Original source · versioned page text
Swmp
Original PDF page 8, section 1. The text section number identifies this passage in the reader.
65-67 Elanda Street, Sunshine Beach
Site Based Stormwater Management Plan
_____________________________________________________________________________________________
2. Lawful Point of Discharge
In accordance with Queensland Urban Drainage Manual (QUDM 2016) section 3.4, a Lawful
Point of Discharge (LPD) must be demonstrated when proposing a development. Section
3.4.1 outlines a two-point test to assess whether a lawful point of discharge exists for a
development that consists of the following:
(i) The location of the discharge is under the lawful control of the local government
or other statutory authority from whom permission to discharge has been
received. This will include park, drainage or road reserve, stormwater drainage
easement
(ii) In discharging to that location, the discharge will not cause an actionable
nuisance (i.e. a nuisance for which the current or some future neighbouring
proprietor may bring an action or claim for damages arising out of the nuisance),
or environmental or property damage.
Currently, the site discharges stormwater naturally to the east downstream area, the
proposed LPD maintains the same discharge strategy. Surface runoff will flow towards east
of the site as sheet flow as it currently does; while the roof water will be mitigated first, and
spread by the proposed soakage trench, then discharged to the east as sheet flow.
File Name: WCD-22936 – 65-67 Elanda_SWMP.docx
Revision: A 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.