07/2125 - Response to Info Request [As Published] · 142007.2125
Ee nama C\Docenante and Seitiogs in byte Derk ag OUNCES WEST
REFER DW
WB0829-C03_ ———
ee
—p To —_——
LOT 26
SP151406
EARTHWORKS QUANTITIES
CUT - 16,762m
FILL - 25,861m
(MPORTEO FILL OF 11,119m (CUT
VOLUME] WILL BE OBTAINED FROM
GATEWAY RISE SITE
—s Sh Sf
SEDIMENT BASIN 1
NOTE:-
1) FOR DETAILS OF EXISTING GROUND CONDITIONS
+ oo
LJ
REFER TO.
A) REPORT PREPARED BY COFFEY
GEOSCIENCES No. 817974/01-B DATED
06.07.2004
B) REPORT PREPARED BY DOUGLAS
PARTNERS No. 33984 DATED 16.08.2006
2) FOR DETAILS OF METHODOLOGY FOR
PROPOSED IN SITU GROUND IMPROVEMENT OF
THE UNCONSOLIDATED FILL ON THE SITE, REFER
TO REPORT BY LANOPAC TECHNOLOGIES No
P718-01.UA} DATED AUGUST 2007
to (co
S823
"
3 STRAND POST AND WIRE
FENCE WITH SAFETY MESH
TOTAL CATCHMENT (AJ © 2 76ha.
ASSUME > 33% OF SOW ¢ 002@
tw 2 OS
SETTLING VOLUME (Vs) + 100 & kaa Cv x A
vr SIT a 05 x 276
© 73a!
SETTLING DEPTH = 1.0m
GASIN DIMENSIONS AT @ASE 112 RATION
Ar Me!
wo 908
L + om
De 10m
ROCK CHECK OAMS TO BE SPACED
NO MORE THAN SOm APART
1k
Vs © 722m!
STORAGE VOLUME © 0.5 x Vs
= lbte
DEPTH © OSm
SPULWAY AREA
2 10%
150mm
oom
h mnutes
60ma/h
0.77
Crtxa
905 L/see
are
WEIR FORMULA: @ © 08 e146 x LN
= 1328 UK
= 0965 701.920
bite
0.166)
CONVEYANCE
CATCHMENT AREA
(0 —— (0 —— (0 tm 7
WEIR FLOW DEPTH © 333e0
PROPOSED EARTHWORKS
CONTOURS
(0 2m INTERVALS)
PROPOSED SED
BASIN CONTOURS
{0.2m INTERVALS}
SILT FENCE
32 STRAND POST & WIRE FENCE
WITH SAFETY MESH
ROCK EROSION PROTECTION
CONSTRUCTION EXIT/ENTRY
TRAFFIC CLEANING FACILITY
CATCH DRAIN
ROCK CHECK DAMS
TEMPORARY SEDIMENT BASIN
NOTE:
LOCATION & LEVELS OF ALL EXISTING SERVICES
TO BE CONFIRMED ON SITE BY CONTRACTOR
PRIOR TO THE COMMENCEMENT OF CONSTRUCTION
IT I$ THE CONTRACTOR'S RESPONSIBILITY TO
PERFORM A OAL BEFORE YOU O16 SEARCH PRIOR
TO COMMENCEMENT OF WORKS
2.
COMPACTION.
SEDIMENTATION NOTES
BEING LOWEREO
WILL ADVISE ON TREATMENT.
FABRIC
CONSTRUCTION PHASE SEQUENCE
ew —_—e—Eeorr EOS
1. CONSTRUCT SEDIMENT BASIN, SEQIMENT FENCES AND DIVERSION BUNDS.
COMMENCE CLEARING AND CONSTRUCT CATCH DRAINS.
3. COMMENCE FILLING AND EARTHWORKS INCLUDING COMPACTION.
&. CONSTRUCTION OF STORMWATER LINES AND GULLIES INCLUDING BACKFILLING AND
S TURF STRIPS 900mm WIDE SHALL BE LAID TO BASE OF ALL DOWNSTREAM
EARTHWORKS BATTERS - ANO THE REMAINDER OF THE BATTERS SHALL BE TOPSOILED
AND GRASS SEEDED IMMEDIATELY UPON COMPLETION OF EARTHWORKS, ANO AT THE
Zoe SATISFACTION OF SUPERINTENDENT. EIGHTY PERCENT {80%} GRASS COVERAGE SHOULD
BE ACHIEVED PRIOR TO REMOVAL. SEDIMENT FENCES TO BE REMOVED AFTER
CONSTRUCTION OF ROADS
1. ALL SEDIMENT CONTROL DEVICES (SILT FENCES, SPILLWAYS, ROCK CHECK DAMS) TO BE
CHECKED AFTER ALL MAJOR RAINFALL EVENTS AND RECTIFIED AS NECESSARY
2. F SEDIMENT WATER IS SHOWN TO HAVE SUSPENDED SOLIDS > SOmg/Lt. THEN THE USE OF
A FLOCCULANT IS TO BE APPLIED AS DIRECTEO BY SUPERINTENDENT PRIOR TO THE BASIN
THE BASIN IS TO BE ORAINED BY OPENING THE VALVE OR UNPLUGGING THE END OF THE
OUTLET PIPE. ONCE DRAINED THE OUTLET PIPE WILL BE PLUGGED AGAIN,
THE FIELO TEST tS :- FILL A CLEAR 6Smm SOFT DRINK BOTTLE WITH BASIN WATER
IF YOU CAN NOT SEE CLEARLY THROUGH THE SAMPLE, THEN A
FLOCCULANT NEEDS TO BE APPLIED.
THE PH OF THE WATER MUST BE IN THE RANGE 65 to 8.5 PRIOR TO DISCHARGE.
RESULTS ARE OUTSIDE THESE LIMITS THE SUPERINTENDENT IS TO BE NOTIFIED ANO HE
3. OUTLET BAFFLE - POSTS 100mm - AT tm CRS SET 800mm DEEP WITH SEDIMENT FENCE
(F THE
4. INLET BAFFLE - POSTS 100mm - AT tm CRS SET 600mm OEEP WITH SEDIMENT FENCE FABRIC
WITH SOmm HOLES CUT AT 300mm CRS
5. SEDIMENT BASINS TO BE INSPECTED AT LEAST ONCE EVERY WEEK AND DE-SILTED AFTER
EACH MAJOR STORM EVENT OR AS DIRECTED BY SUPERINTENDENT.
— 6. THE FINAL LOCATION OF SILTATION AND EROSION CONTROL DEVICES HAY BE ADJUSTED AS
Fy NECESSARY ON SITE BY THE SUPERINTENDENT
E SCALE 1.500 (At)
: ‘Design C.PAUNESCU Chent
: a Strata! Enanoers (@G | [ome [cranes BUNNINGS GROUP LIMITED
=] _© | moose Counce TOM REQUEST tw | op [uve & Project Managers *,) Checked P.MALONEY | Project
BLS | ceorecreacat Corments 40060 on] en (SS sana go rea can obs Ogi BUNNINGS WAREHOUSE NOOSAVILLE
ite tetioeret = [me CONSULTING Aewrves On| CAE Pe HOT FOR CONSTRUCTION
7 1 wt
o | es Srey tae Head Offge - Brinbane NPER No | 191572 SEDIMENT BASIN 1 AND Drawing No. Rev
a ‘Amendinents By | Appt Ho. Amendenects By | Ape | Date | car fam aensees Pr (07) 3893 151 Date 09.40.07 N _
3 THES DRAWING CANNOT BE COPED OR REPROOUCED ON ANY FORM OR USED FOR ANY OTHER PURPOSE OTHER THAN THAT ORIGNALLY INTENDED WITHOUT THE WRITTEN PERM®SSION OF BHD CONSULTING PTY LTD. Sentgiehonty im Soe ea manana, ters ned Datum AKO. EROSION CONTROL PLAN CB0B49 ESC02| C
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2125 - Response to Info Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 638 KB (small file)
- File type
No other editions are linked here.