Council archive · source document
Application part 2 [As Published] · 142007.1242
Client z GOLDER ASSOCIATES Work Order : €BO700165 PageNumber =: 60f7
Project : 06683025 EENIE CRK RD ALS Quote Reference : EN/002/05 issue Date > 18Jan 2007
Qutliers ; Analysis Holding Time
The following report highlights outliers within this ‘Interpretive Quatity Control Report - Analysis Holding Time’.
Method
Containers
Extraction / Preparation Analysis
Date exiracied | Due for extraction Date analysed | Ouaforanalysis | Pass? |
4 Jan 2007 _ _ I: |= 9 Jan 2007 6 Jan 2007 Fall by 3 days
EKOS7: Nitrite as N . a ee a ee
Cloar Plastic Bottle - Natural
sw, swa, 4 Jan 2007 _ 10 Jan 2007 6 Jan 2007 Fail by 4 days.
Sw3, SwW4,
SW5
+ *e yt Ss ¥. a ¥ , :
EKO71F: Reactive Phosphorus.- Filtered
Clear Plastic Bottto - Natural
Swi, swa2,
sws, swa,
_ _- 10 Jan 2007 € Jan 2007
4 Jan 2007
* ot BERL ay
44 Jan 2007 8 Jan 2007 Fail by 6 days
sw
|EP030; Biochemical Oxygen Demand (BOD) "=: wot Ring EE |
BOD Bottle Unpreserved
SW, sw2, 4 Jan 2007 _ _ _ 9 Jan 2007 8 Jan 2007 Fail by 3 days
SW3,
ers; i fe:
The following report highlights outilers within this ‘Interpretive Quatity Control Report - Frequency of Quality Contra! Samples’.
@ No frequency outliers occur.
A Cumpuod Biotrary Lats ny
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Application part 2 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 7.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.