Skip to the record
Every meeting, every word.

Original source · versioned page text

Bushfire Report

Attached to the e-mail MCU16/0081 Bushfire report, Survey, Ecological Assessment Report Email 2 of 3.

of 107

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 99, section 1. The text section number identifies this passage in the reader.

STEP 2. DETERMINE WHAT APPROVALS ARE REQUIRED
FOR CONSTRUCTING YOUR APZ
If you intend to undertake bush fire hazard reduction works to create or maintain an
APZ you must gain the written consent of the landowner.

Subdivided land or construction of a new dwelling
If you are constructing an APZ for a new dwelling you will need to comply with the
requirements in Planning for Bushfire Protection. Any approvals required will have to
be obtained as part of the Development Application process.

Existing asset
If you wish to create or maintain an APZ for an existing structure you may need to
obtain an environmental approval. The RFS offers a free environmental assessment
and certificate issuing service for essential hazard reduction works. For more
information see the RFS document Application Instructions for a Bush Fire Hazard
Reduction Certificate or contact your local RFS Fire Control Centre to determine if
you can use this approval process.

Bear in mind that all work undertaken must be consistent with any existing land
management agreements (e.g. a conservation agreement, or property
vegetation plan) entered into by the property owner.

If your current development consent provides for an APZ, you do not need further
approvals for works that are consistent with this consent.

If you intend to burn off to reduce fuel levels on your property you may also need to
obtain a Fire Permit through the RFS or NSW Fire Brigades. See the RFS document
Before You Light That Fire for an explanation of when a permit is required.

STEP 3. DETERMINE THE APZ WIDTH
The size of the APZ required around your asset depends on the nature of the asset,
the slope of the area, the type and structure of nearby vegetation and whether the
vegetation is managed.

Fires burn faster uphill than downhill, so the APZ will need to be larger if the hazard   5
is downslope of the asset.
Log in to download the original file

Bushfire Report.pdf · 5.7 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.