Council archive · source document
07/2125 - Response to Info Request [As Published] · 142007.2125
Fig Mame C\Omumenty and Settingy in hygasCarhtop\ OBNCUEECD. 91 ESE
LOT 26
SP151406
a
REFER DWG (B0849-C01
SEDIMENT BASIN 2 {TYPE ‘C' ORY
CATCHMENT AREA = = 0.75ha
po-a
SETTLING AREA A = 3400 x Q = 460m’
SETTLING DEPTH = 0.6m
BASIN DIMENSIONS AT SURFACE (1:2 RATIO)
A = L80m
Wo 16.0m
30.0m
0.6m
L
D
SETTLING ZONE
D = 0.6m
Vs = 256m?
STORAGE VOLUME = 1.0 x Vs
= 256m?
DEPTH = 0.58m
—_ eee ood
9 5 * nu R om
ee
ore
SCALE 1:400 (All
SECURE GEOTEXTILE TO GABIONS
WITH 20MM TO 30MM AGGREGATE
OR OTHER MEANS
SEDIMENT STORAGE ZONE
SEDIMENT SETTLING ZONE
SETTLING ZONE
CENTRE SPILLWAY
OUTLET
PROTECTION
PLAN VIEW
GABION EMBANKMENT
NEEDLE-PUNCHED GEOFTEXTILE
CREST OF SPILLWAY
500MM
oo
NEEDLE-PUNCHED GEOTEXTILE
\ 600MAy
550
SPILLWAY SECTION
SOOMM MIN, —
DOWNSTREAM ELEVATION
NOTES.
REMOVE ALL VEGETATION AND TOPSOIL FROM UNDER THE DAM WALL AND FROM WITHIN. THE STORAGE
AREA
EXCAVATE TO 300MM DEPTH FOR DAM BASE AND FORM A LEVEL BASE FOR THE GABIONS
LINE THE EXCAVATION WITH A NEEDLE PUNCHED GEOTEXTILE ALLOWING SUFFICIENT GEOTEXTILE TO
LINE FROM THE TOE OF THE DAM, UNDER THE WALL, OVER THE UPSTREAM GABIONS ANO SPILLWAY TO
SOOMM BELOW THE SPILLWAY EXIT ON THE DOWNSTREAM FACE
WALL PROFILE ANO OUTLET PROTECTION SHALL BE MADE UP OF GABION UNITS FILLED WITH GRADED
ROCK AS SPECIFIED ON SWMP
CONSTRUCT A SPILLWAY SOOMM BELOW THE CREST OF THE DAM AND FOR THE WIOTH SPECIFIED ON
THE SWMP
LAP THE GEOQTEXTILE OVER THE UPSTREAM FACE AND THROUGH THE SPILLWAY AND FIX IN PLACE
WITH THE TOP ROW OF GABIONS
COVER THE UPSTREAM FACE AND GEOTEXTILE WITH 20MM TO 30MM GRAVEL
PLACE A “FULL OF SEDIMENT” MARKER TO SHOW WHEN LESS THAN DESIGN CAPACITY OCCURS AND
SEDIMENT REMOVAL IS REQUIRED
REPLACE UPSTREAM GEOTEXTILE LAYER EACH TIME SEDIMENT IS REMOVED
Laer Tere
6 | NOOSA COUNCIL INFORMATION REQUEST tw [ of | ner
A | tSSUED FoR APPROVAL on Pa | 2.10.07
No Amendments ay | Appd | Dato | No. Amondments By
Plat Date 11-00-02 4-17 P84
THIS DRAWING CANNOT Gf COPIED OR REPROQUCED IN ANY FORM OF USEO FOR ANY OTHER PURPOSE OTHER THAN THAT ORKINALLY MTENDED WITHOUT THE WRITTEN PERMISSION OF BMD CONSULTING PTY LTD.
Sygeey Bites
1 The Crescent
Nemeth Gay, WW TET
PO ow 350% hadnt
Chit Engineer
Structural at
& Project Managers %, Misc
TonsuttING
Shapging Centre, MS 2007 wwe
C.PAUNESCU Client
C.PAUNESCU
P_MALONEY | Project
Tito
BUNNINGS GROUP LIMITED
BUNNINGS WAREHOUSE NOOSAVILLE
ABM 23 Ow 143 407
PaALONEY NOT FOR CONSTRUCTION
seenun war SEDIMENT BASIN 2 AND Drawing No. Rev
a — EROSION CONTROL PLAN CB0849 £5604 B
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2125 - Response to Info Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 638 KB (small file)
- File type
No other editions are linked here.