Council archive · source document
Application part 2 [As Published] · 142007.1242
Work Order : E€B0606403 PageNumber =: 20f5 4 p
Cltent : GOLDER ASSOCIATES
: EN/002/05 Issue Date : 12 Jul 2006 ALS Enutroncid
Project 06683025 ALS Quote Reference
Interpretive Quality Control Report - Analysis Holding Time
The following report summarises extraction / preparation and analysis times and compares with recommended holding times. Dates reported represent first date of extraction or analysis and preclude subsequent dilutions and
reruns. Information is also provided re the sample container (preservative) from which the sample aliquot was taken. Elapsed time to analysis represents time from sampling where no extraction / digestion is involved or time
from extraction / digestion where this is present. For composite samples, sampling date/time is taken as that of the oldest sample contributing to that composite. Sample date/time for laboratory produced feaches are taken
from the comptetion date/time of the leaching process. Outliers for holding time are based on USEPA SW846, APHA, AS and NEPM (1999). Failed outliers, refer to the ‘Summary of Outliers’.
Matrix Type: SOIL Analysis Holding Time and Preservation
Method Date Sampled Extraction | Preparation natyais
ontainer/ Client Samale [Dts Date extracted _[ Due for extraction
|EA033: Chromium Suite for Acid Sulphate Soils __ . a ee _ - ae - peepee a sae pone: -
Snap Lock Bag
BH1 - 0.25, BH1 - 1.25, 29 Jun 2006 6 Jul 2006 30 Jun 2006 | Fall by 6 days 6 Jul 2006 4 Oct 2006 Pass
BH1 - 2.25, BH2 - 0.5,
BH2 - 1.25, BH2- 2.5,
BH3 - 0.75, BH3- 4.5,
BH3-3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Application part 2 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 7.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.