June 2006 -5- 06683025-1000(AA) The results of groundwater pH testing indicate that the groundwater is slightly acidic (pH 6.4 to pH 6.46), with EC testing indicating ‘fresh’ water. The Cl:SO, ratio would normally indicate previous oxidation of ASS, however due to the ‘fresh’ nature of the groundwater and relatively low sulphate concentration this measure is not a reliable indicator of previous oxidation of ASS in this instance. 6.0 ACID SULFATE SOILS The development of potential acid sulfate soils (PASS) is commonly the result of marine and estuarine deposition of sulfate and iron bearing sediments in the presence of an abundant source of readily decomposable organic matter resulting in the deposition of pyrite. This pyrite is stable within the soil so long as anoxic conditions prevail. Oxidation of this material produces acidic conditions and oxidation typically occurs as the material is exposed above the water table by excavation. Previous experience and available guidelines indicate that PASS are normally restricted in extent to recent (Holocene to Pleistocene age) soil horizons deposited in a saline environment below RL 5 m. The State Planning Policy SPP2/02 Planning and Managing Development Involving Acid Sulfate Soils applies to land, soil and sediment at or below 5 m AHD where the natural ground level is less than 20m AHD. Within such areas the SPP applies to development involving any of the following: ¢ Excavating or otherwise removing 100 m’ or more of soil or sediment; or e Filling of land involving 500 m’or more of material with an average depth of 0.5 m or greater. The southern part of the site is generally lower than RL 5 m AHD. The proposed development layout indicates that a majority of this area to will be allocated as parkland, and as such will undergo minimal disturbance. However, the proposed subdivision will require construction of access roads and services trenches to be undertaken along areas below RL 5 m AHD. SPP2/02 is therefore applicable to this site and an assessment of potential disturbance of ASS is required. 6.1 Investigation Aims The aims of this investigation were to: ¢ Conduct a preliminary ASS assessment in accordance with SPP 2/02 and Queensland Sampling Guidelines; e Identify the extent (if any) of ASS in the proposed disturbance area; and Golder Associates
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Application part 2 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 7.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.