MCU14/0028 Appendix 2 EnvProtAct 1994
Original PDF page 557, section 1. The text section number identifies this passage in the reader.
Environmental Protection Act 1994
Chapter 13 Savings, transitional and related provisions
Part 16 Transitional provisions for Geothermal Energy Act 2010
[s 663]
(2) Even if the authority holder does not give a revised (CSG) EM
plan within 1 year after the commencement day, the obligation
under subsection (1) continues until—
(a) the holder gives the administering authority a revised
(CSG) EM plan; or
(b) a CSG amendment is made to the existing CSG
authority.
Note—
Under section 312E(1) the administering authority may amend
an environmental authority (chapter 5A activities) if it considers
the amendment is necessary or desirable because of a matter
mentioned in section 312E(2), including (under section
312E(2)(a)) a contravention of this Act by the holder.
663 First annual return for existing CSG authority
Section 316A does not apply to the first annual return that the
holder of an existing CSG authority is required to lodge after
the commencement day unless the holder has given the
administering authority a revised (CSG) EM plan for the
existing CSG authority.
Part 16 Transitional provisions for
Geothermal Energy Act 2010
664 Deferral of requirement for environmental authority
for existing authorised geothermal activities
(1) This section applies if—
(a) immediately before the commencement of this section, a
geothermal activity was authorised to be carried out
under the repealed Geothermal Exploration Act 2004;
and
Current as at 20 February 2014 Page 555
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.