07/2125 - Response to Info Request [As Published] · 142007.2125

of 6

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

 

Ee nama C\Docenante and Seitiogs in byte Derk ag OUNCES WEST

 
    

REFER DW

  

WB0829-C03_ ———
ee
—p To —_——

 

 

LOT 26
SP151406

   

 

 

EARTHWORKS QUANTITIES

CUT - 16,762m

 

FILL - 25,861m

 

(MPORTEO FILL OF 11,119m (CUT
VOLUME] WILL BE OBTAINED FROM
GATEWAY RISE SITE

—s Sh Sf

 

 

 

 

                   

 

   

   
  

SEDIMENT BASIN 1

 

 

 

 

NOTE:-

1) FOR DETAILS OF EXISTING GROUND CONDITIONS

+ oo
LJ
REFER TO.
A) REPORT PREPARED BY COFFEY

GEOSCIENCES No. 817974/01-B DATED
06.07.2004
B) REPORT PREPARED BY DOUGLAS

PARTNERS No. 33984 DATED 16.08.2006
2) FOR DETAILS OF METHODOLOGY FOR
PROPOSED IN SITU GROUND IMPROVEMENT OF
THE UNCONSOLIDATED FILL ON THE SITE, REFER
TO REPORT BY LANOPAC TECHNOLOGIES No
P718-01.UA} DATED AUGUST 2007

 

 

to (co

 

 

 

 

S823

   

 

 

    
   

   

  

"

    

 

3 STRAND POST AND WIRE
FENCE WITH SAFETY MESH

   

TOTAL CATCHMENT (AJ © 2 76ha.
ASSUME > 33% OF SOW ¢ 002@
tw 2 OS

SETTLING VOLUME (Vs) + 100 & kaa Cv x A
vr SIT a 05 x 276
© 73a!

SETTLING DEPTH = 1.0m

GASIN DIMENSIONS AT @ASE 112 RATION

Ar Me!

wo 908

L + om

De 10m

      

     

ROCK CHECK OAMS TO BE SPACED
NO MORE THAN SOm APART

1k

Vs © 722m!

STORAGE VOLUME © 0.5 x Vs
= lbte

DEPTH © OSm

SPULWAY AREA
2 10%
150mm
oom
h mnutes
60ma/h
0.77
Crtxa
905 L/see

 

are

 

 

 

         

 

 
  

   

WEIR FORMULA: @ © 08 e146 x LN

            

= 1328 UK

= 0965 701.920
bite

0.166)

  

   

CONVEYANCE
CATCHMENT AREA

  

(0 —— (0 —— (0 tm 7

WEIR FLOW DEPTH © 333e0

 

 

                       

 

 

PROPOSED EARTHWORKS
CONTOURS
(0 2m INTERVALS)

PROPOSED SED
BASIN CONTOURS
{0.2m INTERVALS}

SILT FENCE

32 STRAND POST & WIRE FENCE
WITH SAFETY MESH

ROCK EROSION PROTECTION

CONSTRUCTION EXIT/ENTRY

TRAFFIC CLEANING FACILITY

CATCH DRAIN

ROCK CHECK DAMS

TEMPORARY SEDIMENT BASIN

 

 

NOTE:

 

 

 

LOCATION & LEVELS OF ALL EXISTING SERVICES
TO BE CONFIRMED ON SITE BY CONTRACTOR
PRIOR TO THE COMMENCEMENT OF CONSTRUCTION
IT I$ THE CONTRACTOR'S RESPONSIBILITY TO
PERFORM A OAL BEFORE YOU O16 SEARCH PRIOR
TO COMMENCEMENT OF WORKS

 

 

 

 

 

2.

 

COMPACTION.

 

SEDIMENTATION NOTES

 

BEING LOWEREO

WILL ADVISE ON TREATMENT.

FABRIC

CONSTRUCTION PHASE SEQUENCE

ew —_—e—Eeorr EOS

1. CONSTRUCT SEDIMENT BASIN, SEQIMENT FENCES AND DIVERSION BUNDS.

COMMENCE CLEARING AND CONSTRUCT CATCH DRAINS.
3. COMMENCE FILLING AND EARTHWORKS INCLUDING COMPACTION.
&. CONSTRUCTION OF STORMWATER LINES AND GULLIES INCLUDING BACKFILLING AND

S TURF STRIPS 900mm WIDE SHALL BE LAID TO BASE OF ALL DOWNSTREAM
EARTHWORKS BATTERS - ANO THE REMAINDER OF THE BATTERS SHALL BE TOPSOILED
AND GRASS SEEDED IMMEDIATELY UPON COMPLETION OF EARTHWORKS, ANO AT THE

Zoe SATISFACTION OF SUPERINTENDENT. EIGHTY PERCENT {80%} GRASS COVERAGE SHOULD

BE ACHIEVED PRIOR TO REMOVAL. SEDIMENT FENCES TO BE REMOVED AFTER
CONSTRUCTION OF ROADS

1. ALL SEDIMENT CONTROL DEVICES (SILT FENCES, SPILLWAYS, ROCK CHECK DAMS) TO BE
CHECKED AFTER ALL MAJOR RAINFALL EVENTS AND RECTIFIED AS NECESSARY

2. F SEDIMENT WATER IS SHOWN TO HAVE SUSPENDED SOLIDS > SOmg/Lt. THEN THE USE OF
A FLOCCULANT IS TO BE APPLIED AS DIRECTEO BY SUPERINTENDENT PRIOR TO THE BASIN

THE BASIN IS TO BE ORAINED BY OPENING THE VALVE OR UNPLUGGING THE END OF THE

OUTLET PIPE. ONCE DRAINED THE OUTLET PIPE WILL BE PLUGGED AGAIN,

THE FIELO TEST tS :- FILL A CLEAR 6Smm SOFT DRINK BOTTLE WITH BASIN WATER
IF YOU CAN NOT SEE CLEARLY THROUGH THE SAMPLE, THEN A
FLOCCULANT NEEDS TO BE APPLIED.

THE PH OF THE WATER MUST BE IN THE RANGE 65 to 8.5 PRIOR TO DISCHARGE.

RESULTS ARE OUTSIDE THESE LIMITS THE SUPERINTENDENT IS TO BE NOTIFIED ANO HE

3. OUTLET BAFFLE - POSTS 100mm - AT tm CRS SET 800mm DEEP WITH SEDIMENT FENCE

(F THE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4. INLET BAFFLE - POSTS 100mm - AT tm CRS SET 600mm OEEP WITH SEDIMENT FENCE FABRIC
WITH SOmm HOLES CUT AT 300mm CRS
5. SEDIMENT BASINS TO BE INSPECTED AT LEAST ONCE EVERY WEEK AND DE-SILTED AFTER
EACH MAJOR STORM EVENT OR AS DIRECTED BY SUPERINTENDENT.
— 6. THE FINAL LOCATION OF SILTATION AND EROSION CONTROL DEVICES HAY BE ADJUSTED AS
Fy NECESSARY ON SITE BY THE SUPERINTENDENT
E SCALE 1.500 (At)
: ‘Design C.PAUNESCU Chent
: a Strata! Enanoers (@G | [ome [cranes BUNNINGS GROUP LIMITED
=] _© | moose Counce TOM REQUEST tw | op [uve & Project Managers *,) Checked P.MALONEY | Project
BLS | ceorecreacat Corments 40060 on] en (SS sana go rea can obs Ogi BUNNINGS WAREHOUSE NOOSAVILLE
ite tetioeret = [me CONSULTING Aewrves On| CAE Pe HOT FOR CONSTRUCTION
7 1 wt
o | es Srey tae Head Offge - Brinbane NPER No | 191572 SEDIMENT BASIN 1 AND Drawing No. Rev
a ‘Amendinents By | Appt Ho. Amendenects By | Ape | Date | car fam aensees Pr (07) 3893 151 Date 09.40.07 N _
3 THES DRAWING CANNOT BE COPED OR REPROOUCED ON ANY FORM OR USED FOR ANY OTHER PURPOSE OTHER THAN THAT ORIGNALLY INTENDED WITHOUT THE WRITTEN PERM®SSION OF BHD CONSULTING PTY LTD. Sentgiehonty im Soe ea manana, ters ned Datum AKO. EROSION CONTROL PLAN CB0B49 ESC02| C

 

Used in these records

About this file

File size
638 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2125 - Response to Info Request [As Published].pdf · 638 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.