Council archive · source document
ATTACHMENT to Decision Noitce - DERM Referral Condtions 132008.1128
ecoaccess environmental licences and permits Notice Amended Concurrence Agency Response (c) Koala habitat trees identified within the building areas which extend into to the western conservation buffer zone. Rehabilitation of Koala Habitat 4, Rehabilitation of koala habitat is to be undertaken in accordance with the current Landscape Plan, — Vegetation Management Plan and Bushfire Assessment Report to be submitted to the DERM and Sunshine Coast Regional Council prior to commencement of operational works. a) Plant species assemblage, density and distribution including the understorey should resemble the surrounding regional ecosystem. b) Depending on availability, ail koala habitat tree species are to be derived from local seed stock. Alternative stock (preference given to 'native to area’ species) can be used if prior approval is glven by the DERM. , c) Suitable protective measures are required to be installed around the rehabilitation area(s} at the time of planting and remain in place until the maintenance period has finished. d) All revegetation must be completed within one (1) year of the date an operational works approval is issued by Sunshine Coast Regional Council. e) Maintenance of all completed revegetation is to be undertaken by the applicant aver a period of two (2) years, commencing from the date revegetation Is completed. Maintenance actions are to address the following: . » stabilisation of soil structure; ® replacement of dead or diseased tree plantings; ® regular watering, taking into consideration current water restrictions; and e removal and management of noxious plant and environmental weed species, Construction in a Koala Habitat Area 5, Clearing and construction on the subject site must be limited fo the hours between 6am and 6pm. 6. During construction, the driving and parking of vehicles, as well as stockpiling of soil and other materials, must be carried out away from the root zone of trees to be retained. 7. The applicant shall ensure that all employees, contractors, subcontractors, agents or any other person engaged or employed to carry out building works under this Development Permit comply at all times with the requirements of this Development Permit and do not clear any vegetation that is not approved to be cleared under this Development Permit or in a manner that is inconsistent with it. 8. The applicant shall notify the DERM Customer Service Centre on phone (07) 3227 8185 or email at [email protected] at least 5 business days prior to the commencement of any clearing of koala habitat trees on the subject site of the date clearing is to commence and the koala spotter to be used. 9. Domestic dogs are not permitted on the site during construction. ' Traffic 10. Traffic entering and exiting the site should be kept to a minimum between the hours of Gem and 6am. 14, Signage depicting a koala and a maximum speed limit of 30km/h should be erected at the entrance to the site to inform visitors that koalas may be present on the site. Page 3 of § * AFO80109 Dapartment of Environment and Resource Management
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
ATTACHMENT to Decision Noitce - DERM Referral Condtions 132008.1128.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.3 MB (small file)
- File type
No other editions are linked here.