Officer: 	Georgina Schramm
Direct Telephone: 	07 53296569
Our Reference:	51993.579.01
Your Reference:	P0035895
9 February 2022
MECCA Brands
C/- Urbis Pty Ltd
Level 32, 300 George Street
BRISBANE 4000
[email protected]
Dear Sir/Madam,
Decision Notice – Minor Change
Planning Act 2016
I refer to your application received on 22 December 2021, requesting a minor change to an existing development approval. Council decided your requested changes.
Details of the decision are as follows:
APPLICATION details
Application No:	51993.579.01
Street address:	Annabelles 1/35 Hastings St Noosa Heads
Real property description:	Lot 1 BUP 102127
Planning Scheme:	Noosa Plan 2020 (25 September 2020)
Decision details
The following type of approval was issued on 23 September 1993
Development Permit for Material Change of Use of Premises – Multiple Dwelling – 3 Units & Shop
In relation to the request to make a minor change to the existing approval, Council on 7 February 2022, decided to approve the requested changes. The changes are detailed below.
Approve the change
Amend conditions 1 and 7
Include additional conditions 24 – 30
Include Advisory Notes
currency period of approval
Not Applicable

assessment manager conditions
TPC 2559 (attached)
Approved Plans
Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions.
Plan No.	Rev.	Plan/Document Name	Date
185192-30	-	Plans prepared by John Dimitriou Architects	23 June 1993
185192-31	-	Plans prepared by John Dimitriou Architects	23 June 1993
185192-32	-	Sections prepared by John Dimitriou Architects	23 June 1993
185192-33	-	Elevations prepared by John Dimitriou Architects	23 June 1993
DA 101	2	Site Plan NTS prepared by Meacham Nockles	24 January 2022
DA 102	-	Perspective View prepared by Meacham Nockles	20 December 2021
DA 103	2	Materials and Images for Shopfront prepared by Meacham Nockles	24 January 2022
DA 304	-	South Elevation – Hastings St elevation prepared by Meacham Nockles	20 December 2020
DA 305	-	East Elevation prepared by Meacham Nockles	20 December 2021
Extract of no. DA304	-	Planting List prepared by applicant	20 December 2021
-	-	Pot Information prepared by applicant	Received on 24 January 2021
The Hastings Street open space and setback area is to be landscaped in accordance with Plan DA102 dated 20 December 2021 and Extract of Plan No. DA304 dated 20 December 2021.
The open space and setback areas of the northern property boundary (boardwalk setback) are to be landscaped in accordance with Council’s Policy on Landscaping Guidelines and a properly prepared landscape plan to be submitted to and approved by the Shire Planner, prior to the issue of a Building Approval. Such landscaping is to be completed in accordance with the approved landscape plan, prior to the premises being occupied and maintained at all times thereafter to the reasonable satisfaction of the Shire Planner.
The submitted landscaped landscape plan by Neil Thyer, Landscape Architect, dated June, 1993 and numbered AHSNSK2B is not approved. An amended plan is to be submitted with the following alterations:-
Deleted
Existing Cocos palms on the site are not be retained.
A minimum average setback of one metre shall be provided to any fencing to be installed along the northern frontage. Plan B submitted under covering letter of 13th June 1994, by Noosa Town Planning Pty Ltd, conforms with this condition.
Deleted
Landscaping to be undertaken been the Council boardwalk in the Parade and the northern boundary of the site.
Deleted
ADDITIONAL CONDITIONS – 7 FEBRUARY 2022
A condition report including photographs of the frontage of the site must be completed and submitted to Council prior to the prestart meeting.
A prestart meeting must be organised with Council’s delegate by calling 5329 6500 (giving at least five business days’ notice). The prestart meeting must be attended by the responsible persons for:
Landscape works.
Other relevant parties.
DURING CONSTRUCTION
General
Where damage occurs to any Council asset as a result of the development works, it must be repaired immediately where it creates a hazard that presents risk to person or property. Other damage must be repaired prior to completion of works.
All works must be constructed and work procedure undertaken in accordance with:
The approved plans/documents and conditions detailed in this Decision Notice.
The relevant conditions of the higher order Material Change of Use approval viz. 51993.579.01 to which this approval relates.
All relevant Council Planning Scheme Policies, standard drawings, standard specifications and guidelines.
The latest version of Water Sensitive Urban Design Technical Design Guidelines for South East Queensland (Healthy Waterways) for all water quality devices to be constructed on site.
Landscape works must be supervised, undertaken and certified by qualified persons*.  All works must be completed in accordance with this Decision Notice.
(* Refer to Advisory Note)
Landscape works must:
Ensure amenity or sales signage and ancillary infrastructure is not installed within the road reserve.
Ensure permanent irrigation is not installed within the road reserve.
Ensure mulch is aged, comprised of leaf and limb material of varying sizes, free of foreign matter including anthropogenic waste, rock, soil/sediment contamination and is applied to all planting areas to ensure a minimum 100mm depth once settled.
Ensure no Bogainvillea, Trachelospermum jasminodies or Pandanus plants are included within the development.
*(Refer to Advisory Notes)

FOLLOWING CONSTRUCTION
Supervision/Certification
Prior to commencement of use the following (prepared by respective qualified persons* and certifying compliance with approvals) must be submitted to Council:
Landscaping certification confirming all works have been constructed in accordance with conditions of approval.
NATSPEC certification (Specifying Trees: a guide to assessment of tree quality addressing each specimen).
referral agencies
Not Applicable
advisory notes
NEW ADVISORY NOTES – 7 FEBRUARY 2022
Advertising Devices
All Advertising Devices must comply with Schedule 10 of Subordinate Local Law No.1 (Administration) 2015 including both temporary and permanent signage. All freestanding, pylon or pole signs or signage that is illuminated requires approval from Council prior to being installed. All signage identified in s6 of Schedule 10 of Subordinate Local Law No. 1 is prohibited from being erected in the Shire.
Prestart, On and Off Maintenance, Rehabilitation Inspections Request
Contact Council on 5329 6500 to arrange a prestart meeting or an inspection giving a minimum of five business days’ notice of preferred inspection time.
Retention of Existing Trees
The existing trees on adjoining properties must be retained and protected during construction wherever achievable. To avoid doubt, this advisory note is not intended to exclude the operation of Chapter 3 of the Neighbourhood Dispute Resolution Act 2011 following construction of the development which is the subject of this development approval.
Qualified Person
Qualified Person, for the purpose of:
a.	Supervising landscape works and preparing a landscape certification, is considered to be a landscape architect, landscape designer or horticulturist with a minimum of three years current experience in the field of landscape design.
Landscape Works
The applicant must pay the re-inspection fee in accordance with Council's Fees and Charges Register where:
a.	An inspection revealed that any constructed rehabilitation/landscape works do not comply with the conditions of the Decision Notice, Approved Plans and or Approved Documents
b.	Certification is submitted to Council falsely stating that works comply with the approved plans, documents and or conditions of the Decision Notice.
Infrastructure Charges
All developments and/or changes to existing developments may require payment of “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution” made pursuant to the planning legislation and regulations current at the time of issue.
property notes
Not Applicable
variation approval details
Not Applicable
further development permits required
Type of Development Permit Required	Subject of the required Development Permit
Development Permit for Building Works	All building work.
submissions
Not Applicable
rights of appeal
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached.
During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given.
other details
If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices.
Yours faithfully

Georgina Schramm
Development Planner

Enc:	Appeal Rights
Approved Plans/Documents
DECISION NOTICE HISTORY
Original Decision Notice - 23 September 1993
Decision Notice - Minor – 14 July 1994, with an amendment to conditions 7c
Decision Notice – Minor – 51993.579.01 – 7 February 2022; with an amendment to conditions 1 & 7; additional conditions 24 – 30 and new Advisory Notes

	Appeal Rights PLANNING ACT 2016 & PLANNING REGULATION 2017

Chapter 6 Dispute resolution
Part 1 Appeal rights
229 Appeals to tribunal or P&E Court
(1)	Schedule 1 of the Planning Act 2016 states –
(a)	Matters that may be appealed to –
(i)	either a tribunal or the P&E Court; or
(ii)	only a tribunal; or
(iii)	only the P&E Court; and
(b)	The person-
(i)	who may appeal a matter (the appellant); and
(ii)	who is a respondent in an appeal of the matter; and
(iii)	who is a co-respondent in an appeal of the matter; and
(iv)	who may elect to be a co-respondent in an appeal of the matter.
(2)	An appellant may start an appeal within the appeal period.
(3)	The appeal period is –
(a)	for an appeal by a building advisory agency – 10 business days after a decision notice for the decision is given to the agency; or
(b)	for an appeal against a deemed refusal – at any time after the deemed refusal happens; or
(c)	for an appeal against a decision of the Minister, under chapter 7, part 4, to register premises or to renew the registration of premises – 20 business days after a notice us published under section 269(3)(a) or (4); or
(d)	for an appeal against an infrastructure charges notice – 20 business days after the infrastructure charges notice is given to the person; or
(e)	for an appeal about a deemed approval of a development application for which a decision notice has not been given – 30 business days after the applicant gives the deemed approval notice to the assessment manager; or
(f)	for any other appeal – 20 business days after a notice of the decision for the matter, including an enforcement notice, is given to the person.
Note –
See the P&E Court Act for the court’s power to extend the appeal period.
(4)	Each respondent and co-respondent for an appeal may be heard in the appeal.
(5)	If an appeal is only about a referral agency’s response, the assessment manager may apply to the tribunal or P&E Court to withdraw from the appeal.
(6)	To remove any doubt. It is declared that an appeal against an infrastructure charges notice must not be about-
(a)	the adopted charge itself; or
(b)	for a decision about an offset or refund-
(i)	the establishment cost of trunk infrastructure identified in a LGIP; or
(ii)	the cost of infrastructure decided using the method included in the local government’s charges resolution.
230 Notice of appeal
(1)	An appellant starts an appeal by lodging, with the registrar of the tribunal or P&E Court, a notice of appeal that-
(a)	is in the approved form; and
(b)	succinctly states the grounds of the appeal.
(2)	The notice of appeal must be accompanied by the required fee.
(3)	The appellant or, for an appeal to a tribunal, the registrar must, within the service period, give a copy of the notice of appeal to –
(a)	the respondent for the appeal; and
(b)	each co-respondent for the appeal; and
(c)	for an appeal about a development application under schedule 1, table 1, item 1 – each principal submitter for the development application; and
(d)	for and appeal about a change application under schedule 1, table 1, item 2 – each principal submitter for the change application; and
(e)	each person who may elect to become a co-respondent for the appeal, other than an eligible submitter who is not a principal submitter in an appeal under paragraph (c) or (d); and
(f)	for an appeal to the P&E Court – the chief executive; and
(g)	for an appeal to a tribunal under another Act – any other person who the registrar considers appropriate.
(4)	The service period is –
(a)	if a submitter or advice agency started the appeal in the P&E Court – 2 business days after the appeal has started; or
(b)	otherwise – 10 business days after the appeal is started.
(5)	A notice of appeal given to a person who may elect to be a co-respondent must state the effect of subsection (6).
(6)	A person elects to be a co-respondent by filing a notice of election, in the approved form, within 10 business days after the notice of appeal is given to the person.
231 Other appeals
(1)	Subject to this chapter, schedule 1 and the P&E Court Act, unless the Supreme Court decides a decision or other matter under this Act is affected by jurisdictional error, the decision or matter is non-appealable.
(2)	The Judicial Review Act 1991, part 5 applies to the decision or matter to the extent it is affected by jurisdictional error.
(3)	A person who, but for subsection (1) could have made an application under the Judicial Review Act 1991 in relation to the decision or matter, may apply under part 4 of that Act for a statement of reasons in relation to the decision or matter.
(4)	In this section –
decision includes-
(a)	conduct engaged in for the purpose of making a decision; and
(b)	other conduct that relates to the making of a decision; and
(c)	the making of a decision or failure to make a decision; and
(d)	a purported decision; and
(e)	a deemed refusal.
non-appealable, for a decision or matter, means the decision or matter-
(a)	is final and conclusive; and
(b)	may not be challenged, appealed against, reviewed, quashed, set aside or called into question in any other way under the Judicial Review Act 1991 or otherwise, whether by the Supreme Court, another court, a tribunal or another entity; and
(c)	is not subject to any declaratory, injunctive or other order of the Supreme Court, another court, a tribunal or another entity on any ground.
232 Rules of the P&E Court
(1)	A person who is appealing to the P&E Court must comply with the rules of the court that apply to the appeal.
(2)	However, the P&E Court may hear and decide an appeal even if the person has not complied with the rules of the P&E Court

[word/footer2.xml]
Page 2 of 6

[word/footer3.xml]
PO Box 141		P. (07) 5329 6500	[email protected]	
	TEWANTIN  QLD  4565	F. (07) 5329 6501	www.noosa.qld.gov.au
				Page 1 of 6

[word/footer4.xml]
Page 2 of 3

[word/header4.xml]
3

[Attachment: image3.png (image text)]
ee) NOOSA COUNCIL
Log in to download the original file

Minor Change Existing Approval 51993.579.01.docx · 380 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.