Original source · versioned page text
Bushfire Report
Attached to the e-mail MCU16/0081 Bushfire report, Survey, Ecological Assessment Report Email 2 of 3.
Original PDF page 99, section 1. The text section number identifies this passage in the reader.
STEP 2. DETERMINE WHAT APPROVALS ARE REQUIRED FOR CONSTRUCTING YOUR APZ If you intend to undertake bush fire hazard reduction works to create or maintain an APZ you must gain the written consent of the landowner. Subdivided land or construction of a new dwelling If you are constructing an APZ for a new dwelling you will need to comply with the requirements in Planning for Bushfire Protection. Any approvals required will have to be obtained as part of the Development Application process. Existing asset If you wish to create or maintain an APZ for an existing structure you may need to obtain an environmental approval. The RFS offers a free environmental assessment and certificate issuing service for essential hazard reduction works. For more information see the RFS document Application Instructions for a Bush Fire Hazard Reduction Certificate or contact your local RFS Fire Control Centre to determine if you can use this approval process. Bear in mind that all work undertaken must be consistent with any existing land management agreements (e.g. a conservation agreement, or property vegetation plan) entered into by the property owner. If your current development consent provides for an APZ, you do not need further approvals for works that are consistent with this consent. If you intend to burn off to reduce fuel levels on your property you may also need to obtain a Fire Permit through the RFS or NSW Fire Brigades. See the RFS document Before You Light That Fire for an explanation of when a permit is required. STEP 3. DETERMINE THE APZ WIDTH The size of the APZ required around your asset depends on the nature of the asset, the slope of the area, the type and structure of nearby vegetation and whether the vegetation is managed. Fires burn faster uphill than downhill, so the APZ will need to be larger if the hazard 5 is downslope of the asset.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.