Original source · versioned page text
MCU14/0028 Appendix 2 EnvProtAct 1994
Original PDF page 240, section 1. The text section number identifies this passage in the reader.
Environmental Protection Act 1994
Chapter 5A General provisions about environmentally relevant activities
Part 6 Progressive rehabilitation
[s 318ZC]
obligation for the certified rehabilitated area than any
obligation applying under the existing conditions.
Example of a change to impose a more stringent requirement—
A change to an existing condition to require rehabilitation to alter a
gradient to a lower slope is more stringent because of the necessarily
increased costs of recontouring the gradient.
(4) The obligation under subsection (2) ends on the last of the
following to happen—
(a) the surrender under resource legislation of the relevant
tenure, or part of the relevant tenure;
(b) the environmental authority ends or ceases to have
effect;
(c) if the existing conditions include a condition requiring
compliance with an obligation after the authority ends
or ceases to have effect—compliance with the condition.
Subdivision 2 Applying for progressive
certification
318ZC Who may apply for progressive certification
The holder of an environmental authority for a resource
project may apply for progressive certification (the
progressive certification application) for a relevant tenure for
the environmental authority.
318ZD Requirements for progressive certification application
(1) The application must be—
(a) in the approved form; and
(b) supported by enough information to enable the
administering authority to decide the application; and
(c) accompanied by—
Page 238 Current as at 20 February 2014
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.