Original source · versioned page text
MCU14/0028 Appendix 2 EnvProtAct 1994
Original PDF page 607, section 1. The text section number identifies this passage in the reader.
Environmental Protection Act 1994
Schedule 2
Section Description of decision
396(1) decision whether land is still contaminated land
398(2) requirement for additional information about validation
report
399(1) extension of time for consideration of validation report
405(2)(a) decision to prepare site management plan
405(2)(b) requirement to prepare or commission site management
or 411(1) plan
407(3) refusal of application for waiver of requirement to prepare
or commission site management plan
411(2)(a) requirement for additional information about site
management plan
412 decision whether to approve draft site management plan
415(1) extension of time for decision about approval of draft site
management plan
419(2)(a) decision to prepare an amendment of a site management
plan
419(2)(b) requirement for preparation and submission of draft
amendment of site management plan
419A(2) requirement to make residual risk payment
423(1) erection of sign on contaminated land for which
particulars are not recorded on the environmental
management register or contaminated land register
424(3) refusal of disposal permit application
424(3) and (4) imposition of conditions on disposal permit
Current as at 20 February 2014 Page 605
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.