Skip to the record
Search everything, all in one place.

Original source · versioned page text

MCU14/0028 Appendix 2 EnvProtAct 1994

of 814

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 502, section 1. The text section number identifies this passage in the reader.

Environmental Protection Act 1994
Chapter 13 Savings, transitional and related provisions
Part 2 Transitional provisions for Environmental Protection and Other Legislation
Amendment Act 2000
[s 603B]

                       can, in carrying out the relevant mining activities for the
                       converted authority, comply with—
                       (i)   the relevant standard environmental conditions for
                             the stated type of environmental authority; or
                       (ii) the relevant standard environmental conditions and
                            any additional conditions requested; and
                 (e)   be accompanied by the fee prescribed under a
                       regulation.

603B Automatic conversion for particular applications
           (1)   This section applies on the making of a conversion application
                 if it complies with section 603A.
           (2)   If the application is for a code compliant authority, the
                 relevant transitional authority becomes a code compliant
                 authority under chapter 5.
           (3)   If the application is for a non-code compliant authority for a
                 level 2 mining project and no additional conditions are
                 requested in the application, the relevant transitional authority
                 becomes a non-code compliant authority for a level 2 mining
                 project.

603C Deciding application if additional conditions requested
           (1)   This section applies if the conversion application is for a
                 non-code compliant authority for a level 2 mining project and
                 additional conditions are requested in the application.
           (2)   The administering authority must, within 10 business days
                 after it receives the application, decide whether—
                 (a)   to grant the application; and
                 (b)   if it decides to grant—to impose the additional
                       conditions.
           (3)   However, an additional condition may be imposed only if the
                 administering authority considers—
Page 500                                                   Current as at 20 February 2014
Log in to download the original file

MCU14_0028 Appendix 2 EnvProtAct 1994.pdf · 2.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.