Council archive · source document
Application part 2 [As Published] · 142007.1242
—— —— = —~ Fe EXPLANATION OF NOTES, ABBREVIATIONS & TERMS = Golder Associates USED ON BOREHOLE AND TEST PIT REPORTS DRILLING/EXCAVATION METHOD AS* Auger Screwing RD Rotary blade or drag bit HQ Diamond Core - 63 mm AD* Auger Drilling RT Rotary Tricone bit NMLC Diamond Core - 52 mm “v V-Bit RAB Rotary Air Blast NQ Diamond Core - 47 mm ‘T TC-Bit, e.g. ADT Rc Reverse Circulation BH Tractor Mounted Backhoe HA Hand Auger PT Push Tube EX Tracked Hydraulic Excavator OTC __Diatube Coring cT Cable Tool Rig EE Existing Excavation WB Washbore or Bailer JET Jetting HAND Excavated by Hand Methods PENETRATION/EXCAVATION RESISTANCE L Low resistance. Rapid penetration possible with little effort from the equipment used. M Medium resistance. Excavation/possible at an acceptable rate with moderate effort from the equipment used. H High resistance to penetration/excavation. Further penetration is possible at a slow rate and requires significant effort from the equipment. R Refusal or Practical Refusal. No further progress possible without the risk of damage or unacceptable wear to the digging implement or machine. These assessments are subjective and are dependent on many factors including the equipment power, weight, condition of excavation or drilling tools, and the experience of the operator. WATER Vv Water level at date shown <) Partial water toss Cc Water inflow <q Complete water loss GROUNDWATER NOT The observation of groundwater, whether present or not, was not possible due to drilling OBSERVED water, surface seepage or cave in of the borehole/test pit. GROUNDWATER NOT The borehole/test pit was dry soon after excavation. However, groundwater could be ENCOUNTERED present in tess permeable strata. Inflow may have been observed had the borehole/test pit been left open for a longer period. SAMPLING AND TESTING SPT Standard Penetration Test to AS1289.6.3.1-1993 4,7,11 N=18 4,7,11 = Blows per 150mm. N = Blows per 300mm penetration following 150mm seating 30/80mm Where practical refusal occurs, the blows and penetration for that interval are reported RW Penetration occurred under the rod weight only HW Penetration occurred under the hammer and rod weight only HB Hammer double bouncing on anvil DS Disturbed sample BDS Bulk disturbed sample G Gas Sample Ww Water Sample FP Field permeabitity test over section noted FV Field vane shear test expressed as uncorrected shear strength (sy = peak value, s, = residual value) PID Photoionisation Detector reading in ppm PM Pressuremeter test over section noted PP Pocket penetrometer test expressed as instrument reading in kPa U63 Thin wailed tube sample - number indicates nominal sample diameter in millimetres Ranking of Visually Observable Contamination and Odour (for specific soil contamination assessment projects) R=0 No visible evidence of contamination R=A No non-natural odours identified R=1 Slight evidence of visible contamination R=B8 Slight non-naturat odours identified R=2 Visible contamination R=C Moderate non-natural odours identified R=3 Significant visible contamination R=D Strong non-natural odours identified ROCK CORE RECOVERY TCR = Totat Core Recovery (%) SCR = Solid Core Recovery (%) RQD = Rock Quality Designation (%) - Length of core recovered x100 - > Length of cylindrical core recovered 100 : >, Axial lengths of core > 100 mm x10 Length of core run Length of core run Length of core run GAP Form No. 6 RLa
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Application part 2 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 7.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.