULANT NEEDS TO BE APPLIED.
THE PH OF THE WATER MUST BE IN THE RANGE 65 to 8.5 PRIOR TO DISCHARGE.
RESULTS ARE OUTSIDE THESE LIMITS THE SUPERINTENDENT IS TO BE NOTIFIED ANO HE
3. OUTLET BAFFLE - POSTS 100mm - AT tm CRS SET 800mm DEEP WITH SEDIMENT FENCE
(F THE
4. INLET BAFFLE - POSTS 100mm - AT tm CRS SET 600mm OEEP WITH SEDIMENT FENCE FABRIC
WITH SOmm HOLES CUT AT 300mm CRS
5. SEDIMENT BASINS TO BE INSPECTED AT LEAST ONCE EVERY WEEK AND DE-SILTED AFTER
EACH MAJOR STORM EVENT OR AS DIRECTED BY SUPERINTENDENT.
— 6. THE FINAL LOCATION OF SILTATION AND EROSION CONTROL DEVICES HAY BE ADJUSTED AS
Fy NECESSARY ON SITE BY THE SUPERINTENDENT
E SCALE 1.500 (At)
: ‘Design C.PAUNESCU Chent
: a Strata! Enanoers (@G | [ome [cranes BUNNINGS GROUP LIMITED
=] _© | moose Counce TOM REQUEST tw | op [uve & Project Managers *,) Checked P.MALONEY | Project
BLS | ceorecreacat Corments 40060 on] en (SS sana go rea can obs Ogi BUNNINGS WAREHOUSE NOOSAVILLE
ite tetioeret = [me CONSULTING Aewrves On| CAE Pe HOT FOR CONSTRUCTION
7 1 wt
o | es Srey tae Head Offge - Brinbane NPER No | 191572 SEDIMENT BASIN 1 AND Drawing No. Rev
a ‘Amendinents By | Appt Ho. Amendenects By | Ape | Date | car fam aensees Pr (07) 3893 151 Date 09.40.07 N _
3 THES DRAWING CANNOT BE COPED OR REPROOUCED ON ANY FORM OR USED FOR ANY OTHER PURPOSE OTHER THAN THAT ORIGNALLY INTENDED WITHOUT THE WRITTEN PERM®SSION OF BHD CONSULTING PTY LTD. Sentgiehonty im Soe ea manana, ters ned Datum AKO. EROSION CONTROL PLAN CB0B49 ESC02| C
Page 5
1000ma SETTLING ZONE
500mm STORAGE ZONE
ox, water, tines. ..1
30g tg to
RL
950
ERFORATED RISER. TO:
ii ER SEEPAGE
PT | EASTING MORTHNG
1 | svanests | -coovz27
2 | caunoos | -cooensss
3 | certwen | -co097 963
«| sennzws | -cowsess
SPILLWAY WITH ROCK PROTECTION 5 | corescis | core ros
tm WiDE GEOFABRIC UNDER ALL ROCK 6 | soz | -sooesere
TOP OF BANK 7 | soneses7a | -co072234
RLW7S
SEDIMENT CONTROL BASIN
EMBANKMENT FILL NOTES
1 FILL AREA TO BE STIRPPED OF TOPSOIL AND SURFACE
APPROVED BY GEOTECHNINCAL ENGINEER PRIOR TO THE
COMMENCEMENT OF FILLING.
2 EMBANKMENT FILL MATERIAL SHALL BE FREE OF ORGANIC
MATTER, OVERSIZED INCLUSIONS AND ANY DELTERIOUS
MATERIAL SUCH AS TIMBER, STEEL, PLASTIC OR SOIL OF
EXCESSIVELY HIGH MOISTURE CONTENT THE MAXIMUM
PARTICLE SIZE SHALL NOT EXCEED 150mm FILL TO BE PLACED
IN LAYERS OF 200mm
3 THE FILL SHALL BE PLACED AND COMPACTED AT OR ABOVE
OPTIMUM MOISTURE CONTENT TO THE FOLLOWING REQUIRMENTS
-MIN DENSITY RATIO 96 % SMDD
-MAX DENSITY RATIO 103% SHDD
=VARIATION OF THE FILL MOISTURE CONTENT 0-2% OF
STANDARD OPTIMUK
& THE STRIPPEQ AREA IS TO BE APPROPRIATELY BENCHED
TO FACILITATE NEAR HORIZONTAL FILL PLACEMENT
COMPACTED EARTHWORKS
BUND (TYP)
VALVE END OF PIPE
TO BE OPENED ONLY AFTER BASIN
TESTING TO BE CLOSED AFTER BASIN
DRAINED (TYP)
RAIN AS DIRECTED
ay Sbebaatencen
ALL FLOW FROM
SEDIMENT BASINS TO BE
ORECTED TO CULVERT
UNDER GATEWAY DRIVE,
—
\
APPROX LOCATION OF —4
EXISTING CULVERT. \J
MATCH INTO
WW 3 BATTER
\
MATCH INTE
1) BAT
SEDIMENT BASIN
DISCHARGE L
CATION
IN
%o.
PROPOSEO
|
REFER OWG (B0849-C03
s0m
SSEDIMENT BASIN=2,2
RELIEF DISCHARGE
THROUGH 150 STEEL
PIPE. REFER TO
OeTAK
>
SEOIMENT BASIN
RL 9S
WEIGHTED BASE
mayo
CUT-OFF TRENCH 600am MIN DEPTH JUMPED ROCK )-0 6m DIAL
ACKFILLED WITH IMPERMEA|
Ea mene. Pe
T
NTS.
‘200mm THICK MASS CONCRETE
/. fe» 2SHPo
a: < < . ad Ps
4
a Z ae
« é a a 4a
GRATED MESH TOP «
TO PREVENT LITTER TO oe
x QUTLET NEEDLE PUNCHED o| ff
gy ~ GEOFABRIC 2
re RLISD_ pppoe fe + :
3 150@ STEEL PIPE RISER
‘ TO TOP OF SEDIMENT 4
z STORAGE 20NE 1, 7
2 4a
3 SEDIMENT e
zi STORAGE [see STEEL PIPE
q ZONE ~ -< £ <
q a aan -
: 2 ot : 750
q : got I Qo
i \ 150@ STEEL PIPE NOTE: CONCRETE SURFACE TO BE FINISHED AS SMOOTH
5 MASS cone BASE L ‘AS POSSIBLE ON ALL FACES ~
i CUT-OFF WALL DETAIL
z DETAIL SCALE 120
0 $s » 5 20 ia
cysts
E ‘ SCALE £250 (At)
5
3] Desigt C.PAUKESCU Céent
. BMD Stactine rowers (Gy) | Or | ePAnESE BUNNINGS GROUP LIMITED
. & Project Managers *, 0 S| Checked PMALONEY | Project
=| 6 _[ moosa COUNCL MFORMATION REGUEST Tw | oO | nua _ aS Aen 22 0m a3 m2 mm — BUNNINGS WAREHOUSE NOOSAVILLE
Fs om ew | iz wor CONSULTING Approved By.| PMALONEY Fo=> NOT FOR CONSTRUCTION
3] ps _| essuco For Comment o en | os.007 ‘ 391572 IMENT BASIN 1
3 : Srey suns Head Office - Brisbane PER Ho. SED Drawing No. Rev
al Sowstner o | woe | ose [1 Aneotec Be [we | ee mn Ee Tome mage PLAN AND DETAIL CB0849-£5003] B
i THIS DRAWING CANNOT BE COPIED OR REPRODUCED IN ANY FORM OR USED FOR ANY OTHER PURPOSE OTHER THAN THAT ORIGINALLY INTENDED WITHOUT THE WRITTEN PERMISSION OF BHD CONSULTING PTY LTO Dames iene rat ue ARDS.
Page 6
Fig Mame C\Omumenty and Settingy in hygasCarhtop\ OBNCUEECD. 91 ESE
LOT 26
SP151406
a
REFER DWG (B0849-C01
SEDIMENT BASIN 2 {TYPE ‘C' ORY
CATCHMENT AREA = = 0.75ha
po-a
SETTLING AREA A = 3400 x Q = 460m’
SETTLING DEPTH = 0.6m
BASIN DIMENSIONS AT SURFACE (1:2 RATIO)
A = L80m
Wo 16.0m
30.0m
0.6m
L
D
SETTLING ZONE
D = 0.6m
Vs = 256m?
STORAGE VOLUME = 1.0 x Vs
= 256m?
DEPTH = 0.58m
—_ eee ood
9 5 * nu R om
ee
ore
SCALE 1:400 (All
SECURE GEOTEXTILE TO GABIONS
WITH 20MM TO 30MM AGGREGATE
OR OTHER MEANS
SEDIMENT STORAGE ZONE
SEDIMENT SETTLING ZONE
SETTLING ZONE
CENTRE SPILLWAY
OUTLET
PROTECTION
PLAN VIEW
GABION EMBANKMENT
NEEDLE-PUNCHED GEOFTEXTILE
CREST OF SPILLWAY
500MM
oo
NEEDLE-PUNCHED GEOTEXTILE
\ 600MAy
550
SPILLWAY SECTION
SOOMM MIN, —
DOWNSTREAM ELEVATION
NOTES.
REMOVE ALL VEGETATION AND TOPSOIL FROM UNDER THE DAM WALL AND FROM WITHIN. THE STORAGE
AREA
EXCAVATE TO 300MM DEPTH FOR DAM BASE AND FORM A LEVEL BASE FOR THE GABIONS
LINE THE EXCAVATION WITH A NEEDLE PUNCHED GEOTEXTILE ALLOWING SUFFICIENT GEOTEXTILE TO
LINE FROM THE TOE OF THE DAM, UNDER THE WALL, OVER THE UPSTREAM GABIONS ANO SPILLWAY TO
SOOMM BELOW THE SPILLWAY EXIT ON THE DOWNSTREAM FACE
WALL PROFILE ANO OUTLET PROTECTION SHALL BE MADE UP OF GABION UNITS FILLED WITH GRADED
ROCK AS SPECIFIED ON SWMP
CONSTRUCT A SPILLWAY SOOMM BELOW THE CREST OF THE DAM AND FOR THE WIOTH SPECIFIED ON
THE SWMP
LAP THE GEOQTEXTILE OVER THE UPSTREAM FACE AND THROUGH THE SPILLWAY AND FIX IN PLACE
WITH THE TOP ROW OF GABIONS
COVER THE UPSTREAM FACE AND GEOTEXTILE WITH 20MM TO 30MM GRAVEL
PLACE A “FULL OF SEDIMENT” MARKER TO SHOW WHEN LESS THAN DESIGN CAPACITY OCCURS AND
SEDIMENT REMOVAL IS REQUIRED
REPLACE UPSTREAM GEOTEXTILE LAYER EACH TIME SEDIMENT IS REMOVED
Laer Tere
6 | NOOSA COUNCIL INFORMATION REQUEST tw [ of | ner
A | tSSUED FoR APPROVAL on Pa | 2.10.07
No Amendments ay | Appd | Dato | No. Amondments By
Plat Date 11-00-02 4-17 P84
THIS DRAWING CANNOT Gf COPIED OR REPROQUCED IN ANY FORM OF USEO FOR ANY OTHER PURPOSE OTHER THAN THAT ORKINALLY MTENDED WITHOUT THE WRITTEN PERMISSION OF BMD CONSULTING PTY LTD.
Sygeey Bites
1 The Crescent
Nemeth Gay, WW TET
PO ow 350% hadnt
Chit Engineer
Structural at
& Project Managers %, Misc
TonsuttING
Shapging Centre, MS 2007 wwe
C.PAUNESCU Client
C.PAUNESCU
P_MALONEY | Project
Tito
BUNNINGS GROUP LIMITED
BUNNINGS WAREHOUSE NOOSAVILLE
ABM 23 Ow 143 407
PaALONEY NOT FOR CONSTRUCTION
seenun war SEDIMENT BASIN 2 AND Drawing No. Rev
a — EROSION CONTROL PLAN CB0849 £5604 B
Used in these records
07/2125 - Response to Info Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 638 KB (small file)
- File type
No other editions are linked here.