Original source · versioned page text
MCU14/0028 Appendix 2 EnvProtAct 1994
Original PDF page 63, section 1. The text section number identifies this passage in the reader.
Environmental Protection Act 1994
Chapter 3 Environmental impact statements
Part 1 EIS process
[s 41]
Division 2 Terms of reference stage
Subdivision 1 Draft terms of reference
41 Submission
(1) The proponent must submit to the chief executive draft terms
of reference for the EIS that allow the purposes of the EIS to
be achieved for the project.
(2) The submitted draft must—
(a) be in the approved form; and
(b) be accompanied by the fee prescribed under a
regulation; and
(c) if any of the operational land for the project is in a wild
river area—
(i) if mining activities (other than activities carried out
for specified works) are to be carried out below the
surface of the wild river high preservation area or
wild river special floodplain management area or
under a nominated waterway in the wild river
area—include a statement of how the proponent
proposes to decide the minimum depth below the
surface of the land under which the mining
activities can be carried out to comply with the
wild river declaration for the area; and
(ii) include any other matter that the wild river
declaration states must be included in the draft
terms of reference for the EIS; and
(d) include any matter prescribed under a regulation.
(3) Also, if an approval has not been given under part 2 for the
project, the submitted draft must be accompanied by the
following—
Current as at 20 February 2014 Page 61
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.