APPROVED Decision Notice MCU17/0020

of 1

Text shows just the words. Original shows the document exactly as it was published.

Officer:	Patrick Murphy
Direct Telephone:	07 5329 6436
Our Reference:	MCU17/0020
Your Reference:	N/A

26 July 2017

Martoo Consulting
PO Box 1684
NOOSA HEADS  QLD  4567

Dear Sir/Madam

Decision Notice
Sustainable Planning Act 2009
I refer to your application and advise that on 20 July 2017, Council decided to approve the application in full subject to conditions.
Details of the decision are as follows:
application details
Application No:	MCU17/0020
Street Address:	3 Sanders Street Noosaville
Real Property Description:	Lot 250 CP 839190
Planning Scheme:	The Noosa Plan (28 October 2016)
Decision details
The following type of approval has been issued:
Development Permit for Material Change of Use of Premises - Animal Husbandry Type 2 - Intensive (Aquaculture)
Relevant period of approval
The relevant period for this development approval is 4 years starting the day that this development approval takes effect.
assessment manager conditions
PLANNING
When Conditions must be Complied With
Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to the use commencing, and then compliance maintained at all times while the use continues.
Approved Plans
Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions.
Drawing No.	Plan/Document Name	Date
0104	Hatchery Site Plan drawn by Bobbie Tomlinson	3 March 2017
Site Access and Driveways
A sealed access driveway must be provided from Sanders Street to all parking and manoeuvring areas of the development.
Car Parking
A minimum of 6 car parking spaces must be provided and marked on the site and made available and accessible at all times while the use is open for business. The works must include in particular:
5 staff parking spaces within the total, which are clearly marked for that purpose
Dimensions, crossfalls and gradients in accordance with the relevant Australian Standards (AS/NZS2890.1:2004 and AS2890.2:2002)
All vehicles must enter and exit the site in a forward gear.
All car parking areas and access driveways must be maintained exclusively for vehicle parking and manoeuvring and kept in a tidy and safe condition at all times.
Suitable signage must be provided to clearly indicate the staff spaces, customer spaces and the service vehicle area.
Service Vehicles
Service vehicle parking, manoeuvring and standing spaces must be provided on the site. The works must be generally in accordance with the approved plans.
Stormwater Drainage
Stormwater runoff from the development must be discharged to the existing stormwater drainage system.
Damage to Services and Assets
Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times:
where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or
where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval.
Amenity
The development must not create detrimental impacts on the amenity of the area due to the creation of excessive noise, odour nuisance or other emissions.
The development shall incorporate suitable mechanical ventilation, filtration systems or the like to manage the risk of ingress airborne pollutants from any surrounding industrial uses.
Landscaping
A minimum of 15% of the site must be landscaped with a species mix and density reflective of the local variant of the Regional Ecosystem. The landscaping must include a 6 metre wide landscaping strip along the Sanders Street road frontage of the subject site, exclusive of the access driveways, generally uncompromised by infrastructure items.
Environmental Health
Contaminants or contaminated water must not be directly or indirectly released from the Premises to surface water or groundwater at or outside the Premises except for:
uncontaminated overland stormwater flow; or
uncontaminated stormwater to the stormwater system.
The Operator must ensure that:
maintenance and cleaning of equipment (including, but not limited to, vehicles and plant) is carried out in an area where contaminants cannot be released into stormwater drainage, a roadside gutter, water or onto unsealed ground;
any spillage of contaminants is cleaned up immediately by a method other than hosing, sweeping or otherwise releasing the contaminants into stormwater drainage, a roadside gutter or water; and
incident rainfall and overland flow of stormwater does not contact contaminants (for example, areas with contaminants should be roofed or be protected by diversion drains).
All fish tank areas must be bunded so that the capacity of the bund is sufficient to contain at least one hundred and ten percent (110%) of the largest storage tank plus ten percent (10%) of the second largest tank within the bund
referral agencies
The referral agencies applicable to this application are:
Referral Status	Referral Agency and Address	Referral Trigger	Response

Concurrence	SARA at DSDIP Level 8 Mike Ahern Centre 12 First Avenue Email:[email protected] MAROOCHYDORE  QLD  4558	Schedule 7, Table 2, Item 28 Aquaculture	The agency provided its response on 6 June 2017 (Reference No. SDA-0317-038203).  A copy of the response is attached.

Advisory notes
The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions:
PLANNING
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Unit on 07 3247 6212 to discuss any obligations under the ACH Act.
property notes
Not Applicable
preliminary approval overriding planning scheme
Not Applicable
further development permits required
Not applicable
self assessable codes
Advertising Devices Code
submissions
Not Applicable
reasons/grounds for approval
The Assessment Manager considers the decision conflicts with the planning scheme and the following are sufficient grounds to justify the decision despite the conflict:
The aquaculture use is similar in nature to an industrial processing operation and is appropriately located within an existing industrial premise.
The development is compatible with and will not negatively impact on the existing businesses in the area.
RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Sustainable Planning Act 2009 is attached.
During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice” may be given. Taking this step will defer your appeal period, which will commence again from the start the day after you receive a “negotiated decision notice”. (Refer to Part 8 “Dealing with decision notices and approvals” - Division 1 “Changing decision notices and approvals during applicant’s appeal period” of the Sustainable Planning Act 2009.)
OTHER DETAILS
If you wish to obtain more information about Council’s decision, electronic copies are available on line at www.noosa.qld.gov.au, or at Council Offices.
Yours faithfully

Kerri Coyle
Manager, Development Assessment

cc	Unitywater

Level 8
Mike Ahern Centre
12 First Avenue
Email:[email protected]
MAROOCHYDORE  QLD  4558

Enc:	Referral Agency Response
Approved Plans/Documents
Appeal Rights

	Appeal Rights SUSTAINABLE PLANNING ACT 2009 & SUSTAINABLE PLANNING REGULATION 2009

The following is an extract from the Sustainable Planning Act 2009  (Chapter 7).
MATERIAL CHANGE OF USE, RECONFIGURING A LOT & OPERATIONAL WORKS

Division 8 	Appeals to court relating to development applications and approvals

461 	Appeals by applicants
(1) 	An applicant for a development application may appeal to the court against any of the following—
(a) 	the refusal, or the refusal in part, of the development application;
(b) 	any condition of a development approval, another matter stated in a development approval and the identification or inclusion of a code under section 242;
(c) 	the decision to give a preliminary approval when a development permit was applied for;
(d) 	the length of a period mentioned in section 341;
(e) 	a deemed refusal of the development application.
(2) 	An appeal under subsection (1)(a), (b), (c) or (d) must be started within 20 business days (the applicant’s appeal period) after—
(a) 	if a decision notice or negotiated decision notice is given—the day the decision notice or negotiated decision notice is given to the applicant; or
(b) 	otherwise—the day a decision notice was required to be given to the applicant.
(3) 	An appeal under subsection (1)(e) may be started at any time after the last day a decision on the matter should have been made.

462 	Appeals by submitters—general
(1) 	A submitter for a development application may appeal to the court only against—
(a) 	the part of the approval relating to the assessment manager’s decision about any part of the application requiring impact assessment under section 314; or
(b) 	the part of the approval relating to the assessment manager’s decision under section 327.
(2) 	To the extent an appeal may be made under subsection (1), the appeal may be against 1 or more of the following—
(a) 	the giving of a development approval;
(b) 	any provision of the approval including—
(i) 	a condition of, or lack of condition for, the approval; or
(ii) 	the length of a period mentioned in section 341 for the approval.
(3) 	However, a submitter may not appeal if the submitter—
(a) 	withdraws the submission before the application is decided; or
(b) 	has given the assessment manager a notice under section 339(1)(b)(ii).
(4) 	The appeal must be started within 20 business days (the submitter’s appeal period) after the decision notice or negotiated decision notice is given to the submitter.

463 	Additional and extended appeal rights for submitters for particular development applications
(1) 	This section applies to a development application to which chapter 9, part 7 applies.
(2) 	A submitter of a properly made submission for the application may appeal to the court about a referral agency’s response made by a prescribed concurrence agency for the application.
(3) 	However, the submitter may only appeal against a referral agency’s response to the extent it relates to—
(a) 	if the prescribed concurrence agency is the chief executive (environment)—development for an aquacultural ERA; or
(b) 	if the prescribed concurrence agency is the chief executive (fisheries)—development that is—
(i) 	a material change of use of premises for aquaculture; or
(ii) 	operational work that is the removal, damage or destruction of a marine plant.
(4) 	Despite section 462(1), the submitter may appeal against the following matters for the application even if the matters relate to code assessment—
(a) 	a decision about a matter mentioned in section 462(2) if it is a decision of the chief executive (fisheries);
(b) 	a referral agency’s response mentioned in subsection (2).

464 	Appeals by advice agency submitters
(1) 	Subsection (2) applies if an advice agency, in its response for an application, told the assessment manager to treat the response as a properly made submission.
(2) 	The advice agency may, within the limits of its jurisdiction, appeal to the court about—
(a) 	any part of the approval relating to the assessment manager’s decision about any part of the application requiring impact assessment under section 314; or
(b) 	any part of the approval relating to the assessment manager’s decision under section 327.
(3) 	The appeal must be started within 20 business days after the day the decision notice or negotiated decision notice is given to the advice agency as a submitter.
(4) 	However, if the advice agency has given the assessment manager a notice under section 339(1)(b)(ii), the advice agency may not appeal the decision.

465 	Appeals about decisions relating to extensions for approvals
(1) 	For a development approval given for a development application, a person to whom a notice is given under section 389, other than a notice for a decision under section 386(2), may appeal to the court against the decision in the notice.
(2) 	The appeal must be started within 20 business days after the day the notice of the decision is given to the person.
(3) 	Also, a person who has made a request under section 383 may appeal to the court against a deemed refusal of the request.
(4)	An appeal under subsection (3) may be started at any time after the last day the decision on the matter should have been made.

466 	Appeals about decisions relating to permissible changes
(1) 	For a development approval given for a development application, the following persons may appeal to the court against a decision on a request to make a permissible change to the approval—
(a) 	if the responsible entity for making the change is the assessment manager for the application—
(i) 	the person who made the request; or
(ii) 	an entity that gave a notice under section 373 or a pre-request response notice about the request;
(b) 	if the responsible entity for making the change is a concurrence agency for the application—the person who made the request.
(2) 	The appeal must be started within 20 business days after the day the person is given notice of the decision on the request under section 376.
(3) 	Also, a person who has made a request under section 369 may appeal to the court against a deemed refusal of the request.
(4)	An appeal under subsection (3) may be started at any time after the last day the decision on the matter should have been made.

467 	Appeals about changing or cancelling conditions imposed by assessment manager or concurrence agency
(1) 	A person to whom a notice under section 378(9)(b) giving a decision to change or cancel a condition of a development approval has been given may appeal to the court against the decision in the notice.
(2) 	The appeal must be started within 20 business days after the day the notice of the decision is given to the person.

[word/footer1.xml]
Page 4 of 7

[word/footer2.xml]
PO Box 141		P. (07) 5329 6500	[email protected]	
	TEWANTIN  QLD  4565	F. (07) 5329 6501	www.noosa.qld.gov.au
				Page 1 of 7

[word/header1.xml]
MCU17/0020

[Attachment: image3.png (image text)]
K Coy fs


[Attachment: image4.png (image text)]
 
 
 

 
 
 

a
mm

  

NOOSA
COUNCIL

Used in these records

About this file

File size
134 KB (small file)
File type
DOCX

No other editions are linked here.

Original file

Log in to download the original file

APPROVED Decision Notice MCU17_0020.docx · 134 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.