2022-05-16 GC Agenda - Item 7 - Attachment 2 - Noosa Oyster Ecosystem Restoration Project - Project Restoration Plan

of 75

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                             General Committee Agenda 16 May 2022
                                                             Attachment 2 to Item 7


                                       Noosa Oyster Ecosystem Restoration Project

                                                  Project Restoration Plan

                 In support of application for development approval from government authorities
                        for oyster ecosystem restoration works in the Noosa River estuary


                                                                 January 2022




                                         Photo: Craig Bohm




                                                                                               1




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022
Log in to download the original file

2022-05-16 GC Agenda - Item 7 - Attachment 2 - Noosa Oyster Ecosystem Restoration Project - Project Restoration Plan(PDF, 7MB).pdf · 7.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 74 sections

Section 2

                 Contents
                 SECTION 1 – CONTEXT ............................................................................................................................ 5
                    1.1 Purpose ......................................................................................................................................... 5
                    1.2 Objective ....................................................................................................................................... 5
                    1.3 Rationale ....................................................................................................................................... 5
                    1.4 Restoration approach ................................................................................................................... 8
                    1.5 Timeline......................................................................................................................................... 9
                    1.6 Governance ................................................................................................................................. 10
                    1.7 Past actions ................................................................................................................................. 12
                    1.8 Definitions ................................................................................................................................... 13
                    1.9 Summary of restoration targets.................................................................................................. 14
                    1.10 Qualifications ............................................................................................................................ 14
                    1.11 Guarantees ................................................................................................................................ 15
                 SECTION 2 – RESTORATION MODELS.................................................................................................... 16
                    2.1 Habitat suitability ........................................................................................................................ 16
                    2.3 Restoration suitability ................................................................................................................. 18
                    2.4 Habitat mapping ......................................................................................................................... 21
                 SECTION 3 – RESTORATION SITES ......................................................................................................... 22
                    3.1 Tewantin ..................................................................................................................................... 23
                    3.2 Goat Island .................................................................................................................................. 29
                    3.3 Noosa Sound East ....................................................................................................................... 33
                    3.4 Noosa Sound West ...................................................................................................................... 35
                    3.5 Public land ................................................................................................................................... 38
                 SECTION 4 - PUBLIC CONSULTATIONS AND ENGAGEMENT ................................................................. 39
                    4.1 Face-to-face meetings................................................................................................................. 39
                    4.2 Community engagement workshop............................................................................................ 39
                    4.3 Public consultation sessions ....................................................................................................... 39
                    4.4 Recreational fisher engagement ................................................................................................. 40
                    4.5 Commercial fisher engagement .................................................................................................. 40
                    4.6 Riverside homeowners ............................................................................................................... 41
                    4.7 Additional communications ........................................................................................................ 42
                    4.8 Project-based engagement actions ............................................................................................ 42
                 SECTION 5 – RESTORATION SUBSTRATE ............................................................................................... 43
                    5.1 Rock substrate............................................................................................................................. 43
                    5.2 Substrate augmentation ............................................................................................................. 44
                                                                                                                                                              2




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 3

                    5.3 Shell recycling.............................................................................................................................. 45
                    5.5 Composite substrate ................................................................................................................... 47
                    5.5 Oyster cultch ............................................................................................................................... 48
                    5.6 Hatchery ...................................................................................................................................... 48
                    5.7 Oyster gardening......................................................................................................................... 48
                 SECTION 6 – CONSTRUCTION................................................................................................................ 52
                    6.1 Methodology............................................................................................................................... 52
                    6.2 Responsibilities ........................................................................................................................... 53
                    6.3 Impact Minimisation ................................................................................................................... 54
                    6.4 Sediment management............................................................................................................... 56
                 SECTION 7 – SIGNAGE + AIDS TO NAVIGATION .................................................................................... 60
                 SECTION 8 – PERFORMANCE MEASURES.............................................................................................. 66
                    8.1 Public Safety ................................................................................................................................ 66
                    8.2 Visual amenity ............................................................................................................................. 67
                    8.3 Environmental performance and safeguards ............................................................................. 68
                    8.4 Erosion control ............................................................................................................................ 71
                    8.5 Complaints management ............................................................................................................ 72
                    8.6 Contingency plan ........................................................................................................................ 73
                 SECTION 9 - ANNEXES ........................................................................................................................... 75
                    Annex 1 - Noosa River Habitat Survey Report - ESP ......................................................................... 75
                    Annex 2 - Noosa River MSES Map - Tewantin & Goat Island ............................................................ 75
                    Annex 3 - Noosa River Environ Values & Water Quality Map .......................................................... 75
                    Annex 4 - Noosa River Fish Habitat Area .......................................................................................... 75
                    Annex 5 - Community Engagement Workshop Report ..................................................................... 75
                    Annex 6 - Public Information Sessions Report .................................................................................. 75
                    Annex 7 - Engineering Specifications ................................................................................................ 75
                    Annex 8 - Safety in Design Report..................................................................................................... 75
                    Annex 9 - Code 7 - Maritime Safety .................................................................................................. 75
                    Annex 10 - Code 8 - Coastal Development & Tidal Works ................................................................ 75
                    Annex 11 - Code 11 - Marine Plants.................................................................................................. 75
                    Annex 12 - Code 12 - Declared fish habitat area .............................................................................. 75
                    Annex 13 - Schedule 3 - Prescribed Tidal Works............................................................................... 75
                    Annex 14 - Engineering Drawings NROR-2021 ................................................................................. 75




                                                                                                                                                                        3




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 4

4




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

TheNature Ge
                                                                                                                   Conservancy      P
                                                                                                                           Australia

                                                                                                                                    4

Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 5

                 SECTION 1 – CONTEXT
                 1.1 Purpose

                 The purpose of the restoration work is to restore rock oyster ecosystems to the Noosa River estuary
                 and therewith the ecology services and benefits to fish habitats and fisheries resources they provided.

                 1.2 Objective

                 Restoration of oyster beds in the Noosa River estuary at locations that historic records, assessments
                 of shell middens and sediments and assessment of a high potential for restoration success indicate.

                 1.3 Rationale

                 Rock oysters (Saccostrea spp.) are natural and historic residents of the Noosa River. Rock oysters
                 colonise natural hard substrates (e.g. gravel, rock, tree roots) and create three dimensional, rugose,
                 and heterogeneous structures, which are subsequently colonised by successive generations of oysters
                 as well as an array of aquatic flora and fauna.

                 Rock oyster ecosystems are important ecological system and high value fish habitats that have been
                 lost from the Noosa River estuary and which this project aims to restore.

                 Historic occurrence

                 The estuarine environment of the Noosa River was once dominated with extensive rock oyster
                 ecosystems. Oyster ecosystems were largely lost however, in the late 1800s to early 1900s. At the peak
                 of the wild oyster harvest industry (1906-1907), it is estimated that 2-3 million oysters were harvested
                 in the lower estuary each year1.

                 The commercial oyster industry in the Noosa River commenced in the 1870’s or 1880s, and ceased,
                 having become economically unviable, by the 1940’s. Oyster lease areas were dredged intensively for
                 oysters in the early 1900’s, resulting in the removal of live oyster beds and the underlying bedrock.

                 From 1934, oystering locations were recorded by local fisheries officials, and defined by the extent of
                 the oyster lease areas allocated by the government for commercial exploitation3. These leases
                 (presented in Figure 1.1) indicate the most probable historical range of extensive oyster beds (intertidal
                 and sub-tidal) within the Noosa River estuary.




                 1
                  Thurston R. 2015. Historical ecology of the Noosa Estuary fisheries. Report to: Noosa Council, The Nature Conservancy and The Thomas
                 Foundation (available on request from TNC).


                                                                                                                                                         5




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 6

                 .




                 Figure 1.1: Historic commercial oyster leases in the Noosa River Estuary. Hand-drawn chart from
                 1934, made by the Fisheries Inspector to highlight the areas in the Noosa River closed to net fishing.
                 The red numbers indicate the locations of all known Noosa oyster sections. Source: Queensland State
                 Archives.

                 Historic records also show extensive shell middens present at Tewantin, Noosaville and Hays Island
                 (now Noosa Sound), and that substantial oyster beds occurred in Lake Weyba1. Noosa residents once
                 collected oysters from rock outcrops in Lake Weyba (Figure 1.2), and the extent of oysters in the lake
                 is thought to have been extensive1, possibly growing on low gravel beds and other hard structures that
                 today are buried under sediment (Simon Walker, ESP, pers com).




                                                                                                                      6




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 7

                 Figure 1.2: Lake Weyba Oyster Collecting circa 1914. Source: Sunshinecoast.spydus.com



                 Of note is the that due to the conversion of Hays Island into the Noosa Sound canal estate in the 1960s,
                 evidence of oyster beds from this area has been lost. Oysters persist though on rocks, gravel and pylons
                 along the southern fringes of Noosa Sound, indicating that oyster spat still settle and grow in the area.
                 The potential for restoration of oysters in the Noosa Sound therefore remains possible (TNC shellfish
                 ecologist, Boze Hancock, pers com).

                 In 2016, Ecological Service Professionals (ESP) quantified the historic spatial extent of oyster beds in the
                 Noosa River and concluded that it was likely to have been in the range of 41,530m2 to 207,650 m2, of
                 which approximately 16,850m2 of old oyster beds and oyster rubble remain buried by sediment in the
                 historical oyster lease areas2.

                 The loss of oyster biomass likely resulted in the ecosystem collapsing, with shellfish ecosystems now
                 replaced primarily by soft (sandy and muddy) sediments. Changes to the estuary’s physical-chemical
                 condition, canal development and shoreline armouring have also likely contributed to the decline of
                 the ecosystem or inhibited its natural recovery.

                 Today, no extant rock oyster ecosystems exist in the Noosa River estuary, despite the presence of
                 individual and small populations of rock oysters. The closest known intact oyster-dominated shellfish
                 ecosystem is found near North Stradbroke Island in Morton Bay. Notably, a recent study3 identified that
                 rock oyster dominated shellfish ecosystems are the most threatened marine ecosystem in Australia,
                 with up to 94 percent of the ecosystem lost throughout Australia since European settlement.




                 2
                   Walker, S. 2016. Assessment of Oyster Habitat in Noosa River Estuary. Report to Noosa Shire Council by Ecological Service Professionals
                 (ESP). October 2016.

                 3
                   Gillies et al. 2018. Australian Shellfish Ecosystems: past distribution, current status and future management. PLoS ONE 13(2):e0190914.
                 https://doi.org/10.1371/journal.pone.0190914

                                                                                                                                                             7




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 8

                 The works proposed in this submission are intended to restore 3,600m2 of oyster beds in phase 1 of
                 the project. That equates to between 1.7 and 9 percent of the original area expected to have been
                 covered by oyster beds in the Noosa River estuary.

                 Restoration Benefits

                 The benefits of restoring rock oyster ecosystems to the Noosa River estuary are extensive. Oysters are
                 ecosystem engineer species capable of improving ecosystem function and providing habitat for other
                 organisms4. Oyster ecosystems added extensive ‘natural infrastructure’ to the estuary and provided the
                 estuary with a range of environmental benefits.

                 These benefits include:
                    • Providing complex habitats for marine species (the diverse habitats typically consist of fish,
                        invertebrates, corals, ascidians, lace corals, encrusting sponges and algae).
                    • Filtering water and removing suspended sediment and pollution.
                    • Processing nutrients; providing bank stabilization and protection.
                    • Providing complex vertical and horizontal living spaces, and feeding grounds, for a multitude of
                        intertidal and marine creatures.
                    • Enhancing marine and coastal lifestyle and tourism activities such as fishing, diving and bird
                        watching.

                 The recognition of the significant contribution of oyster ecosystems led to their recognition as an
                 important wetland habitat type in the Convention on Wetlands of International Importance (The
                 Ramsar Convention – habitat type ‘Ga’)5.

                 1.4 Restoration approach

                 The restoration approach follows the eight principles for ecological restoration established by the
                 international Society of Ecological Restoration (SER)6, which have been newly interpreted for shellfish
                 restoration7. The project approach is also guided by best-practice ecological restoration and shellfish
                 restoration monitoring guidelines, including the Open Standards for the Practice of Conservation8, the




                 4
                   Jonathan H. Grabowski, Robert D. Brumbaugh, Robert F. Conrad, Andrew G. Keeler, James J. Opaluch, Charles H. Peterson, Michael F.
                 Piehler, Sean P. Powers, Ashley R. Smyth, Economic Valuation of Ecosystem Services Provided by Oyster Reefs, BioScience, Volume 62, Issue
                 10, October 2012, Pages 900–909, https://doi.org/10.1525/bio.2012.62.10.10

                 5
                   Kasoar, T., zu Ermgassen, P.S.E., Carranza, A., Hancock, B., Spalding, M., 2015. New opportunities for conservation of a threatened
                 biogenic habitat: a worldwide assessment of knowledge on bivalve-reef representation in marine and coastal Ramsar Sites. Mar. Freshw.
                 Res. 66, 981e988.

                 6
                  Gann GD, McDonald T, Walder B, Aronson J, Nelson CR, Jonson J, Hallett JG, Eisenberg C, Guariguata MR, Liu J, Hua F, Echeverría C,
                 Gonzales E, Shaw N, Decleer K, Dixon KW (2019) International principles and standards for the practice of ecological restoration. Second
                 edition. Restoration Ecology 27(S1): S1–S46

                 7
                  Fitzsimons, J., Branigan, S., Brumbaugh, R.D., McDonald, T. and zu Ermgassen, P.S.E. (eds) (2019). Restoration Guidelines for Shellfish
                 Reefs. The Nature Conservancy, Arlington VA, USA.

                 8
                  Conservation Measures Partnership (2013) Open Standards for the Practice of Conservation Version 3.0, accessed online via http://cmp-
                 openstandards.org/wp-content/uploads/2014/03/CMP-OS-V3-0-Final.pdf
                                                                                                                                                            8




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 9

                 Society for Ecological Restoration International Standards6 and TNC’s Oyster Habitat Restoration
                 Monitoring and Assessment Handbook9.

                 The definition of ecological restoration applied is the process of assisting the recovery of an ecosystem
                 that has been degraded, damaged, or destroyed. The process involves moving a destroyed or degraded
                 ecosystem along a measurable trajectory of recovery that is persistent in the future and reflective of a
                 natural evolutionary path.

                 Importantly, ecological restoration, as applied in this project, differs from artificial reefs, in that their
                 purpose is to restore oyster ecosystems in areas where they once existed, or are currently degraded,
                 rather than introducing artificial substrates (e.g. concrete reef balls).

                 This project responds to the loss of natural hard substrates in the Noosa River by re-introducing locally
                 sourced rock in configurations that rock oysters and associated species (e.g. pearl oysters, leaf oysters,
                 hairy mussels, tunicates and macroalgae) readily colonise. The design and placement of the rock
                 substrate considers historic location of oyster beds plus physical features, such as aspect, height,
                 dimensions and rugosity in a way that can help mitigate physical and biological threats to the recovering
                 ecosystem such as smothering, heat, erosion, predation and human disturbance.

                 To some of the rock substrate, the project adds relatively small volumes of desiccated (cured) oyster
                 shell to create a composite base of rock and shell. The combination of rock and shell mimics the shell
                 ‘hash’ that would otherwise be formed by generations of oysters recruiting onto themselves, but which
                 has since been lost from the estuary.

                 Rock substrates are also hand-seeded with oyster shell (cultch) seeded with oyster spat, and/or live
                 oysters. Seeding of the substrate with live oysters ensures the target density of oysters is achieved,
                 effectively ‘kick starting’ and accelerating the restoration process. Augmentation also acts as an
                 insurance policy against low natural oyster recruitment onto the restoration substrate. Brood stock for
                 oyster seeding is collected from the Noosa River. The seeding process is undertaken in a bio-secure
                 facility in close liaison with government biosecurity officers.

                 Restoration targets for oysters are presented in Section 8.3 Environmental Safeguards. Table 8.3.

                 1.5 Timeline

                 Phase I Pilot Phase – 2021-2023

                 Phase I works involve deploying oyster bed restoration substrates, i.e. rock (augmented with small
                 volumes of oyster shell and seeded oyster ‘cultch’), in the following restoration sites:

                      1.   Tewantin
                      2.   Goat Island
                      3.   Noosa Sound East
                      4.   Noosa Sound West




                 9
                  Baggett LP, Powers SP, Brumbaugh R, Coen LD, DeAngelis B, Greene J, Hancock B and Morlock S (2014). Oyster habitat restoration
                 monitoring and assessment handbook. The Nature Conservancy, Arlington, VA, USA. 96 pp.
                                                                                                                                                   9




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 10

                 Construction works (deployment of the restoration substrates) is planned between October and April
                 (2021-2023), subject to permitting. This timeframe takes advantage of natural oyster spawning and
                 recruitment in the Noosa River during this period.

                 Phase I restoration sites are presented in the plans, and have already been subject to:

                     a.   Detailed bathymetric mapping
                     b.   Detailed habitat mapping
                     c.   River user analysis
                     d.   Habitat suitability modelling
                     e.   Restoration suitability modelling
                     f.   Community consultation
                     g.   Detailed site engineering

                 Phase II –2022 to 2024

                 Phase II works will take place the following spring through autumn period (2022-2023), and if
                 resources allow the following spring through autumn (2023-2024). Specific sites for this work have yet
                 to be identified, and authorities will be approached separately to approve plans for Phase II works,
                 possibly as an addendum of some form to this restoration plan approval.

                 In Phase II, works will entail:

                     •    Augmenting restoration sites 1-4 from Phase I with additional restoration substrate, as
                          required; and,
                     •    Identifying new restoration sites in Restoration Zones 1 to 5 and deploying restoration
                          substrates into those sites in accordance with the restoration processes outlined in this
                          submission.

                 For phase II works, the process includes:

                    I.    Identifying additional restoration sites using the restoration suitability model and stakeholder
                          discussions
                   II.    Checking, and, if necessary, remapping habitats at the new proposed sites
                  III.    Consulting publicly on the additional proposed restoration sites
                  IV.     Undertaking detailed bathymetric mapping
                   V.     Applying existing engineering and design criteria and mapping restoration substrates onto the
                          sites
                  VI.     Submitting updated restoration plans to agencies
                 VII.     Undertaking construction works
                 VIII.    Applying site demarcation and management measures to the new sites
                  IX.     Submitting ‘as built’ maps of new substrates to authorities

                 1.6 Governance

                 The Noosa Oyster Ecosystem Restoration Project is a partnership between The Nature Conservancy
                 (TNC) and Noosa Shire Council (NSC) formed to deliver oyster ecosystem restoration in the Noosa River.

                 The Project is framed by a formal partnership agreement between TNC and NSC. This partnership is
                 specified in the Alliance and Funding Agreement, which came into effect on 25 th July 2019. The
                 agreement is effective for three years and two months and the project is scheduled to be completed
                                                                                                                       10




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 11

                 by 30th September 2022. The terms of the partnership will be reviewed prior to July 2022. Funds for
                 this project are provided by Noosa Shire Council (NSC), TNC, The Thomas Foundation (TTF) and
                 Australian Marine Conservation Society (AMCS).

                 In September 2020, Noosa Shire Council formally endorsed the Project Management Plan for this
                 project. The plan presents the project measures, general construction methodologies, risk assessment
                 and broad monitoring, evaluation and reporting plan. This Project Restoration Plan operationalises the
                 project management plan.

                 The project is led by TNC.

                 The Project is overseen by an executive level forum comprising two key Contact Officers, those being
                 the Lead Scientist (TNC) and Director of Environment & Sustainable Development (NSC). The
                 governance of the activities for the project are the responsibility of the Executives of TNC and NSC, or
                 their nominated delegate/s and day-to-day operations the responsibility of TNC and its appointed
                 Project Manager for that purpose.

                 The TNC-contracted Project Manager is supported by the Noosa Technical Advisory Group (TAG). The
                 TAG’s purpose is to:

                     •    Support detailed project planning for the Noosa Oyster Reef Restoration Project that will see
                          reefs re-established in the Noosa River estuary by June 2022.
                     •    Provide ongoing expert advice on the implementation of the Project Plan, and support in
                          overcoming legislative, scientific and practical barriers that occur during the term of the
                          project.
                     •    Ensure that the Project meets all technical, statutory and policy requirements in a timely
                          manner to the satisfaction of relevant decision-making authorities.
                     •    Ensure actions within the Project Plan are effectively delivered and communicated to all
                          stakeholders.

                 The composition of the Noosa TAG is:

                     •    Department of Agriculture & Fisheries (3) – aquaculture, marine plants and biosecurity experts
                     •    Maritime Safety Queensland (1) – Regional Manager
                     •    Kabi Kabi Traditional Owner (1) – For technical expertise
                     •    Independent aquatic ecologist/biologist (1) – With in depth ecological knowledge of the Noosa
                          River estuary (from Ecological Service Professionals Pty Ltd).
                     •    Noosa Shire Council (1) – Environmental Services Manager
                     •    The Nature Conservancy (3) – Oceans Operations Manager + Oceans Restoration Scientist +
                          QLD Oceans Coordinator (Chair)

                 The Noosa TAG held its inaugural meeting on the 15th May 2020. TAG meetings are held on a semi-
                 regular basis, as required to drive the project forward. Specialised work is often undertaken out of
                 session including providing advice to TNC QLD Oceans Coordinator on all aspects project
                 implementation.




                                                                                                                      11




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 12

                 1.7 Past actions

                 In recent years, TNC, NSC, TTF and a range of local stakeholders have worked together to build a deeper
                 understanding of the environmental significance and long-term sustainable management options for
                 the Noosa River. The key actions that lead to the formation of the Noosa Oyster Ecosystem Restoration
                 Project are summarised below.

                 Noosa River Expert Workshop, Powerhouse Museum, 2014

                 A two-day workshop, hosted by TNC on behalf of TTF and Noosa Parks Association (NPA), comprising
                 12 academic and NGO estuary scientists. The workshop identified 14 conservation activities that could
                 lead to a healthier Noosa River, with oyster reef restoration listed as a priority action in addition to
                 prawn restocking and sediment management in Kin Kin in the upper Noosa River catchment. These
                 activities (including further scoping studies) were later jointly funded by NSC, Noosa Parks Association,
                 The Thomas Foundation and the Noosa Biosphere Reserve Foundation.

                 TNC Oyster Restoration Scoping Study, 2015

                 TNC and Ecological Service Professionals Pty on behalf of NSC and others undertook a short, five-month
                 ecological assessment to quantify oyster densities across 11 intertidal and subtidal sites within the
                 estuary. The study confirmed high densities of oyster recruitment particularly around Weyba Creek, the
                 main channel around Tewantin, and in the narrow channel between Goat Island and Noosa North
                 Shore. The project recommended installing a number of pilot reefs for further assessment.

                 University of Queensland Historical Ecology of the Noosa Estuary fisheries, 2015

                 Ruth Thurston from the University of Queensland undertook a historical ecology study on behalf of TNC
                 and NSC in the Noosa River estuary to develop an understanding of historical fisheries productivity,
                 including oysters. The study confirmed oyster reefs used to exist in the estuary and were commercial
                 harvested in the early 1900s. Fish populations were also significantly larger in the past than they are
                 today.

                 University of Sunshine Coast, Bring Back the Fish, 2018-2020

                 A three-year study which installed a series of experimental ‘oyster habitat restoration units’ consisting
                 of coir bags filled with oyster shell at 14 sites across the estuary. The project studied the structural
                 integrity of the units, oyster recruitment, fish and invertebrate community assemblages and human
                 interactions with the trail reefs.

                 NSC-TNC Partnership Agreement 2019

                 NSC and TNC, in addition to other organizations with an interest in the River’s sustainability (including
                 Noosa Parks Association, The Thomas Foundation and Noosa Biosphere Reserve Foundation), through
                 a series of dialogue and presentations to Noosa Shire Council, have recognized that the strategic
                 priorities of both organisations, and of others, would be more effectively served through a formal
                 partnership, rather than on an individual project basis. This led to the development of this Project, and
                 associated formal agreement between NSC and TNC, and is the main delivery mechanism of the TNC-
                 NSC Partnership.




                                                                                                                       12




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 13

                 TNC Project Management Plan 2020

                 The TNC Project Management Plan was formally adopted by the project’s Technical Advisory Group
                 (TAG) and Noosa Shire Council in September 2020. The Plan, available on request, broadly scopes the
                 restoration project and includes:

                     a. Risk Assessment
                     b. Communications Plan
                     c. Monitoring, Evaluation and Reporting (MER) Plan

                 1.8 Definitions

                 Restoration zone

                 ·   An area of the estuary, with distinguishable physical and ecological characteristics in which specific
                     restoration sites are selected.

                 Restoration site

                 ·   A specific area of riverbed where restoration works are undertaken.
                 ·   A restoration site is larger than the restoration footprint to allow for the expansion of the
                     restoration footprint in the future.

                 Restoration footprint

                 ·   The area of the rock and/or rock + shell composite substrate in direct contact with the riverbed
                     within a restoration site.
                 ·   The footprint comprises a series of oyster reef patches, which are the on-site placement of modular
                     designs.
                 ·   The footprint area is the sum of the area of oyster reef patches on a given restoration site, or across
                     restoration sites.
                 ·   The footprint area of a restoration site is less than the area of the restoration site in which they
                     site.

                 Oyster reef patch

                 ·   An area rock or rock + shell placed on a restoration site as the foundation for oyster ecosystem
                     restoration, and which is readily discernible from all other oyster reef patches.
                 ·   Oyster reef patches are placed in association with each other, to maximise ecological interaction
                     (as a reef complex) and are placed on site to best match the profile and ecological character of a
                     restoration site.
                 ·   Oyster reef patches are separated to maximise water flow between and around each patch, to
                     reduce sedimentation potential, reduce erosion potential (of the patch itself – undercutting, and
                     shoreline – by refraction waves), and to not impede fish passage.
                 ·   The number of oyster reef patches on a restoration site in a series may vary reflect the site
                     characteristics.
                 ·   The number of rows of oyster reef patches may vary to reflect the site characteristics, particularly
                     bathymetry.
                 ·   If more than one row of oyster reef patches is placed on a site, the rows of oyster reef patches are
                     offset.


                                                                                                                         13




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 14

                 ·    The distance between oyster reef patches is specified in the engineered drawings for each
                      restoration site. The relief and profile of each patch is specified in the engineered drawings for each
                      restoration site.

                 Restoration modules

                 ·    Engineering concepts to show how oyster reef patches may be placed in association with each
                      other on a restoration site, while meeting specific engineering requirements.

                 1.9 Summary of restoration targets

                 An oyster ecosystem restoration site should over time demonstrate an increase in abundance and
                 density of rock oysters and increased diversity of epifauna comparative to the surround sediments.
                 Specifically, within 6-8years of oyster reef patches being deployed, a restoration site should
                 demonstrate:

                      •   Density of rock oysters at restoration site average of > 200 individuals/m2
                      •   4+ age classes of rock oysters present at restoration site (= approx. 2 cohorts of oysters
                          reproductive)
                              ➢ 5% of rock oyster population at the site is 3+ years old
                      •   Increased density of oyster recruits with 3-4 reproductive cycles
                      •   5 times more epifauna on oyster habitat than on surrounding sediment10

                 1.10 Qualifications

                 All information in this submission, and attached code assessments, relating to the design, footprint
                 minimisation, specification, construction, movement, sinkage, stability, erosion minimisation, risks and
                 management and substrate rectifications relating to the restoration substrates (of rock, or rock and
                 shell), are made with the approval of the project’s consultant engineers, International Coastal
                 Management (ICM).

                 All information in this submission, and attached code assessments, relating to oyster ecosystem
                 restoration, fish habitats and marine plants in the Noosa River, have been reviewed by TNC ecologists
                 as well as TNC’s independent consultant ecologists, Ecological Service Professionals (ESP).

                 In 2020, TNC also contracted ESP to map the extend of seagrass and other marine habitats throughout
                 the Noosa River estuary. The results of that work are incorporated into on the restoration drawings and
                 advised the placement of the restoration substrates (the footprint) in each restoration site so as to
                 avoid impact on marine plants, or to cause only temporary impact on marine plants, as is the case at
                 the Tewantin restoration site.




                 10
                   McAfee et al 2020. The value and opportunity of restoring Australia's lost rock oyster reefs. Restoration
                 Ecology Volume 28, Issue 2 March 2020. https://doi.org/10.1111/rec.13125
                                                                                                                               14




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 15

                 1.11 Guarantees

                 Bathymetric information

                 All matters described in this plan, and in the associated government code assessments, related
                 bathymetric/hydrographic information, which was undertaken to MSQ specifications (with MSQ input
                 to the contracting process) have been provided by the project consultants:

                 NorthGroup Consulting engineers

                 Contact: [email protected]



                 Ecological information

                 All matters described in this plan, and in the associated government code assessments, related
                 ecological information, have been provided or reviewed by the TNCs professional ecologists and by the
                 project consultants, and specialists in the ecology of the Noosa River estuary:

                 Ecological Service Professionals Pty Ltd

                 Contact: [email protected]



                 Engineering information

                 All matters described in this plan, and in the associated government code assessments, and drawings,
                 related to engineering design, engineering specifications or descriptions relating to engineering
                 performance of the restoration substrates (e.g. reef patch positioning, stability, erosion potential) have
                 been provided or reviewed by the project consultant engineers and are certified by them for
                 engineering integrity within the scope of their remit:

                 International Coastal Management (ICM) – Specialist Coastal Engineers

                 Contact: [email protected]




                                                                                                                        15




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 16

                 SECTION 2 – RESTORATION MODELS
                 Habitat and restoration suitability modelling are analytical techniques used to select broad restoration
                 zones and local restoration sites that are suitable for oyster ecosystem restoration within an estuary.
                 It is within the restoration sites that restoration substrates (in this case principally rock riprap) is
                 placed to form the foundation of new oyster beds.

                 2.1 Habitat suitability

                 Where shellfish ecosystem restoration is conducted often determines how successful an effort is. In
                 Noosa, TNC used standardized habitat suitability indices and geospatial decision support tools to
                 confirm the suitability of the Noosa River estuary for oyster ecosystem restoration.

                 Known environmental and biological criteria of the dominant rock oyster species, Sydney Rock Oyster
                 (Saccostrea glomerata), were compared with the physical parameters of the estuary (i.e. bathymetry,
                 salinity, temperature, dissolved oxygen,). Areas of the estuary which are suitable for rock oyster
                 restoration were then rated for their suitability (Table 2.1) and presented, geospatially, in the Habitat
                 Suitability Model (Figure 2.1).

                 While the Habitat Suitability Model indicates that large areas of Lake Doonella and Lake Weyba would
                 be suitable for rock oyster restoration, practically, this would not be the case (as per the Restoration
                 Suitability Model presented further on in this submission). Further challenges in the lakes include high
                 sediment loads, high retention of suspended sediments after storms and low flow regimes. These
                 possible limitations would need to be tested as part of Phase II restoration works.

                 Table 2.1: Habitat suitability parameters and criteria for Sydney rock oysters

                  PARAMETER            ENVELOPE   CRITERIA        Rationale                          Source
                                                  (more
                                                  suitable = 4,
                                                  less = 0)
                  Bathymetry           0-9 m      0-9m = 4        Within ecological tolerances.      (Powers et al. 2009, Gillies et
                                                  >9m = 0         Below LAT weighted higher as       al. 2018)
                                                                  subtidal restored oyster
                                                                  ecosystems have been seen to
                                                                  perform better than intertidal
                                                                  ecosystems.
                  Salinity Av          25-35ppt   35-30=4;        Within ecological tolerances.      (Nell and Gibbs 1986, Nell
                                                  30-25=3;        Lower salinities scored lower as   and Holliday 1988, Holliday
                                                  <25=0           linked to outbreaks of the         1995, Dove 2003, Butt et al.
                                                                  protozoan parasite QX              2006, Dove and O’Connor
                                                                  (Marteilia 16ydney).               2007, Diggles 2013,
                                                                                                     Schrobback et al. 2014)
                  Temperature          8-29C      8-24C= 4;       Within ecological tolerances.      (Holliday 1995, Butt et al.
                  Max                             24-28 = 2;      Temperatures above 28 °C           2006, Diggles 2013,
                                                  >28=0           scored lower as linked to          Schrobback et al. 2014,
                                                                  outbreaks of the protozoan         Snyder et al. 2017)
                                                                  parasite QX (Marteilia sydneyi).
                  DO Av                >4mg/L     >4mg/L = 4;     Within ecological tolerances.      (Schrobback et al. 2014)
                                                  <4mg/L= 0


                                                                                                                                    16




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 17

                 Figure 2.1: Habitat Suitability Model for Sydney rock oysters in the Noosa River estuary




                                                                                                            17




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 18

                 2.3 Restoration suitability

                 TNC overlayed the Habitat Suitability Model with ecological considerations, logistical constraints, and
                 details of the built infrastructure and human uses of the Noosa River. These parameters were then
                 allocated exclusion criteria, to minimise potential interactions of the river users with restoration sites
                 (e.g. distances from tidal works, foreshore access points, moorings, submarine cables) (Table 2.2). The
                 results of this analysis are presented, geospatially, in the restoration suitability model (Figure 2.2). The
                 exclusion criteria where determined in consideration of regulated distances applied to vessels (e.g.
                 distances from moorings) and on practical consideration of river uses (e.g. access to foreshores from
                 the river, distances from navigation channels). This assessment was undertaken in consultation with
                 Maritime Safety Queensland (MSQ) and NSC and reviewed by the Noosa TAG.

                 Table 2.2: Restoration suitability parameters and exclusion criteria for rock oyster ecosystems in the
                 Noosa River estuary

                  PARAMETER            ENVELOPE     CRITERIA (more       RATIONALE                                            SOURCE
                                                    suitable = 4, less
                                                    = 0)
                  Marine plants        10m –        Areas within 10-     Connectivity to other structured habitats such as    (Duncan et
                  proximity            500m         500m buffer =4;      seagrass, mangroves, increases diversity. 10m        al. 2019)
                  (including                        all other areas      minimum distance used to mitigate damage to          Confirmed
                  seagrasses)                       =2                   marine plants and 2m from mangroves, aerial          with
                                                                         mangrove roots and fallen timber, but ensuring       engineers
                                                                         connectivity.
                  Rocky reef           2m – 500m    Areas within 5-      Connectivity to other structured habitats
                  proximity                         500m buffer =4;      increases diversity. 2 metre minimum distance
                                                    all other areas      included to mitigate damage to rock substrates
                                                    =2                   while maintaining connectivity. Direct
                                                                         augmentation of degraded rocky reef by permit
                                                                         only.
                  Extant oyster        2m – 250m    Within 2m –          Connectivity to other structured habitats            (Boor et al.
                  ecosystems                        250m = 4; all        increases biodiversity. Connection to other oyster   2018, Guy
                  proximity                         other areas = 2      reefs increases meta-population connectivity,        et al. 2018,
                                                                         successful reproduction and oyster recruitment. 2    Duncan et
                                                                         metre minimum distance included to mitigate          al. 2019)
                                                                         damage to extant oyster ecosystems but ensuring
                                                                         connectivity.
                  Historical oyster    Within 250   Within 250m =        Sites which have historically supported oyster       (Gillies
                  ecosystem            m            4; all other areas   ecosystems are thought to be able to support         2018)
                  proximity                         =2                   future oyster ecosystems. Restoration takes place
                                                                         on the sites of historic oyster ecosystems, which
                                                                         may now be lost, where known and practical.
                  Mobile seabed        Exclusion    Within exclusion     Highly mobile seabeds generally offer unsuitable     Agreed
                                       area         area = 0, all        substrates for shellfish restoration.                with TNC
                                                    other areas = 4                                                           restoration
                                                                                                                              scientists
                  Mangroves            +2m          Within exclusion     Minimum distance of 2m maintained between            (Boor et al.
                  (including           minimum      area = 0, all        intertidal marine plants and oyster ecosystems to    2018, Guy
                  pneumatophores),     distance     other areas = 4      protect plants, as well as fallen trees (which are   et al. 2018,
                  fallen trees and                                       also important habitats) from works associated       Duncan et
                  timber in                                              with the oyster ecosystem. Relatively close          al. 2019).
                  waterways.                                             proximity maintained to maximise ecological          Discussed
                                                                         connectivity.                                        with
                                                                                                                              engineers




                                                                                                                                         18




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 19

                  Small craft            + 10 m      Areas within         Minimum channel width of 10m in constrained          Discussed
                  channels              width        buffer = 0; all      river channels maintained to oyster ecosystems       with MSQ
                                        channel      other areas = 4      do not impede on safe navigation.
                                        maintained
                  Tidal Works            + 30 m      Within 250m =        Minimum distance of 30m maintained between           Discussed
                  (pontoons, jetties,   distance     4; all other areas   tidal works and oyster ecosystems. Reduce the        with MSQ
                  boat ramps)           maintained   =2                   chance of damage to the oyster ecosystems, but
                                                                          also protects vessels and ensures general public
                                                                          safety when using these facilities.
                  Moorings              + 30 m       Within 30 m = 0,     Minimum distance of 30m maintained between           Discussed
                                        distance     all other areas =    official moorings and oyster ecosystems to reduce    with MSQ
                                        maintained   4                    chances of damage to moored vessels oyster
                                                                          ecosystems. The distance also takes into
                                                                          consideration the maximum possible length of a
                                                                          vessel attached to a mooring in the river.
                  Foreshore Access      + 10 m       Within exclusion     Minimum distance of 10m either side of public        Discussed
                  (beaches and          distance     area = 0, all        foreshore access points maintained for ease of       with MSQ
                  parks)                maintained   other areas = 4      vessel access to useable shorelines.
                  In-water urban        +5m          Within exclusion     Minimum distance of 5m maintained between            Discussed
                  utilities             distance     area = 0, all        submarine cables and pipelines and oyster            with
                  (submarine cables     maintained   other areas = 4      ecosystems. No anchoring of construction vessels     engineers
                  & pipelines)                                            or monitoring vessels within 200m of in-water
                                                                          urban utilities.
                  In-water transport    + 30 m       Within exclusion     Minimum distance of 30m maintained between           Discussed
                  utilities (cross-     distance     area = 0, all        in-water transport utilities and oyster ecosystems   with MSQ
                  river cable barges,   maintained   other areas = 4      to maintain safe operation of public transport
                  ferry terminals,                                        services in the river.
                  etc.)
                  Seaward extent        < 30 m*      Within exclusion     Sites for oyster ecosystem restoration extend        Discussed
                                        from         area = 0, all        from the intertidal zone to a maximum distance of    with MSQ
                                        shorelines   other areas = 4      30m from the associated shoreline to minimise        and DAF
                                                                          impacts on river users. Exceptions would be          Fisheries
                                                                          subject to careful assessment and the written        and Boating
                                                                          approval of Maritime Safety Queensland.              Patrol
                  Water depth           < 2m         Within exclusion     Oyster ecosystems are only established in water      (Gillies et al
                                        below        area = 0, all        depths less than 2m below the Mean Low Water         2018)
                                        MLWS         other areas = 4      Spring tidal line at a restoration site. This
                                                                          maximised the chance of restoration success.




                                                                                                                                           19




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 20

                 Figure 2.2: Restoration Suitability Model for rock oyster ecosystem restoration in the Noosa River
                 estuary




                                                                                                                      20




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 21

                 2.4 Habitat mapping

                 TNC contracted the consultancy firm Ecological Service Professionals (ESP) to map the extent and
                 condition of marine and fringing habitats adjacent to the proposed restoration sites (see Annex 1:
                 Noosa River Habitat Survey Report. This information has been incorporated into the engineered
                 diagrams and layouts of oyster reef patches on the restoration sites developed specialist coastal
                 engineers, International Coastal Management (ICM) who were contracted to this project. The results
                 are presented in Annex: 14: Engineering Drawings. The information is also incorporated into the
                 descriptions of the restoration sites under Section 4: Restoration Sites.




                                                                                                                21




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 22

                 SECTION 3 – RESTORATION SITES
                 Restoration works are planned in four restoration sites. These sites are located at Tewantin, Goat Island,
                 Noosa Sound East and Noosa Sound West as indicated in Figure 3.1.




                 Figure 3.1: Above left, Location of the Tewantin and Goat Island restoration sites in the Main Channel
                 Restoration Zone; Above right, Location of the Noosa Sound East and Noosa Sound West restoration
                 sites in the Noosa Sound Restoration Zone. Source: International Coastal Management (ICM)

                 Marine habitats report

                 In September 2020, TNC contracted Ecological Service Professionals (ESP) to undertake benthic surveys
                 in the Tewantin, Goat Island and Noosa Sound restoration sites and surrounds, as well as upper and
                 lower Weyba Creek. The report is presented in (Annex 1: Noosa River Habitat Survey Report). The
                 Weyba Creek sites are not part of this restoration plan and information specific to the proposed
                 restoration footprints has been extracted and included in the refined restoration site descriptions
                 below.

                 ESP completed their habitat surveys over four days (7–8 September and 4–5 November 2020). ESP’s
                 survey results advised the positioning of the oyster reef patches within the sites. The benthic maps
                 produced by ESP have been incorporated in the site diagrams (Annex 14: Engineering Drawings).

                 The ESP report specifically discusses the Tewantin restoration site, where temporary disturbance of
                 macroalgae is anticipated.


                                                                                                                        22




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 23

                 Please note, that in line with the ESP report, no impact to mangroves or seagrass as a result of the
                 works is expected at any of the proposed restoration sites.


                 3.1 Tewantin




                 The Tewantin Restoration Site is located along the southern shoreline of the Noosa River. The site lays
                 adjacent to Tewantin Park, more than 100m upstream of the Tewantin boat ramp.

                 A port channel marker is located seaward at the downstream end of the site. A Telstra-owned
                 submarine telecommunications cable bisects the site at the upstream end. The cable is relatively
                 accurately mapped but its exact position will be confirmed and mapped, by geographic survey, prior to
                 construction work commencing. Exclusions are imposed for the telecommunications cable. A small
                 beach intersects the fringe and has been excluded from the restoration footprint.

                 A narrow strip (5m wide canopy) of cotton wood (Hibiscus tiliaceus), interspersed with grey mangroves
                 (Avicennia marina) and river mangroves (Aegiceras corniculatum) occupy the shoreline fringe.
                 Mangroves are in moderate condition, growing on rock and gravel on an erosion prone bank. A public
                 walkway lies landwards of the fringing mangroves.

                 The proposed oyster reef patches would be placed primarily on bare sand and gravel (with dead oyster
                 shell) and on rocky rubble adjacent to marine plants in the intertidal zone. The patches will cover a total
                 area of 1326 m2 and be at least 10 m from seagrass and 2 m away from mangroves (including
                 pneumatophores) to prevent any direct damage to those marine plant assemblages.

                 As per Annex 1, ESP has confirmed that the oyster reef patches will be placed primarily on bare gravel
                 with dead oyster shell which makes up 42 percent of the 1326 m2 area covered by restoration patches.
                                                                                                                         23




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 24

                 In addition, existing patchy rock and rubble, which covers 24 percent of the benthic habitat in the
                 proposed restoration patch areas will be supplemented with additional rock (i.e., Rock Rubble - 246 m2
                 & Oyster, Rubble & Mud – 77 m2).

                 ESP also confirmed that a relatively small section of patchy rock was covered by sparse oysters and
                 sparse patches of macroalgae (Padina sp. and turfing algae). Based on this habitat survey, less than 479
                 m2 of this patchy rock and rubble habitat supporting a degraded macroalgal assemblage would be
                 temporarily disturbed, although the area to be disturbed is likely to be an overestimate as it is planned
                 to place the majority of substrate onto bare gravel and sand between existing rock patches where
                 possible and thereby minimise potential disturbance.

                 The macroalgal assemblages were also in relatively poor condition due to high sediment loads observed
                 on and around the existing rocky reef and rubble areas, with some sections of reef having a high
                 coverage of fine sediment.

                 Given the speed at which Padina can colonise hard surfaces (dead oyster shell) elsewhere in the estuary,
                 ESP anticipates that supplementary habitat provided as part of the proposed restoration project would
                 be colonised rapidly within 1 year of deployment, and that coverage would be similar to the current
                 condition within 2 to 3 years post deployment, particularly in sections that remain subtidal and not
                 covered by fine silt. Related images are presented in Figures 3.2 to 3.5 below. Additional images are
                 provided in the ESP report.




                                                                                                     Photo: Craig Bohm, TNC


                 .

                 Figure 3.2: Tewantin Restoration Site lies adjacent to this shoreline. Noosa Shire Council chambers is
                 in the background. Public park fringes the site. The Tewantin boat ramp is to the far left behind the
                 trees and 30m from the edge of the restoration site.




                                                                                                                              24




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 25

                                                                                                     Photo: Craig Bohm, TNC




                 Figure 3.3: Tewantin restoration site looking upriver from the middle of the intertidal section of the
                 site. The intertidal zone is dominated by a rock and rubble base interspersed with loose rock with low
                 density oyster coverage.




                                                                                                Photo: Simon Walker, ESP




                 Figure 3.4: Upstream end of the Tewantin Restoration Site. Loose rocks over a rock rubble base
                 dominate the site. Aerial mangrove roots are interspersed by mostly landward of the lose rock. Rock
                 oysters grow on the lose rocks. Source: Simon Walker (ESP)


                                                                                                                              25




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 26

                                                                                                            Photo: Simon Walker, ESP




                 Figure 3.6: Sub-tidally the habitat is characterised by having patchy small rock outcrops with sparse
                 coverage of foliose and turfing macroalgae (primarily Padina and turf forming algae) separated by
                 bare sand, gravel and mud patches. Source: Simon Walker, ESP.




                                                                                                     Simon Walker, ESP




                 Figure 3.6: Sparse macroalgae (Padina sp.) growing on rock at Tewantin restoration site. Source: Simon
                 Walker, ESP.

                                                                                                                                       26




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 27

                 Matters of State environmental significance (MSES) - Tewantin

                 Refer to attached plans – MSES (Annex 2), MQ1401 (Annex 3), Noosa River FHA (Annex 4)

                       •   High Ecological Value Waters (wetland)
                       •   High Ecological Significance Wetlands
                       •   Noosa River Declared Fish Habitat (A) Area

                 High Ecological Value (HEV) Waters (wetland) / High Ecological Significance (HES) Wetlands

                 The oyster ecosystem restoration works are designed to enhance the values of the wetland by restoring
                 a complex ecosystem to what is currently a degraded aquatic environment.

                 Mangroves and seagrasses are not within the footprint of this project and will not be impacted.

                 A small stand of mangroves is shoreward of the proposed restoration footprint. Mangrove areal roots
                 extend into the intertidal zone adjacent to the proposed restoration footprint. Mangrove roots are
                 excluded from the restoration footprint at a minimum distance of 2m. Seagrass is found upstream and
                 outside of the restoration footprint and is excluded from the footprint at a minimum distance of 10m
                 from the footprint.

                 According to project consultants, ESP, macroalgae growing on rocks, dominated by Padina sp. is sparse
                 (less than 15% of the surface area), with a footprint of less than 479m 2. The macroalgal assemblages
                 are in relatively poor condition due to high sediment loads observed on and around the existing rocky
                 reef and rubble areas, with some sections of reef having a high coverage of fine sediment.

                 ESP also confirmed that given the speed at which Padina can colonise hard surfaces (dead oyster shell)
                 elsewhere in the estuary, it is anticipated that supplementary habitat provided as part of the proposed
                 restoration project would be colonised rapidly within 1 year of deployment, and that coverage would
                 be similar to the current condition within 2 to 3 years post deployment, particularly in sections that
                 particularly in sections that remain subtidal and not covered by fine silt.

                 The proposed oyster reef patches are designed and certified by engineers. The oyster reef patches are
                 spaced (1-4m apart) so as not to not impede fish passage, cause significant or impact negatively on
                 natural hydrological processes of the waterway. The oyster reef patches are set away from the
                 shoreline and will not interfere with overland flow and runoff as a result of floods.

                 Water quality will be maintained at the restoration sites during the construction phase in accordance
                 with the sediment management protocol outlined in this Restoration Plan (see Section 6.4: Sediment
                 Management). The restored oyster ecosystems will enhance water quality by filtering estuarine water,
                 removing algae and particulate matter from the water column and converting nutrients, such as
                 nitrogen and phosphorus, into biogenic oyster growth as well as binding these into the surrounding
                 sediments[1].

                 Water quality will be monitored at the restoration sites using standard parameters (pH, temperature,
                 dissolved oxygen, salinity, total dissolved solid) and significant changes reported.

                 The works will maintain recreational access to shorelines or the waters in which the oyster ecosystems
                 grow. All shorelines with recreational access have been excluded from the selection process. Visual

                 [1]
                   Kellogg, M. & Cornwell, Jeffrey & Owens, Michael & Paynter, Kennedy. (2013). Denitrification and nutrient
                 assimilation on a restored oyster reef. Marine Ecology Progress Series. 480. 1-19. 10.3354/meps10331.
                                                                                                                               27




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 28

                 amenity will be maintained, as less than one third of the reef patch area will be exposed to view at low
                 tide. Signage used to indicate the location of the restoration footprints will be optimised, with agency
                 input, and will generally be considered temporary until the oyster ecosystems are established, at which
                 time most signage, if not all will be removed from the river (as per government direction).

                 The work also enhances cultural and spiritual connection to place, enjoying the support of Kabi Kabi
                 Traditional Owners. Kabi Kabi Elders are providing the project with valuable cultural and historic
                 information and share the common interest of restoring oyster beds and reefs to the Noosa River
                 system.

                 Declared FHA (A areas) – Noosa River

                 Works propose to restore ecological values and enhance fisheries resources at the site by the
                 restoration of oyster ecosystem to the site, which provide habitat and food resources, breeding sites
                 and nursery areas for marine fish.

                 The works at the Tewantin restoration site will not impact on mangroves or seagrass. According to
                 project consultants, ESP, macroalgae growing on rocks, dominated by Padina sp. is sparse (less than
                 15% of the surface area), with a footprint of less than 479m2. The macroalgal assemblages are in
                 relatively poor condition due to high sediment loads observed on and around the existing rocky reef
                 and rubble areas, with some sections of reef having a high coverage of fine sediment.

                 ESP also confirmed that given the speed at which Padina can colonise hard surfaces (dead oyster shell)
                 elsewhere in the estuary, it is anticipated that supplementary habitat provided as part of the proposed
                 restoration project would be colonised rapidly within 1 year of deployment, and that coverage would
                 be similar to the current condition within 2 to 3 years post deployment, particularly in sections that
                 particularly in sections that remain subtidal and not covered by fine silt.




                                                                                                                      28




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 29

                 3.2 Goat Island




                 The Goat Island Restoration Site lies approximately mid-section along the southern shoreline of Goat
                 Island. The site is shoreward of the main boating channel and sites on a large sand bank that extends
                 along the entire length of Goat Island.

                 The site avoids public moorings and marine habitats, and these are excluded with minimum distances.
                 The site is within the declared fish habitat (A) management area.

                 The shoreline is a patchy and narrow fringing mangrove forest between coastal rainforest communities
                 dominated by grey mangrove (Avicennia marina). Canopy height of 4 to 6 m. Forest extends to a large
                 low canopy forest to the north-east of the island, away from the restoration site. The mangroves in this
                 reach are in good condition.

                 Well sorted sand sub-tidally and no epifaunal invertebrates were recorded on the surface of the
                 unvegetated habitats. There was typically a low density of burrows observed in most reaches.

                 Mangroves and seagrass are excluded from the site. No impact to the mangroves and seagrass is
                 expected.

                 Related images are presented in Figures 3.7 - 3.9.




                                                                                                                      29




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 30

                                                                                                                  Photo: Craig Bohm, TNC




                 Figure 3.7: The Goat Island Restoration Site fringes the southern shoreline of the Goat Island
                 Conservation Reserve.




                                                                                                     Photo: Craig Bohm,
                                                                                                     TNC




                 Figure 3.8: Sub-tidally, the site is dominated by a sand bank with few ecological features. Consolidated
                 soft sand overlaying compact sand fringes the shoreline. Mangroves, aerial mangrove roots and
                 associated vegetation are present along the shoreward margins.




                                                                                                                                    30




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 31

                                                                                                        Simon Walker, ESP




                 Figure 3.9: Bare sand adjacent to Goat Island. Source: Simon Walker, ESP

                 Matters of State environmental significance (MSES) – Goat Island

                 The Goat Island site is within the following MSES:

                     •    High Ecological Value Waters (wetland)
                     •    Declared FHA (A and B areas)
                     •    Protected Area (estates)

                 High Ecological Value Waters (wetland)

                 The oyster ecosystem restoration works are designed to enhance the values of the wetland by restoring
                 a complex ecosystem to what is currently a degraded aquatic environment.

                 Marine plants are not within the footprint of this project and will not be impacted.

                 A small stand of mangroves is shoreward of the proposed restoration footprint. Mangrove areal roots
                 extend into the intertidal zone adjacent to the proposed restoration footprint. Mangrove roots are
                 excluded from the restoration footprint at a minimum distance of 2m. Seagrass is found outside of the
                 restoration footprint and is excluded from the footprint at a minimum distance of 10m from the
                 footprint.

                 The proposed oyster reef patches are designed and certified by engineers. The oyster reef patches are
                 spaced (1-4m apart) so as not to not impede fish passage, cause significant erosion or impact negatively
                 on natural hydrological processes of the waterway. The oyster reef patches are set away from the
                 shoreline and will not interfere with overland flow and runoff as a result of floods.

                 Water quality will be maintained at the restoration sites during the construction phase in accordance
                 with the sediment management protocol outlined in the Restoration Plan (Section 6.4: Sediment
                 Management). The restored oyster ecosystems will enhance water quality by filtering estuarine water,
                 removing algae and particulate matter from the water column and converting nutrients, such as




                                                                                                                            31




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 32

                 nitrogen and phosphorus, into biogenic oyster growth as well as binding these into the surrounding
                 sediments[1].

                 Water quality will be monitored at the restoration sites using standard parameters (pH, temperature,
                 dissolved oxygen, salinity, total dissolved solid) and significant changes reported.

                 The works will maintain recreational access to shorelines or the waters in which the oyster ecosystems
                 grow. All shorelines with recreational access have been excluded from the selection process. Visual
                 amenity will be maintained, as less than one third of the reef patch area will be exposed to view at low
                 tide. Signage used to indicate the location of the restoration footprints will be optimised, with agency
                 input, and will generally be considered temporary until the oyster ecosystems are established, at which
                 time most signage, if not all will be removed from the river (as per government direction).

                 The work also enhances cultural and spiritual connection to place, enjoying the support of Kabi Kabi
                 Traditional Owners. Kabi Kabi Elders are providing the project with valuable cultural and historic
                 information and share the common interest of restoring oyster beds and reefs to the Noosa River
                 system.

                 Declared FHA (A and B areas)

                 Works propose to restore ecological values and enhance fisheries resources at the site by the
                 restoration of oyster ecosystem, which provides habitat and food resources, breeding sites and nursery
                 areas for marine fish.

                 The works at the Goat Island restoration site will not impact on marine plants.

                 Protected Area (estates)

                 The Goat Island Conservation Park is a protected area that is estuarine in nature and protects
                 mangroves, related tree communities and tidal flats of Goat Island. The park sits adjacent and landward
                 of the proposed Goat Island restoration footprint. The values of the park are protected from the
                 restoration works as all mangrove and tree communities within the park are outside of the restoration
                 footprints. Aerial mangroves roots, fallen timber and other marine plants encountered on the tidal flats
                 are further protected by a 2m separation area between them and the oyster reef patches as per this
                 Restoration Plan (Section 2.3, Table 2.2., line 1).

                 The proposed works are designed to minimise the potential for erosion of the park shoreline. On the
                 contrary, it is expected that the works may enhance protection of the park shoreline by attenuating
                 some wave action due to the high rugosity and positioning of the oyster reef patches, which will
                 attenuate wave energy before it reaches the shoreline at all but the highest points of the tidal cycle
                 (see Section 7.4. Erosion control).




                 [1]
                   Kellogg, M. & Cornwell, Jeffrey & Owens, Michael & Paynter, Kennedy. (2013). Denitrification and nutrient
                 assimilation on a restored oyster reef. Marine Ecology Progress Series. 480. 1-19. 10.3354/meps10331.
                                                                                                                               32




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 33

                 3.3 Noosa Sound East




                 The Noosa Sound East Restoration Site is located in an embayment along the south-eastern shoreline
                 of the Noosa River estuary, opposite the Noosa Sound canal estate. The site lies outside of the declared
                 fish habitat area and adjacent to private land. Associated housing lies on a ridgeline above the site and
                 at considerable distance from the shoreline.

                 Relevant shoreline infrastructure includes a small beach, boat ramp and small wooden jetty associated
                 with the resorts on the ridgeline. All infrastructure is buffered to prevent intrusion of restoration works
                 on these structures and their use.

                 Narrow fringing mangrove forest between coastal rainforest communities dominated by red and grey
                 mangroves with occasional orange and yellow mangroves. While the mangrove fringe was generally
                 less than 10m wide, it is in good condition.

                 Well sorted sand, which covered most habitats within each of the reaches investigated particularly in
                 channel habitat. No epifaunal invertebrates were recorded on the surface of the unvegetated habitats
                 during the survey and there was typically a low density of burrows observed in most reaches. Some
                 sections of the sediment in Noosa Sound were covered by benthic microalgae, particularly where there
                 were freshwater inputs.

                 Isolated seagrass patches but not within 10m of planned restoration footprint. Mangroves and
                 seagrass are excluded from the site. No impact to the mangroves and seagrass is expected.

                 Related images are presented in Figures 3.10-3.12.




                                                                                                                         33




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 34

                                                                                                      Photo: Craig Bohm, TNC




                 Figure 3.10: Noosa Sound East Restoration site lies in the embayment on the right side of the image
                 (facing) up to the white 6 knot sign against the shoreline on the far right. The site avoids the main
                 navigation channel. There is no housing along this shoreline.




                                                                                                       Photo: Craig Bohm, TNC




                 Figure 3.11: Landward, the shore is mixed vegetation and mangroves. Sub-tidally, fine sediments
                 overlay a hard base with no distinguishable habitat features.




                                                                                                                                34




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 35

                                                                                                    Photo: Craig Bohm, TNC




                 Figure 3.12: Fallen vegetation occurs in this site and will be protected from construction works with
                 minimum distances to minimise disturbance. Where vegetation falls onto the restoration site from
                 overhanging trees, this will be left where it falls.



                 3.4 Noosa Sound West




                 The Noosa Sound East Restoration Site is located in an embayment along the south eastern shoreline
                 of the Noosa Sound upstream of the Noosa Sound East Restoration Site. The site lies adjacent to the
                 Weyba Creek Bushland Reserve. The site lies within the Noosa Sound Restoration Zone and not within
                 a declared fish habitat area.

                                                                                                                             35




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 36

                 There is no shoreline infrastructure adjacent to this site. Downstream of the site is a public jetty. The
                 jetty is excluded from the site.

                 Fringing mangrove forest between coastal rainforest communities dominated by red and grey
                 mangroves with occasional orange and yellow mangroves. While the mangrove fringe was generally
                 less than 10m wide, it is in good condition. The lower canopy dominated by jointed rush (Juncus
                 kraussii), rusty sedge (Fimbristylis ferruginea), and saltcouch (Sporobolus virginicus) occurring
                 particularly towards the mouth of Weyba Creek.

                 Well sorted sand, which covered most habitats within each of the reaches investigated particularly in
                 channel habitat. No epifaunal invertebrates were recorded on the surface of the unvegetated habitats
                 during the survey and there was typically a low density of burrows observed in most reaches. Some
                 sections of the sediment in Noosa Sound were covered by benthic microalgae, particularly where there
                 were freshwater inputs.

                 Isolated seagrass patches but not within 10m of planned restoration footprint. Mangroves and
                 seagrass are excluded from the site. No impact to the mangroves and seagrass is expected.

                 Related images are presented in Figures 4.13 - 4.16.




                 The site sits within the embayment to avoid the main navigation channel.




                                                                                                        Photo: Craig Bohm, TNC




                 Figure 4.13: Noosa Sound West Restoration Site lies opposite Noosa Sound canal estate. The image
                 looks along the site downstream from the upstream end of the site towards the public jetty (white
                 area), which lies outside the site.




                                                                                                                                 36




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 37

                                                                                                      Photo: Craig Bohm, TNC




                 Figure 4.14: The downstream area of the site features compact sand substrate with fine sediments
                 overlaying. A combination of sedge and mangroves (with aerial roots) occur along the littoral fringe.




                                                                                                      Photo: Craig Bohm, TNC




                 Figure 4.15: The mid and upstream sections of the site feature compact sand substrate with fine
                 sediments overlaying. Mangroves with aerial roots dominate the littoral fringe.




                                                                                                                               37




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 38

                                                                                                   Simon Walker, ESP




                 Figure 4.16: Bare sand with sparse yabby burrows. Source: Simon Walker (ESP)

                 3.5 Public land

                 Detail of public land adjacent the restoration sites is presented in Table 3.1.

                 Table 3.1: Public land adjacent to restoration sites

                                                                                    Noosa Sound         Noosa Sound
                  Restoration Zone          Tewantin            Goat Island
                                                                                      East                West
                  Lot                    326                  35                                       604
                  Plan                   CP855842             MCH4795                                  SP188270

                  Property ID            145672               154048                                   132663
                                                                                Private land.      Weyba Creek
                                                           Goat Island
                                                                                Houses on ridge    Bushland
                                                           (Noosa River)
                  Property Name        Tewantin Park                            line               Reserve
                                                           Conservation
                                                           Park
                  Lot Area               13280.81             203141.32                                62229.91
                                       Council and Boat
                                       Ramp Car Park,      Goat Island,                            1B Serenity Cl,
                  Address              Pelican St,         NOOSA NORTH                             NOOSA HEADS
                                       TEWANTIN QLD        SHORE QLD 4565                          QLD 4567
                                       4565




                                                                                                                       38




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 39

                 SECTION 4 - PUBLIC CONSULTATIONS AND ENGAGEMENT
                 The Noosa community overwhelmingly supports this project and the restoration sites selected.

                 4.1 Face-to-face meetings

                 Since February 2020, the project team has met face-to-face with over 70 Noosa stakeholder groups and
                 including local recreational and active commercial fishers, tourism and recreational groups and Noosa
                 Council approved indigenous representatives to discuss the project and to present the proposed
                 restoration sites. The overwhelming feedback from these meetings was supportive.

                 Traditional owners, senior land claimants from the Kabi Kabi Nation, as identified by Noosa Council,
                 support the project and are involved in project activities. Kabi Kabi elders also provide technical input
                 to the historic assessments of oyster presence and uses in the Noosa River. TNC has been given approval
                 verbally by the traditional owners, and permission to incorporate local indigenous knowledge into the
                 project and its activities.

                 Commercial, recreational fishers and indigenous elders have already provided invaluable insights to the
                 history of the Noosa River, its uses and current extractive and non-extractive practices. Indigenous
                 engagement actions are planned as part of structured school and community engagement programs
                 that the project is helping resource.

                 Feedback from these numerous meetings was incorporated into the design process and reported to
                 Noosa Shire Council in the project annual report (2019-2020).

                 4.2 Community engagement workshop

                 On the 7th of December 2020, the project also facilitated a community engagement workshop in which
                 18 participants from local Noosa groups gathered and discussed partnership projects. From the
                 workshop 9 community projects were refined and are being implemented (see Annex 5: Community
                 Engagement Workshop Report).

                 4.3 Public consultation sessions

                 On the 14th of December 2020, the project facilitated 9 widely publicised public consultation sessions
                 about the project, the restoration projects and the Phase I restoration sites. During these sessions, 38
                 locals met face-to-face with TNC staff in small groups, and discussed the project purpose, methodology
                 and restoration sites and opportunities for restoration throughout the estuary (see Annex 6: Public
                 Consultation Sessions Report).

                 Most participants expressed overwhelming support for the project. Some 4-6 participants expressed
                 concerns about the need of the project, the integrity of the project’s local partners and the
                 transparency in the sources of funding. One concern was expressed about the expected success of the
                 project given that the past oyster restoration project, led by the University of the Sunshine Coast (USC)
                 and Noosa Biosphere Reserve Foundation (NBRF)11 did not deliver oyster reefs at the end of that
                 project. The project team clearly explained that in that project shell was placed in coir bags but the bags

                 11
                   Gilby, B. et al 2020. Bringing fish life back to Noosa: restoring lost oyster reef habitats in the Noosa Biosphere. Final Project Report.
                 University of the Sunshine Coast, School of Science and Engineering.


                                                                                                                                                               39




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 40

                 rapidly deteriorated or were damaged by anchors, thus preventing the reef formation. The team also
                 explained how in this project, a different methodology was being used.

                 Most participants were impressed by the tried and tested restoration methodology proposed for this
                 project. Many participants subsequently joined the project mailing list, some with the intention of
                 volunteering in project, while some local community groups are entering into formal and informal
                 partnerships with the project to undertake community outreach activities.

                 4.4 Recreational fisher engagement

                 TNC has a formal agreement with Ozfish nationally and works closely with them in Noosa.

                 4.5 Commercial fisher engagement

                 Outside of formal consultations, TNC has also regularly engaged the commercial fishing sector in Noosa,
                 keeping them up to date on project progress, sharing information and seeking their input on sites and
                 monitoring criteria.

                 While TNC would characterise the engagement with the active commercial sector as cordial, and
                 fruitful, the position of four of the six active commercial fishers regarding the project was not
                 supportive. When directly asked if the project would impact on their commercial interests, their
                 responses did not relate to specifically to commercial interests but to broader concerns. These
                 presented in italics below, followed by TNC’s responses.

                 Goat Island restoration site would narrow an already narrow section of the river

                 The width of the Noosa River at its narrowest point in the upper lower section is approximately 160
                 metres wide. The proposed works extend a maximum of 14 metres from shore, so less than 9 percent
                 of the width of the narrowest part of this section of the river.

                 The site is also at the northern landward margin of a very wide and shallow sand bank, which extends
                 more than 50 metres out into the estuary. This sand bank generally constrains most boat traffic to the
                 river channel south of the bank, far from the restoration site, leaving the bank available for formal and
                 informal moorings. The restoration site is proposed shoreward of the moorings.

                 Goat Island restoration site raises environmental concerns over hydrology and sand movement
                 TNC consultant coastal engineers, ICM, have certified that the oyster reef patches proposed for Goat Island have
                 been designed to minimise impacts to river flows and sand movement. Despite this, the reef patches at Goat
                 Island are anticipated to act as a segmented reef and provide some sheltering to the shoreline from wave action
                 and vessel wake which is anticipated to result in reduced erosion in the lee of the reefs. The reef patches have
                 been aligned with the river flows and incorporate spaces between the reef patches to minimise any impacts on
                 river flows.

                 Goat Island restoration site poses a navigational hazard

                 TNC has visited Goat Island on two occasions with Maritime Safety Queensland (MSQ). MSQ has
                 confirmed that the Goat Island site is not a significant navigation hazard, being set against the shoreline
                 away from official moorings and at a reasonable distance from the main navigation channel.




                                                                                                                              40




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 41

                 Restoration efforts are unlikely to get oysters to grow

                 TNC will augment the natural oyster recolonisation process using oyster spat set on shell cultch that is
                 placed on the oyster reef patches (see Section 5: Substrate augmentation). This is a tried and tested
                 method of offsetting natural variable recruitment of oysters in restoration projects. Oyster
                 augmentation would be repeated seasonally, if necessary, until recruitment is successful. The oyster
                 reef patches will also naturally attract invertebrates and marine plants such as macroalgae, important
                 components of oyster ecosystems and of benefit to the ecological health of the river.

                 Salinity and lack of river flow will be the enemy of the restoration effort

                 The salinity at the proposed restoration sites is well within the tolerances of oyster survivability and
                 growth as per Section 2.1, Table 2.1 Habitat suitability parameters and criteria for Sydney rock oysters.
                 Oysters are found growing across the lower estuary, including in relatively proximity to the planned
                 restoration sites.

                 Potential introduction of new species and structures to an already over used and abused system

                 The project will only use oyster brood stock sourced from the Noosa River. This brood stock will be used
                 to seed cured oyster shell with oyster spat in a bio secure hatchery. The seeded oyster cultch will then
                 be set onto the oyster reef patches. The methodology complies with strict state biosecurity protocols
                 for shell and live oyster handling. The activity will also occur under the conditions of a general fisheries
                 permit secured for that purpose and with regular communication with state biosecurity officers.

                 The project uses the oyster reef patches as the structural foundation of oyster ecosystem restoration.
                 The details of what the project will place in the river, and how it is prepared is outlined in detail in
                 Section 5. Restoration substrate.

                 4.6 Riverside homeowners

                 The TNC/Noosa Integrated Catchment Association (NICA) Oyster Gardening Project has spent the last
                 6 months talking about the project and oyster gardening with virtually all estuary side jetty owners. The
                 project also held an oyster gardening basket making workshop on Gympie Terrace, Noosaville, where
                 the public could come and discuss the project.

                 In talking to locals and numerous jetty owners, NICA reports that they have a few people who asked
                 probing questions about where the oyster restoration sites were exactly and the nature of the
                 restoration work. However, most people showed positive interest, or at least will towards the project.
                 No direct animosity about the project has been expressed.

                 TNC also wrote to three tourism operators who have jetties or boat ramps entering Noosa Sound. TNC
                 sent profiles of the project and requested meetings with the operators, but they did not respond to
                 TNC’s requests.

                 Prior to construction, TNC has agreed with Noosa Council to meet with tourism operators in proximity
                 to the construction load out site on Hilton Esplanade and with households living opposite the Noosa
                 Sound East and Noosa Sound West restoration sites.




                                                                                                                          41




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 42

                 4.7 Additional communications

                 TNC has produced special fact sheets about the project’s construction methodology, site designs, shell
                 recycling and biosecurity measures and have distributed these widely. TNC is currently producing a
                 special fact sheet about the biosecurity measures in place for this project. This will also be distributed
                 widely.

                 TNC and Noosa Council are also collaborating to produce a package of construction communications
                 and TNC will manage a public complaints mechanism during and post construction for the project,
                 whereby requests for information or concerns will come to TNC directly.

                 4.8 Project-based engagement actions

                 TNC has also established a series of local partnerships to support the imbedding of this initiative in the
                 Noosa community. These initiatives include:

                 Noosa Shuck Don’t Chuck – shell recycling by 3 local Noosa restaurants, who collect and wash oyster
                 shells for use in oyster seeding, as well as community based shell-washing – where local volunteers help
                 TNC wash, bag and store over 9 tonnes of cured oyster shell ready for use in the project.

                 Noosa Junior Schools Project – local partner organisation, Noosa Community Biosphere Association,
                 works with local junior schools to deliver activities which celebrate shellfish restoration efforts and
                 conservation of the Noosa River.

                 Noosa Senior Schools Project – local partner organisation, Noosa Environmental Education Hub works
                 with local senior schools to imbed shellfish restoration activities into curriculum subjects.

                 Noosa Oyster Gardening Project – local partner organisation, Noosa Integrated Catchment Association,
                 works with local jetty owners and businesses to grow local Noosa oysters in baskets, which are then
                 released onto the project’s rocky restoration substrates

                 Noosa Estuary Sediment Study – local partner organisation, Noosa Parks Association, works with
                 partner ecological firm, Ecological Service Professionals, to map the sediment distribution in the Noosa
                 River (sediment being recognised as one of the major impediments to natural oyster ecosystem
                 formation.

                 Other actions include presentations to local community groups, working with recreational fishing
                 groups such as Ozfish to collect underwater video footage of the restoration sites, and plans with
                 Tourism Noosa to imbed marine restoration key messages into tourism information products
                 throughout the Noosa Shire.




                                                                                                                        42




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 43

                 SECTION 5 – RESTORATION SUBSTRATE
                 The restoration process involves the deployment of igneous rock, sourced from a local quarry, as the
                 primary restoration substrate. The rock will be augmented, at some sites, with a mix of oyster shell,
                 which forms a composite substrate. Upper surfaces of the rock substrate are augmented with oyster
                 shell, which may be seeded with live oysters and which locks into the rock substrate. Live oysters may
                 also be added to the substrate.

                 The design specifications and placement of restoration substrates, as described below and presented
                 in the attached specifications and drawings, have been certified by the project’s consulting coastal
                 engineers, International Coastal Management (ICM). The rock substrate is stable, and the shell stability
                 has been optimised by hand placement within the rocky matrix. The configuration has been optimised
                 to provide characteristics suitable for the desired habitat and minimises potential impacts on coastal
                 processes and the surrounding environment.

                 5.1 Rock substrate

                 The project will use a locally sourced igneous rock as the primary restoration substrate. The rock is in
                 the size range 150-500mm diameter and deployed in configurations, as oyster reef patches, that meet
                 engineering requirements related to movement, stability, erosion avoidance and minimisation of
                 sediment accretion as per the specifications for each restoration site.

                 Using rock (as opposed to oyster shell) as the primary restoration substrate has many advantages.
                 These include:

                     •    Highly suitable as an oyster settlement substrate (rock oysters settle readily onto rock)
                     •    Resembles natural oyster bed substrates
                     •    Can be readily configured to meet engineering specifications for movement and stability under
                          varying estuarine conditions
                     •    Does not require complex engineering structures to support the shell to create vertical relief
                     •    Can be deployed and configured using standard construction equipment and practices
                     •    Readily meets ecological criteria for heterogeneity and rugosity and provision of habitats
                          historically present in the estuary
                     •    Raises the oysters above the benthic sediments of the river, helping ensure oysters attached
                          to the rock are free from benthic sediments and have maximum exposure to water flow
                     •    Offers multiple habitat opportunities across the intertidal and shallow subtidal ranges for
                          multiple species
                     •    Can be readily augmented with cured oyster shell to enhance rugosity, heterogeneity or
                          chemical cues for oyster spat
                     •    Is economically efficient to use, particularly if restoration is to occur at scale
                     •    More ready passes the ‘naturalness’ test with stakeholders than shell in bags or cages (for
                          example)

                 The use of local rock as a restoration substrate has been tried and tested by TNC and its state and local
                 government partners in sub-tidal oyster ecosystem restoration in Victoria, South Australia, Western
                 Australia and by the Department of Primary Industries (DPI) New South Wales in Port Stephens (Figures
                 5.1 and 5.2) for intertidal rock oyster ecosystem restoration.

                                                                                                                       43




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 44

                 Figure 5.1: Rock oyster restoration substrate deployed by DPI NSW in Port Stephens estuary in
                 February 2021. The rock is an igneous andesite in the 100-300mm diameter size range, though some
                 individual rocks are up to 500mm in diameter.




                 Figure 5.2: Rock oyster recruitment onto the underside of andesite rock in the Port Stephens
                 restoration project after 12 months of rock deployment. Native rock oysters typically recruit to the
                 underside of the restoration substrate, then progressively colonise the upper surfaces over time,
                 where environmental conditions allow. Source: Craig Bohm. TNC.

                 5.2 Substrate augmentation

                 The Noosa River estuary experiences some natural oyster recruitment due to the presence of a remnant
                 population of rock oysters (Saccostrea spp.). The timing of natural oyster recruitment, however, is
                 highly variable, generally seasonal (occurring throughout the warmer months) and is difficult to predict.
                 The fate of the oyster larvae (where they settle) is also not well understood, and the volume of a given
                                                                                                                       44




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 45

                 larval plume may be small. Rapid algal growth and colonisation of newly placed restoration substrates
                 by a range of flora and fauna also competes with the natural recruitment of rock oyster larvae onto the
                 substrate, thus posing some risk to restoration success. The impact of predation on natural oyster
                 recruitment during the larval and young spat stages (by finfish and macro-invertebrates) may also be
                 significant.

                 For these reasons, the project augments, or ‘kick start’ the oyster ecosystem restoration process by
                 adding cured (by desiccation) oyster shell and live oysters to the rock substrate.

                 The cured shell is added as:

                     a. Seeded cultch – cured oyster shell seeded with oyster spat at the Bribie Island Research Centre
                        (BIRC), and placed in voids in the rock substrate,
                     b. Unseeded cultch – cured oyster shell placed in voids in the rock substrate to encourage natural
                        recruitment of oyster spat to the shell and rock,
                     c. Composite substrate – cured oyster shell mixed with rock prior to the rock deployment

                 Live oysters, grown for this purpose in oyster gardens, are also placed in voids in the rock substrate (see
                 Section 5.5: Oyster Cultch for detail).

                 5.3 Shell recycling

                 Oyster shells are collected and prepared for use as part of TNC’s Shuck Don’t Chuck shell recycling
                 project      (see:      https://www.natureaustralia.org.au/what-we-do/our-priorities/oceans/ocean-
                 stories/shuck-dont-chuck-shell-recycling/).

                 Since September 2020, TNC has been collecting and curing oyster shell at the project’s dedicated oyster
                 shell curing site at the Doonan Solid Waste Depot (Figure 5.3). Shell has been supplied in bulk by
                 Mooloolaba Fish Market. She shell is principally half shell from shucked Pacific oysters (Magallana
                 gigas) with an average shell diameter of 60mm. Since March 2021, the project has begun collecting
                 rock oyster half shells from local seafood restaurants in Noosa and adding these to the curing site.

                 Resource Recovery Australia (RRA), who operates a recycling facility at the Doonan Solid Waste Depot,
                 is contracted to TNC to transport the shell from the wholesaler and retailers to the shell curing site.

                 For this purpose, TNC is a registered as a ‘resource provider’ with the Department of Environment and
                 Science, as per the Queensland End of Waste Code - Oyster shells (ENEW07278317) and Waste
                 Reduction and Recycling Act 2011. TNC cures the oyster shell against best practice, in compliance with
                 the Code, and in consultation with DAF biosecurity, who also sits on the project’s Technical Advisory
                 Group.

                 Shell curing occurs against the following protocol:

                    I.    Shell is only cured at the designated and sign-posted shell curing site
                   II.    Clean, shucked oyster shell is collected by the contractor from wholesaler/s, in bulk, in 1 tonne
                          food-safe seafood transport containers and delivered to the shell curing site
                  III.    Pre-washed shell is also collected by the contractor from oyster retailers in Noosa in clean 20
                          litre buckets, and delivered to the designated shell curing site
                  IV.     All containers used for shell transport are thoroughly washed and disinfected before storage
                          and re-use

                                                                                                                         45




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 46

                   V.     At the shell curing site, shell is placed on the ground in rows separated and sign-posted by
                          month collected
                  VI.     The shell is dried and cured (desiccated) in direct sunlight for 6 months, which is two months
                          more than is required by the End of Waste Code
                 VII.     The shell is also turned after three months of curing, as an additional desiccation measure
                 VIII.    Each shell pile is no higher than 1 metre, which further enhances the desiccation process
                  IX.     The site is regularly monitored and maintained to reduce contamination of the shell piles
                   X.     The curing site is in located in an isolated area of the depot, so the risk of contamination from
                          the depot’s other waste management activities is negligible
                  XI.     Once cured, and prior to its removal from the depot, oyster shell may be washed with
                          freshwater to remove any cumulated sediment or dried organic matter, if found
                  XII.    The shell, when needed, is transported in clean containers




                                                                                                        Photos: Craig Bohm




                 Figure 5.3: Oyster shell curing by desiccation in sunlight at shell curing site at the Doonan Solid Waste
                 Depot. Top left, The curing site is located in a remote area of the depot and is well sign-posted.
                 Bottom left, A tipper truck is used to transport the shell onto site. Right, Shell transport contractor,
                 Resource Recovery Australia’s manager, Russell Ping, inspects the September 2020 shell pile at the
                 curing site.




                                                                                                                             46




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 47

                 5.5 Composite substrate

                 A small portion (<20 percent) of the restoration substrates will be a mixture of rock and cured oyster
                 shell as per the specifications. This composite is being used to further explore whether oyster
                 recruitment is enhanced by mixing oyster shell with the rock or not. Restoration scientists generally
                 expect that oyster shell provides chemical cues that may attract oyster larvae to settle on a particular
                 restoration site, but this has not yet been fully tested.

                 The composite mix will comprise up to 10 percent shell. In lower flow locations, such as in Noosa Sound,
                 the proportion of shell may be increased to 20 percent, subject to confirmation of the stability of the
                 structure by engineers. A higher proportion of shell may be considered subject to constructability and
                 monitoring outcomes, as per the specifications.

                 When used as a composite, the cured oyster shell will be evenly mixed through the rock to achieve
                 good interlocking. The shell will not be placed in alternating layers with rock. Mixing will occur in small
                 volumes on the barge immediately prior to placement to avoid shell damage due to rehandling. An
                 example of a rock oyster restoration substrate displaying a mix of rock and shell is given in Figure 5.5.




                 Figure 5.5: An example of rock oyster restoration substrate (augite) augmented with oyster cultch
                 (unseeded) in Port Stephens, NSW. Source: Craig Bohm, TNC.




                                                                                                                         47




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 48

                 5.5 Oyster cultch

                 Seeded and unseeded oyster cultch will be added to the rock substrates in volumes up to 10 kilograms
                 of cultch per metre square of rock substrate as per the specifications. The cultch will be interlocked
                 with rock by hand-placing the cultch into voids to minimise displacement. Oyster shell that is displaced
                 more than 5m from a restoration site, is to be removed in the event that it is resulting in negative
                 impacts.

                 If displaced oyster shell extends more than 5 metres beyond the drawn restoration site, and results in
                 negative impacts to the environment, the displaced shell will be collected by hand, removed from the
                 estuary, or reinstated on the restoration substrate (structure). Shell movement will be monitored six-
                 monthly using visual observation. The risk of shell displacement will reduce over time as the natural
                 oyster bed develops (see Annex 7: Engineering Specifications, Rectifications Table, as provided by ICM
                 engineers).

                 5.6 Hatchery

                 Oyster cultch will be seeded with oyster spat at the Bribie Island Research Centre (BIRC). The cultch will
                 be sourced exclusively from the project shell curing site and oyster brood stock from the Noosa River.

                 The hatchery will be responsible for spawning the oysters and seeding the shell cultch with oyster larvae
                 in ponds configured under controlled hatchery conditions. The hatchery will follow all required
                 environmental and biosecurity protocols and will liaise with government biosecurity offers to confirm
                 those protocols.

                 TNC will be responsible for preparing and supplying the cultch to the hatchery, collecting brood stock
                 from the Noosa River and for the use of the seeded cultch in oyster gardening and deployment onto
                 the restoration substrates in accordance with the conditions of a General Fisheries Permit secured for
                 that purpose.

                 TNC is currently negotiating with the BIRC to provide hatchery services under contract to TNC.

                 5.7 Oyster gardening

                 The project plans to use oyster gardening to further augment the oyster restoration process and to
                 engage with the local Noosa community. In oyster gardening, seeded oyster cultch is supplied by the
                 project to local jetty owners and interest groups, who then grow the oysters in oyster baskets, which
                 are suspended from docks and jetties in the Noosa River.

                 Once the oysters reach a sufficient size, to minimise losses due to predation, the project will remove
                 the oysters and cultch from the oyster gardens and hand place the oysters and settlement cultch into
                 voids in the restoration substrate.

                 Oyster gardening will be a community-led project, with oversight from TNC, and occur under the
                 conditions of a General Fisheries Permit secured for that purpose.

                 TNC has engaged local group the Noosa Integrated Catchment Association (NICA) to help coordinate
                 oyster gardening. The project is already oversubscribed with local jetty owners wishing to be involved
                 in the project (once a permit is secured). Our other partners, Noosa Environmental Education Hub
                 (EEHub) and Noosa Community Biosphere Association (NCBA) who are engaging with local schools and

                                                                                                                        48




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 49

                 the general community about the oyster restoration work, are super excited by oyster gardening and
                 the potential opportunities it affords for local awareness raising and education.

                 Oyster gardeners will be trained and supplied with appropriate equipment and advice and will be
                 registered with the program. The methodology that will be applied is summarised in Table 5.1 below.

                 Table 5.1 Oyster gardening methodology

                  Gardening Steps                    Description
                  1. Community register of           Interested community members register with the project.
                  interest                           Maximum subscription is 40 oyster gardeners.
                                                     Extra gardeners will join a waiting list.
                  2. Potential oyster gardeners      Every potential oyster gardener will be interviewed for physical
                  assessed for suitability by site   ability, suitability of jetty, access, and reason for being involved
                  visit and interview                prior to be invited to participate.
                  3. Selected oyster gardeners       Registration includes:
                  are formally registered with            · Personal and household details and location map
                  the project                             · Number of baskets to be supplied
                                                          · Registration number
                                                          · Permit number
                  4. Oyster gardeners inducted       Project team (NICA+TNC) supplies oyster gardeners with:
                  to the project                          · Oyster gardening guidelines.
                                                          · Rules and obligations, insurances, and permit conditions.
                                                          · Opportunity to participate in a workshop about oyster
                                                               gardening.
                  5. Oyster baskets prepared         Project team prepares oyster baskets with new mooring lines and
                                                     a wash. The baskets have been provided by the Bribie Island
                                                     oyster gardening project.

                                                     The baskets are bio-secure, having been desiccated for 2 years,
                                                     but will be cleaned again with fresh water prior to issuing to
                                                     oyster gardeners.

                                                     Additional baskets will be constructed using the same design, if
                                                     required.

                                                     Oyster baskets, when in operation will be secured at the opening
                                                     with zip ties to prevent loss of seeded cultch.
                  6. Oyster gardening kits           The project team provides each oyster gardener with a gardening
                  prepared                           kit including:
                                                     Gloves, spare rope, tags, zip ties, record sheets, oyster gardening
                                                     guidelines, rules and obligations, copy of liability and insurance
                                                     information, safety guidelines.
                  7. Oyster gardening baskets        Project teams delivers each oyster gardener their kit and baskets
                  and kits distributed to oyster     just prior to, or as they receive their allocation of seeded oyster
                  gardeners                          cultch.
                  8. Oyster gardens are stocked      The project team delivers 5-10kg of seeded oyster cultch per
                                                     basket to each oyster gardener direct from the Bribie Island
                                                     Research Centre and assists the gardener with setting the oyster
                                                     basket/s in place in the river.

                                                                                                                        49




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 50

                  9. Oyster gardeners care for        Oyster gardeners are responsible for:
                  oysters                                · Monitoring of gardens every couple of days and shaking
                                                              the baskets to release pseudo-faeces.
                                                         · Inspecting and hosing down the baskets at least one per
                                                              month (more often in areas where high algal growth or
                                                              sedimentation occurs)
                                                         · Affixing repairs to the mooring lines or baskets, as
                                                              required. Oyster gardeners may seek assistance from the
                                                              project team.

                                                      Oyster gardeners are encouraged to record observations (rate of
                                                      algae growth, interesting species, any wear and tear of gardens).

                                                      The project team will inspect oyster baskets periodically and take
                                                      measurements. Oyster gardeners may assist.
                  10. Records                         Project team will keep accurate records of oyster gardeners,
                                                      contacts, number of baskets, maintenance activities undertaken
                                                      and eventual fate of baskets.
                  11. Decommissioning                 Oyster gardens remain in commission for 6 to 12 months.
                                                      Oyster gardens are then inspected by the project team and the
                                                      oysters and cultch released onto the oyster restoration sites by
                                                      TNC as per the project specifications.
                                                      After the oysters and cult are released, the baskets will be
                                                      collected by TNC/NICA, dried and repaired for future use,
                                                      returned to Bribie Island or disposed of at the Doonan Solid
                                                      Waste Facility.
                  12. Reporting                       Project partner, NICA, is required every 6 months to report to
                                                      TNC on project progress.
                                                      TNC reports twice per year on project progress to agencies.
                                                      TNC remains in close contact with NICA throughout project
                                                      implementation and assists technically with project
                                                      implementation.


                 The oyster gardening techniques applied in Noosa are adapted from the Bribie Island oyster gardening
                 project led by Dr Ben Diggles. Dr Diggles has been consulted during the formation of this project. Dr
                 Diggles has also provided the Noosa project with 70 pathogen free oyster baskets for use in the project.
                 The project also draws on TNC’s success with the mussel gardening in Western Australia
                 (https://www.natureaustralia.org.au/newsroom/mandurah-mussel-gardens/) and with oyster
                 gardening caried out by TNC and its partners in the USA.

                 Shellfish gardening is practiced worldwide, and the methodologies are simple, safe and prevent the
                 spread of disease through simple design and tried and tested methodologies and sound record
                 keeping12. An example of a rock oyster garden that will be used in Noosa is presented in Figure 5.5.



                 12
                   Examples: TNC’s major mussel gardening project in the Peel/Harvey Inlet, Western Australia with over 100
                 mussel gardeners engaged (see: https://www.natureaustralia.org.au/what-we-do/our-priorities/oceans/ocean-
                 stories/shellfish-garden/); the Restore Pumicestone Passage community alliance who recently ran a successful
                 oyster and mussel gardening project on Bribe Island (see http://restorepumicestonepassage.org/oyster-
                                                                                                                           50




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 51

                 Figure 5.5: An example of oyster gardening bag stocked with seeded oyster cultch and ready for
                 deployment and grow out under a jetty on Bribe Island as part of the Save Pumicestone Passage project.
                 Source: Ben Diggles, Digfish Services.




                 gardening/); the Maryland Oyster Gardening Program in Chesapeake Bay, USA (see https://www.cbf.org/how-
                 we-save-the-bay/programs-initiatives/maryland/oyster-restoration/oyster-gardening).
                                                                                                                       51




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 52

                 SECTION 6 – CONSTRUCTION
                 Construction standards applied in this project align with shellfish restoration best practice and the
                 Society for Ecological Restoration (SER) International Principles and Standards for the Practice of
                 Ecological Restoration global guidelines6.

                 The construction methodology described here has been successfully employed by TNC construction
                 contractors in shellfish restoration projects in Port Philip Bay (VIC), Adelaide (SA), Albany and Swan River
                 (WA). This methodology was also employed by the Department of Primary Industries (DPI) for the
                 restoration of rock oyster ecosystems in Port Stephens, NSW. TNC also has 25 years of experience in
                 utilising similar deployment methodologies in projects throughout the United States.

                 6.1 Methodology

                 The construction contractor engaged to handle and deploy the restoration substrate will have
                 experience with tidal works in the Noosa River, or similar sized estuaries, and preferably have
                 experience with shellfish restoration projects.

                 The contractor will acquire and manage the rock substrate from its source to its deployment. TNC will
                 supply the cured oyster shell to be used as a composite mixture with rock.

                 The contractor will stockpile the rock at an agreed load out site, selected with Noosa Shire Council, and
                 managed in accordance with the Site Management Plan and Construction and Environmental
                 Management Plan (CEMP), which meets with permit conditions.

                 In the appropriate weather window, related to suitable construction safety and operational
                 requirements (so as to avoid any potential damage to the receiving environments as well as staff), the
                 contractor will load the substrate onto a small barge from the load out site, transport the substrate to
                 the restoration site, and deploy the substrate onto site using an excavator (Figure 6.1).

                 Where a composite of rock and shell is used, the contract will mix this on the barge immediately prior
                 to placement to avoid shell damage due to rehandling (unless another method which achieves the same
                 objective is identified). The contractor will lay the substrate in configurations and clearances specified
                 for the site.

                 The first deployment of substrate will be closely supervised by the TNC monitoring team and the
                 configuration of the substrate inspected, in-water, to confirm accuracy of placement. Once TNC is
                 satisfied with the accuracy and appropriateness of the deployment technique, the contractor will be
                 permitted to continue with the deployment and subsequent deployments.

                 The contractor may use GPS, site markers or similar equipment to accurate mark the depositional sites.

                 The deployment barge only anchors at the restoration site where the minimum distance specifications
                 for marine plants, marine habitats and infrastructure can be met. Sediment plumes are managed in
                 accordance with the management protocol outlined in Section 6.4: Sediment management.

                 Once restoration substrates are in place, and signage and aids to navigation installed, authorities are
                 notified and accurate ‘as constructed’ drawings with RPEQ certification are provided as per permit
                 conditions.


                                                                                                                          52




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 53

                                                                                                         Photos: Kirk Dahle




                 Figure 6.1: The contractor using a shallow-draft barge and excavator to carefully position restoration
                 substrate onto site Port Stephens, NSW. The barge operator uses sponsons to orient the barge,
                 sometimes only setting one sponson, and marker stakes, to help guide the substrate placement. Source:
                 Kirk Dahle, DPI NSW.

                 6.2 Responsibilities

                 The contractor will be responsible for:

                     o    Ensuring they have access to the equipment of the appropriate size for operating in the Noosa
                          River estuary, experience with rock construction in the Noosa River estuary, or other
                          constrained estuaries, and preferably will have had exposure to ecological restoration work in
                          the past.
                     o    Acquiring the rock as per the specifications and stockpiling it at designated load out site.
                     o    Managing the oyster shell to be used in the composite mix at the stockpile site.
                     o    Developing and implementing a Site Management Plan for the stockpile and Construction and
                          Environmental Management Plan (CEMP). These will be approved by TNC and meet with any
                          permit conditions, prior to the commencement of works.
                     o    Managing all site marking, load out processes, material transport, works and signage at the
                          restoration site until such time as the restoration substrates are laid and configurations and
                          positions of substrates against the plans are confirmed by engineers as meeting permit
                          conditions.
                     o    Undertaking all construction monitoring, compliance and reporting against permit conditions.
                     o    Posting all construction notifications will be as per permit conditions. TNC will augment these
                          notifications with public media and social media announcements.




                                                                                                                              53




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 54

                 6.3 Impact Minimisation

                 All works undertaken will minimise disturbance to marine plants during and after the construction
                 phase. Any impact to marine plants will be temporary. Any use of temporary equipment, such as
                 sediment curtains, will be placed to avoid contact with marine plants or the impediment of fish passage.

                 Table 6.1 presents an assessment of the actions, impact minimisation actions and alternatives
                 considered.

                 Table 6.1: Impact minimisation actions and alternatives considered

                  Action               Impact minimisation (environmental +           Alternatives considered
                                       social)
                  Site selection       Site selection guided by Restoration Zones     Areas unsuitable or inappropriate for
                                       and Restoration Suitability Modelling and      oyster restoration are excluded by the
                                       extensive associated use of minimum            selection and consultation processes.
                                       distances to minimise negative impact of
                                       construction or restoration substrates,
                                       once established, on marine species and
                                       habitats, navigation, built infrastructure
                                       and river access.

                                       Extensive liaison and formal consultation
                                       processes are used to ensure planned
                                       actions meet with community
                                       expectations.
                  Restoration          Only locally occurring igneous or              Rock oysters are opportunists and will
                  materials            metaphoric rock is selected as the primary     grow on rock, rubble, mangrove roots,
                  selection            restoration material, as per the design        oyster shell (etc) and artificial
                                       specifications. This material optimises        substrates such as tin, concrete, steel.
                                       ecological and physical performance,           The project objective is to restore
                                       while minimising risk of introducing           oyster ecosystems by providing an
                                       foreign materials and pathogens to the         ecologically (and engineered) design
                                       river.                                         which mimics natural foundations of
                                                                                      oyster ecosystems. The project
                                       To minimise contamination, the rock may        therefore employs locally occurring
                                       be treated prior to deployment by              natural materials.
                                       cleaning with freshwater, if contamination
                                       (most likely lose soil) exceeds 50 percent     Oyster shell piled on the riverbed or
                                       coverage of each rock per given volume.        placed in bags or cages placed on the
                                                                                      riverbed are, by design, artificial
                                       Oyster shell and oyster shell cultch will be   structures, thus introducing artificial
                                       treated as per the QLD End of Waste –          materials and shapes to the estuary.
                                       Shell Code, and pre-washed prior to use.       Such materials and shapes may select
                                                                                      for certain species mixes or
                                       Live oysters will be handled and deployed      abundances, which may not naturally
                                       as per conditions of a General Fisheries       occur in the estuary. The bag material
                                       Permit secured for that activity.              may exacerbate sedimentation and
                                                                                      achieving relief to counter
                                                                                      sedimentation challenges is difficult

                                                                                                                            54




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 55

                                                                                    and further distorts any potential
                                                                                    natural character of the substrate.

                                                                                    Placing shell in cages, which
                                                                                    decompose by rusting over time, may
                                                                                    allow time for oyster shells to cement
                                                                                    together by natural biogenic
                                                                                    processes, prior to the supporting
                                                                                    cage structure disappearing. However,
                                                                                    this design is yet to be fully tested and
                                                                                    is possibly best suited for sub-tidal
                                                                                    environments where the biogenic
                                                                                    structures are not subject to high
                                                                                    current and wave energy, which may
                                                                                    cause movement or erosion of the
                                                                                    biogenic reef structures.

                                                                                    Not augmenting the restoration
                                                                                    substrate with oyster shell and seeded
                                                                                    oyster cultch and live oysters risks
                                                                                    slow ecological recovery, or possibly
                                                                                    low recruitment due to the variable
                                                                                    nature of oyster recruitment.
                  Substrate            Substrates are designed to maximise          Alternative configurations could
                  design               stability, durability, rugosity,             include larger substrate footprints of
                  engineering          heterogeneity, prevent impediment to         continuous rock, but such structures
                                       fish passage, avoid pooling, minimise        would likely affect river flow, may
                                       wave refraction, and erosion of              create barriers to fish passage,
                                       shorelines.                                  enhance the erosion potential and
                                                                                    sediment accretion potential of the
                                                                                    substrates to the adjacent shoreline
                                                                                    and shoreline upstream and
                                                                                    downstream of the restoration site.

                  Works                The construction contractor will be          The work methods are standard
                  methods              responsible for all works, from material     practice which are refined for each
                                       storage and load out to construction,        estuary situation. Work methods are
                                       construction monitoring, risk                adaptively refined, if required, but the
                                       management and reporting.                    conservation of existing habitats is
                                                                                    paramount to the methods.
                                       The contractor will operate in accordance
                                       with the specifications in this plan, Site   The use of larger deployment
                                       Establishment and Management Plan and        equipment, deployment of smaller
                                       Construction and Environmental               amounts of substrate but this is
                                       Management Plan (CEMP) and all relevant      neither economically efficient nor
                                       permit conditions.                           enables the project to meet minimum
                                                                                    restoration targets in an effective
                                       Substrate deployment is timed to coincide    timeframe.
                                       with periods of the highest natural oyster


                                                                                                                           55




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 56

                                       recruitment in the estuary. This period      Winter deployment considered
                                       falls over the summer months.                possible but the risk of the substrate
                                                                                    being covered with algae and non-
                                       Sediment plumes associated with the          habitat forming species is assessed as
                                       works will be as per the protocol outlined   high and not desirable.
                                       in Section 6.4: Sediment management


                 6.4 Sediment management

                 Sediment plumes associated with restoration works may impact on seagrass and are principally caused
                 by using substrates (rock /shell) fouled with loose organic and inorganic matter collected by the
                 substrate in its acquisition from the quarry, during storage at the load oust site, or during handling and
                 deployment onto the barge. The resuspension of river sediments caused by the placement of the rock
                 on site may also be an issue but would be temporary and may be insignificant in comparison to the
                 generally very high background suspended sediment load of the estuary.

                 The construction contractor will be required to implement the following sediment plume minimisation
                 protocol and must incorporate this into the Construction and Environmental Management Plan (CEMP).

                 The protocol includes the following:

                     o    Preferential selection of rock from the quarry with minimum fracking (if possible).
                     o    Organising the transport of rock to minimise contamination from lose material.
                     o    Washing the rock prior to use, preferably at the quarry, if the rock is contaminated with loose
                          material is greater than 50% by area.
                     o    Managing the rock at the load out site to minimise significant fouling by ground sediments, if
                          detected. This may include measures such as laying a bed of gravel on which the rock sits at
                          the load out site, loading rock directly from the truck onto the barge, minimising the movement
                          of barge equipment on and off the barge to avoid contamination from the tracks of the
                          equipment.
                     o    Washing oyster shells prior to mixing this into a composite substrate with rock. Washing will
                          occur at the Doonan Solid Waste Facility.
                     o    Deploying the rock on site by placing it on site carefully, rather than dumping it off the side of
                          the barge, if plumes are caused.
                     o    Inspection and physical marking of the seagrasses in closest proximity to the site is to be
                          undertaken prior to commencement of works. During works visual monitoring of the sediment
                          plume is to be undertaken. Where the visible plume extends to within 5m of seagrass beds,
                          turbidity monitoring is to be undertaken.
                     o    The extent and duration of the anticipated sediment plume is such that mangrove species are
                          unlikely to be impacted and do not require monitoring unless significant sediment plumes are
                          observed.

                          If seagrass remains at risk of sediment smothering (if turbidity monitoring indicates turbidity
                          (NTU) is more than 10% above background), then employ a combination of the following:

                     o    Deployment of silt curtains around the seagrass beds, or in close proximity to the restoration
                          site and/or,

                                                                                                                         56




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 57

                     o    Deploy substrate down current of the seagrass bed (e.g. on a falling tide for seagrasses located
                          upstream of the works), or within an hour of high or low tide (slack water).
                     o    Ensuring silt curtains do not interact with marine plants and are deployed for the absolute
                          minimum possible soak time required to achieve the rock deployment at the site.
                     o    Constant monitoring of the silt curtains to ensure they to not move and interact with marine
                          plants, impede fish passage or impose unreasonable imposition on other waterway users.
                     o    Review substrate handling protocols and enhance the substrate cleaning/preparation efforts
                          until plumes are minimised.
                     o    Review construction operations procedures and amend as required to minimise potential for
                          impacts.
                     o    Consider implementing additional operational measures.
                     o    Inspect the seagrass beds to determine if there is evidence of sediment smothering compared
                          to pre-works inspection.
                     o    Report any impacts on seagrass to authorities as per permit conditions.



                 6.5 Load out site management
                 The proposed load out site is at the western end of Hilton Esplanade, Noosaville (figure 6.5). The load
                 out site is configured in two sections leaving sufficient space for recreational boaters and commercial
                 companies to access the shoreline (Figure 6.5b). The 15.4m long exclusion line between the two
                 sections is to separate the movement of rock between the two sections from boaters using the
                 shoreline. This section will be managed by the contractor using traffic cones, NOT fencing. The cones
                 will be removed when there is no movement of material between the two sections.




                                                                                                                       57




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 58

                 Figure 6.5: Location of proposed load out facility located at the end of Hilton Esplanade, Noosaville

                 The site will be managed by the project’s contracted construction company that is experienced with
                 this work, having previously been contracted to the Department of Primary Industries in NSW to
                 undertake a similar intertidal shellfish restoration project.

                 The operational parameters for the site are presented in Table 6.2.

                 Table 6.2 Operational parameters

                    Parameter          Proposal

                    Timeframe:         February – April 2022 subject to permits

                    Duration of use:   40 days including mobilisation, demobilisation and potential stand down days

                    Management:        Contracted commercial construction company

                    Site area:         Exclusive use of 540m2 of road reserve (350m2 at high tide) at the end of
                                       Hilton Esplanade (Figure 6.5b)

                                       Load out area A = 300m2 area (150m2 at high tide)

                                       Load out area B = 200m2 area

                                       Load out area connection = 40m2

                                       Area A is primarily for rock and equipment loading/unloading operations in
                                       association with the barge.

                                       Area B is primarily for rock and equipment storage.

                                       The load out area connection creates a safe fenced corridor for the movement
                                       of the Posi-track loader between Areas A and B.

                    Nature of uses:    Movement of up to 7 commercial trucks per day to the site to delivery
                                       porphyry rock.

                                       Storage of up to 90m3 of rock (150mm to 500mm diameter) per day

                                       Loading of rock and dried oyster shell onto the barge using an excavator +
                                       Posi-track

                                       Storage of loading ramps, vehicle and heavy equipment

                                       No chemicals, fuels or liquids will be stored at the site.

                    Frequency of       12 hour/day operational. 6am to 6pm including site management.
                    use:
                                       Expected up to 7 truck movements per day along Hilton Esplanade to deliver
                                       rock to the load out site per day.

                                       Barge will ferry rock to restoration sites as needed from the load out facility
                                       with expected 2- 5 loadings per day subject to tides.


                                                                                                                         58




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 59

                    Public access:     A dual carriage way with a minimum of 8m width will be maintained to allow
                                       access to the boat ramp along Hilton Esplanade.

                                       A dual public boat launch area 12m wide will be maintained along the
                                       shoreline. Note that the formal dual boat ramp at Tewantin is 10m wide.

                                       Adequate vessel reversing area will be maintained between site areas A and B.

                                       Access to Hilton Esplanade from Hilton Terrace via the pathway leading from
                                       Hilton Terrace will be maintained.

                                       Commercial operators wishing to use the ramp may negotiate temporary
                                       access to the shoreline directly with the project’s construction contractor.

                    Public safety:     Load out site areas A and B will be fenced using commercial fencing as will a
                                       2.5m corridor joining areas A and B.

                                       Signage will be used on the fencing to inform the public about the site, its
                                       purpose and cautions.

                                       The barge will only come ashore within site area A.

                                       The construction company will use standard traffic control methods to ensure
                                       the public is separated from truck movements at the end of Hilton Esplanade
                                       and operations between site area A and B.

                    Public             A public notification regarding the works will be printed in the Noosa News
                    notifications      two weeks prior to commencement of activities.

                                       An announcement will be made in the Noosa Council’s circular.

                                       Relevant authorities will be notified of works prior to commencement.

                                       Public notification signage will be posted at the site and will include a QR code
                                       which connects to online information about the construction process:
                                       Timeframe, purpose, activities, further information.

                                       Tourism facilities adjacent to the site will be specifically notified and met with
                                       to explain the work schedule.

                    Noise              Truck movements and barge loading will take place between 7am and 6pm
                    management:        weekdays, and between 8am and 5pm on weekends.

                    Environmental      Trees will be protected from harm from machinery and fencing. Fencing will
                    management:        be placed at a distance from the tree line and visible tree roots will be
                                       avoided.

                                       The site will be kept clear of debris/refuse.

                                       The site will be rehabilitated to its pre-use condition or better.




                                                                                                                            59




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 60

                 SECTION 7 – SIGNAGE + AIDS TO NAVIGATION
                 TNC proposes the installation of moderate signage and essential aids to navigation. To improve visual
                 amenity, the signs may be placed on top of navigation markers, rather than being standalone signs on
                 pole structures. TNC is working with MSQ to refine signage for each site and possibly at boat ramps.

                 If independent signposts are installed, they would be erected in bare sediment close to the oyster reef
                 patches. Moorings for any buoys used for navigation purposes would also be places onto bare sediment
                 but close to the oyster reef patches. Signage is suggested as per the specifications given (see Figures
                 7.1 and 7.2) but we would prefer smaller signage, if agreeable to MSQ and other agencies. The size of
                 the signs given here can be amended.

                 Navigation aids will not impact on tidal fish habitats or marine plant communities and will be positioned
                 or configured to avoid the risk of trimming of marine plants e.g., seagrasses.

                 The suggested wording for signage includes text for restoration sites inside and outside of the declared
                 fish habitat areas. The wording of the signage; however, could be more ‘public friendly’ and if
                 permitted, will design this in contact with local MSQ, DAF and NSC offices. The signage also does not
                 have to be Noosa Councils specific.

                 The suggested signage includes a recommendation for the public not to consume oysters from the
                 restoration sites. While it is legal to eat wild oysters, some oysters on the restoration sites will be
                 derived from oyster culture and oyster gardening. These oysters will not settle naturally on the site and
                 may be selected by the public for consumption. Human consumption of these oysters introduces
                 increased risk to TNC, as the project lead. Appropriate signage can reduce the risk to consumers while
                 also limiting TNC’s liabilities associated with food poisoning from eating contaminated oysters.
                 Reducing losses of oysters from the restoration sites, due to collection, is an additional benefit.

                 The signage suggested here has been engineered and is RPEQ certified (Registered Professional
                 Engineer of Queensland) and the certification presented in Figure 7.3. The signs are re-purposed from
                 the previous Noosa Oyster Restoration Trial Project implemented between 2016-2020 by the University
                 of the Sunshine Coast (USC) and Noosa Biosphere Reserve Foundation (NBRF). The signs were removed
                 from the Noosa River in 2020, as per permit conditions for that project, and gifted to TNC for use in this
                 project.

                 Two of these signs have already been repurposed to mark the oyster shell curing site at Doonan Solid
                 Waste Depot (refer to Section 6, Figure 6.3). The signboards, brackets and poles are in near new
                 condition and will not be modified in any way part from changing the wording as per permit conditions.
                 The poles will be cleaned of any lose material and disinfected prior to re-deployment. The signboards
                 and brackets have been stored well and are in clean and good working order.

                 TNC may also place temporary signage at boat ramps, at least during the construction phase, to better
                 inform river users of the construction activity being undertaken.

                 TNC proposes the use of SL – B600 marker buoys (Figure 7.4) as suggested by MSQ as the appropriate
                 aid to navigation (underwater obstruction). One buoy may be placed at each end of a restoration site,
                 and in the middle, but this will be confirmed formally with local MSQ prior to aid selection and
                 deployment.



                                                                                                                        60




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 61

                 Aids to navigation and signage shall be placed in close association with the substrate footprint and
                 positioned to minimise impacts on marine plants and habitats. Signage and aids to navigation installed
                 by a qualified contractor and removed as per permit conditions. Once positioned, signage and aids to
                 navigation will be included with ‘as constructed’ drawings of the restoration substrate footprints and
                 submitted to authorities, as per permit conditions. Signage and aids to navigation will be maintained,
                 removed or relocated during the permit period, as required with the written direction of authorities.




                                                                                                                    61




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 62

                 Figure 7.1: Signage specifications proposed for restoration sites that occur in declared fish habitat
                 areas. Signage includes preferred wording.



                                                                                                                         62




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 63

                 Figure 7.2: Signage specifications proposed for restoration sites that occur outside declared fish
                 habitat areas. Signage includes preferred wording.




                                                                                                                      63




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 64

                 Figure 7.3: Signage was previously certified by a Registered Professional Engineer of Queensland
                 (RPEQ Certification) and will not be modified from the engineered specifications for use in this
                 project.




                                                                                                                    64




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 65

                 Figure 7.4: Proposed Aid to Navigation – SLB600 Marker Buoy as suggested by Noosa MSQ. Source:
                 SPEC_SL-B600.pdf (sealite.com).




                                                                                                                  65




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 66

                 SECTION 8 – PERFORMANCE MEASURES
                 The objectives of the performance management framework are to:

                          •    Maximise public safety
                          •    Maintain visual amenity of the Noosa River (through optimal signage)
                          •    Enact environmental safeguards to protect marine plants and natural processes
                          •    Monitor for potential erosion
                          •    Monitor and manage community feedback or complaints
                          •    Ensure contingency measures are in place

                 8.1 Public Safety

                 The key hazards associated with public safety at the restoration sites during construction and site
                 management, their likelihood and consequence, and proposed treatment are presented in Table 8.1.
                 Public safety is further analysed and presented in Annex 8: Safety in Design Report.

                 Table 1: Primary hazards of restoration substrates to public safety and their treatment

                  Hazard                    Likelihood Consequence Treatment

                  Physical interaction      LOW         MEDIUM          Gaps around oyster reef patches to be 1m-4m
                  with the restoration                                  at seabed. Rock stable under its own weight
                  substrate (Monitoring                                 and by interlocking of material. Oyster shell to
                  Personnel or Public)                                  be placed towards the middle of individual
                                                                        reef patches to minimise potential of
                                                                        displacement from structure. Works to be
                                                                        appropriately signposted in consultation with
                                                                        MSQ. Works to be certified by a coastal
                                                                        engineer on completion as conforming with
                                                                        the specifications.
                  Works pose a risk to      LOW         MEDIUM          Oyster reef patches laid as per specifications
                  navigation                                            and locations selected with wide consultation
                                                                        and MSQ input. Restoration sites marked as
                                                                        per MSQ requirements.

                                                                        Public information products imbedded locally
                                                                        through public and social media to advise of
                                                                        site locations and hazards including signage at
                                                                        boat ramps or as directed by authorities.
                  Works pose a risk to      LOW         LOW             Restoration sites selected to avoid all known
                  public access to river                                shoreline access points. No works within 10m
                  shoreline                                             either side of a public park, shoreline beach
                                                                        (of any size) or shoreline or within 30m of a
                                                                        pontoon or jetty. No site directly adjacent to
                                                                        shoreline houses or public or commercial
                                                                        facilities.




                                                                                                                      66




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 67

                                                                        Gaps between the oyster reef patches gives
                                                                        direct access to shorelines to small and
                                                                        medium vessels (e.g. kayaks, tinnies).

                                                                        Position of works clearly marked with signage.
                  Members of the            LOW        HIGH             Consumption of oysters in the Noosa River
                  public eating oysters                                 expected to be low but may change.
                  from the oyster beds
                  possess health risk                                   Project signage to discourage oyster
                                                                        consumption at restoration sites. Project
                                                                        brochure, online Q&As and project media
                                                                        encourages consumers to purchase oysters
                                                                        from seafood suppliers, thus supporting local
                                                                        business and reducing risks to health from
                                                                        consumption of wild oysters.
                  An oyster bed cause       LOW        MEDIUM           Coastal fringes and property upstream and
                  erosion to                                            downstream within 100m of a given
                  infrastructure such as                                restoration footprint monitored for signs of
                  to cause risk to public                               erosion visually every 6 months and by a
                  safety                                                comparison of images every 12 months.

                                                                        Significant erosion directly attributable to
                                                                        restoration works will be remediated in
                                                                        consultation with authorities. See Section 8.6
                                                                        Contingency Plan


                 8.2 Visual amenity

                 Maintaining the visual amenity of the Noosa River estuary is important to many river users. The project
                 therefore aims to minimise its impact on the visual amenity value of the river during construction and
                 management of the restoration sites.

                 The project’s potential threats to visual amenity and prescribes treatments and rationale are outlined
                 in Table 8.2.

                 Table 8.2: Threat of oyster restoration to visual amenity and their treatment

                  Threat                          Likelihood Consequence Response

                  Oyster bed construction,        MEDIUM      MEDIUM          Optimise Construction Environmental
                  monitoring and                                              Management Plan (CEMP) to minimise
                  maintenance works                                           noise, dust and disruption to river users
                  generate public complaints
                  or vandalism due to impact                                  Public notifications as per
                  on visual amenity (or                                       requirements.
                  undefined reasons)
                                                                              Public awareness actions about the
                                                                              project purpose and activities produced
                                                                              and distributed (brochure, fact sheets,

                                                                                                                      67




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 68

                                                                                news articles, radio interviews, website
                                                                                and social media presence).

                                                                                Public complaints record, feedback and
                                                                                reporting mechanism operationalised.
                  Signage and aids to            MEDIUM        LOW              Signage and aids to navigation
                  navigation generate public                                    monitored monthly. Signage and aids to
                  complaints or vandalism                                       navigation managed as per Section 8.6
                  due to impact on visual                                       Contingency plan
                  amenity
                  Sediment plumes caused by      MEDIUM        MEDIUM           Sediment management measures
                  construction or                                               implemented as per Section 6.4
                  maintenance works                                             Sediment management


                 8.3 Environmental performance and safeguards

                 Maintaining environmental safeguards during the site management phase, when oyster beds are in the
                 process of growing, is fundamental. These safeguards are presented in Table 8.3 as part of the projects
                 Monitoring, Evaluation and Reporting (MER) system.

                 The project also maintains a separate comprehensive MER plan for the project. The MER Plan
                 encompasses a wide range of ecological, social and economic parameters and reporting
                 responsibilities. The subset presented in Table 8.3 are the key MER performance measures relevant to
                 this application. These will be augmented with any subsequent additional permit conditions as
                 required.

                 Table 8.3: Environmental safeguards

                  Performance Objective Monitoring                     Frequency of              Corrective action
                                           Method/Target                   Monitoring            (where performance
                                                                                                 objective not met)
                  1. Restoration bed stability
                  Oyster restoration         Visually inspect oyster   After deployment (to      Any restoration
                  substrate remains          restoration substrates    ensure conformity to      substrate that moves
                  within a restoration       and record the precise    the restoration plan).    out of the designated
                  site                       GPS position and size                               restoration site will be
                                             of each.                  After every 6 months      rectified as per the
                                                                       in the first year, then   specifications. See
                                           Use GIS software to         once every year for       Annex 7: Engineering
                                           contrast the position,      the following two         Specifications
                                           footprint, size and         years.
                                           area of each                                          Any shell added to a
                                           restoration substrate                                 restoration site also
                                           between monitoring                                    monitored.
                                           events and assess any
                                           potential movement.
                  2. Oyster recruitment – ecosystem formation
                  Oysters and associated Measured against              After every 6 months      Substrate height
                  sessile benthic          benchmark: %                in the first year, then   adjusted to optimise
                                                                                                                         68




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 69

                  invertebrates recruit   Recruitment >             once every year for    oyster recruitment, as
                  to the restoration      mortality (count/m2)      the following years.   per specifications. See
                  substrates10            per restoration site                             Annex 7: Engineering
                                                                                           Specifications –
                                          Within 6-8years:                                 Rectifications Table

                                          Density of rock oysters                          Seeded oyster cultch
                                          at restoration site                              and live oysters added
                                          average of > 200                                 to rock substrate to
                                          individuals/m2                                   augment recruitment
                                                                                           as per specifications.
                                          4+ age classes of rock                           Substrate height
                                          oysters present at                               adjusted to optimise
                                          restoration site (=                              oyster recruitment, as
                                          approx. 2 cohorts of                             per specifications. See
                                          oysters reproductive)                            Annex 7: Engineering
                                                                                           Specifications
                                          > 5% of rock oyster
                                          population at the site
                                          is 3+ years old

                                          Increased density of
                                          oyster recruits with 3-
                                          4 reproductive cycles

                                         5 times more epifauna
                                         on oyster habitat than
                                         on surrounding
                                         sediment
                  3. Community use and enjoyment of oyster restoration sites
                  Oyster beds do not     Visually monitor         Ongoing - report         Maintain complaints
                  significantly impact   community use of the significant complaints       mechanism as per
                  community safety,      restoration sites        or incidents to          Section 8.5 Complaints
                  access and/or use of                            authorities              management
                  the Noosa River        If a site needs closer
                  estuary including Fish monitoring, as           Annually - report        Modify oyster reef
                  Habitat Areas.         directed by a public     feedback received and    patch/es or signage,
                                         authority, then the      responses in project     aids to navigation as
                                         project will establish a report                   per Section 8.6
                                         specific action for that                          Contingency plan
                                         purpose.
                                                                                           Report feedback and
                                          Maintain records of                              adaptive management
                                          partner or community                             responses in the
                                          feedback and reported                            project annual report.
                                          evidence of substrate
                                          or signage vandalism
                                          or vessel strike.

                                          Records will include:
                                                                                                                   69




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 70

                                          i. Number and type of
                                          compliant received

                                          ii. The types, number
                                          and severity of any
                                          acts of wilful
                                          vandalism

                                             iii. The type and
                                             severity of any boat
                                             strike
                  4. Additional potential affects
                  Deleterious interaction Adopt minimum             Prior to deployment of     Modify oyster reef
                  with marine plants         distances between      substrate check for        patches as per Section
                                             mapped marine plants   marine plants visually     8.6 Contingency plan.
                                             and construction       at the site and adjust
                                             works as per the       works to avoid, if         Report changes in
                                             specifications         marine plants found        associated plant
                                                                                               communities and
                                                                    Post deployment            remediation actions in
                                                                    survey and mapping of      annual report.
                                                                    ‘as built’ structures in
                                                                    relation to marine
                                                                    plans and submit to
                                                                    authorities with RPEQ
                                                                    certification

                                                                    Annually - monitor
                                                                    changes in nearby
                                                                    plant communities




                                                                                                                    70




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 71

                 8.4 Erosion control

                 TNC’s consultant engineers have confirmed:

                 The purpose of these works is not to provide erosion protection but to restore rock oyster ecosystems
                 throughout the Noosa River.

                 Natural erosion can be the result of tidal or flood flows, but in many locations within the Noosa River
                 erosion is strongly influenced by wind waves and vessel wake. Hard structures have the potential to
                 result in reduced (or increased) erosion because of changes to river flows or wave action, changes to
                 sediment transport patterns as well as end effects. Hard structures can also result in shoreline
                 protection that reduces erosion.

                 Even though the works are not intended to provide erosion protection, the nature of the works are
                 generally expected to result in reduced severity of coastal erosion adjacent to the structures. The oyster
                 reef patches in this project are engineered to reduce any potential for these structures to result in
                 increased erosion of adjacent shorelines, including shorelines upstream and downstream of the works.

                 Features of the oyster reef patches (the works) that consider coastal processes include:

                 Concept module layout - Concept Layouts 2 & 3 (segmented longshore modules) show how oyster reef
                 patches are configured to minimise impacts to littoral drift and coastal processes by being aligned with
                 river flows and providing gaps between oyster reef patches. Despite this, the oyster reef patches are
                 anticipated to act as a segmented reef and provide some sheltering to the shoreline from wave action
                 and vessel wake and result in reduced erosion. Reef has been segmented to limit this impact and allow
                 penetration of waves and flows without resulting in pockets of increased erosion.

                 Concept layout 1 provides habitat that extends out perpendicular from the shore similar to observed
                 development of oyster reef habitats. This layout is only suitable in locations with low sediment
                 transport and not within Restoration Zone 1 Main Channel. In these locations there is limited risk of
                 the works acting as a submerged groyne, which would have the potential to impact on littoral drift,
                 erosion, and accretion patterns (as well as result in undesirable burial of sections of the structure).

                 Shaped oyster reef patches – Oyster reef patches may be curved or shaped to reflect the local
                 bathymetry and site-specific conditions. Alignment with the shoreline or directing flows away from
                 the shoreline reduces the potential for focussing of tidal or flood flows. Tapering of the reef ends
                 reduces the potential for flow disturbances (such as eddies) to develop.

                 Crest level – Crest levels are dictated by desirable water depths for the target species and do not extend
                 above MHWS. As with many natural oyster reefs, they are exposed during lower tides and inundated
                 during higher tides (or flood events). When water levels are close to or over the crest of the reef, wave
                 action and vessel wake would be expected to overtop the structure. As such, wave energy reaching the
                 shoreline (especially for Layout 2 & 3) will be reduced but not eliminated. While natural erosion may
                 continue to occur, it is expected to be reduced.

                 Access space – The provision of an access space facilitates monitoring of the reef habitat, but also
                 provides space for natural flows to occur between oyster reef patches.

                 Porous rock substrate – waves impacting with the substrate are dissipated into the voids in the
                 substrate, with reduced wave energy impacting on the adjacent shoreline and reduced wave reflection
                 compared with solid structures.
                                                                                                                        71




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 72

                 Engineering design by coastal specialist – Final oyster reef patch layout is to be confirmed by the
                 certifying coastal engineer post construction. For Phase 1 sites, this is undertaken by International
                 Coastal Management. For Phase 2 sites, this is a requirement prior to construction (refer Drawing
                 NROR-2021-02 note 1.6).

                 Erosion monitoring and mitigation

                 The restoration sites, as well as shoreline 100m upstream and downstream of the sites, will be
                 monitored visually every 6 months to check for signs of exacerbated shoreline erosion. Every 12
                 months, photographs will be used to compare changes in the shoreline shape. Where significant
                 erosion is detected and is directly attributable to the presence of the restoration works, remedial
                 actions will be undertaken in consultation with authorities, such as the modification of the height or
                 form of related oyster reef patches to reduce the erosion hazard (see Section 8.6 Contingency plan).

                 8.5 Complaints management

                 TNC has developed a self-explanatory project brochure and answers to Frequently Asked Questions
                 about the project. TNC has also published and distributed site maps and will disseminate information
                 about the construction and most construction management phase via mailouts. These are also made
                 widely available via the TNC website - see https://www.natureaustralia.org.au/what-we-do/our-
                 priorities/oceans/ocean-stories/noosa-river/noosa-faqs/ and will be promoted through project
                 partners and authorities to help spread information about the project and thus help to manage
                 inquiries.

                 TNC, as the project lead, will manage the response to all complaints in liaison with relevant authorities
                 as well as the contracted construction company. The rating and intended responses to complaints is
                 given in Table 8.5. The complaints record keeping system is as per Table 8.5a.

                 Complaints and responses will be included, in general terms, in annual reports. Relevant agencies may
                 access the detail of complaints, as per tables.

                 Table 8.5: Complaint rating and response

                  Complaint            Nature                           Response                    Timeframe
                  severity
                  Low                  General concerns and             Phone call and/or email     Within 48 hours
                                       questions about project          response giving
                                       activities, timeframes or        response or source of
                                       details.                         information.

                                       General inquires not directly    Refer to appropriate
                                       related to the project           agency
                  Medium               Concerns related to specific     Phone call and/or           Within 24 hours
                                       project actions and impact on    formal written response
                                       visual amenity or environment,   depending on nature.
                                       as they occur
                                                                        Consultation with
                                       Specific complaints about the    relevant agencies
                                       project in general               regarding the response,
                                                                        if required.

                                                                                                                       72




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 73

                                                                              Additional actions, as
                                                                              required
                  High                   Concerns that a specific project     Phone call and/or         Within 12 hours
                                         activity is posing an immediate      formal written response
                                         and significant threat to life,      depending on nature.
                                         property or natural
                                         environment                          Consultation with
                                                                              relevant agencies
                                                                              regarding the response,
                                                                              if required.

                                                                              Additional actions, as
                                                                              required


                 Table 8.5a: Complaints Record Management

                  Details of Plaintiff         Description of               Severity             Response/s
                                               Complaint
                  Date of complaint            Detailed description         Low/Medium/High - Date/s taken
                  Full name of plaintiff       including any historic                       - Description
                  Contract details             or contextual                                - Persons involved in the
                  Contact modality             information                                  response
                  (email, phone, etc)                                                       Chronological log, if
                                                                                            multiple actions taken and
                                                                                            multiple responses from
                                                                                            plaintiff received


                 8.6 Contingency plan

                 The contingency plan outlined in Table 8.6 specifies remedial actions that will be undertaken in the
                 event that oysters fail to recruit to the oyster reef patches, vessel strike an oyster reef patch/es, visual
                 amenity is significantly impacted by the presence of the works, or associated signage, or where
                 erosion as a result of the restoration works causes impacts to shorelines or property.

                 Where remedial action demands changes to an oyster reef patch configuration, these changes will be
                 made consistent with the engineering specifications (Annex 14: Engineering Drawings). The engineers
                 will also be consulted prior to any changes being made.

                 Table 8.6 – Contingency plan

                  Challenge                           Contingency response
                  Limited oyster recruitment          Oyster reef patches will be seeded with oyster spat settled onto
                                                      dried oyster cultch, as is described in detail in Section 5.2 Substrate
                                                      augmentation. Reef seeding is used widely in shellfish restoration
                                                      as a back stop to highly variable natural oyster recruitment.
                                                      Seeding will be repeated at a restoration site until natural
                                                      recruitment at the site is achieved and is demonstratable.
                  Vessel strike on oyster reef        Restoration sites will be sign posted, with MSQ guidance, and
                  patch                               information about the sites widely distributed. A notice to mariners
                                                                                                                           73




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 74

                                                   will be issued as required, and the inclusion of restoration sites into
                                                   local navigational guides explored with MSQ. If an oyster reef patch
                                                   encounters repeated vessel strikes then signage and information
                                                   products will be reviewed with MSQ and NSC, and, as a last resort,
                                                   the height of an oyster reef patch may be lowered, or shape of an
                                                   oyster reef patch, or patches, modified to reduce the navigation
                                                   hazard to an acceptable level.
                  Extensive public complaint       Where extensive public complaints are received specifically relating
                  about visual amenity of an       to the position or configuration of reef patch/es, or signage, and
                  oyster reef patch or series of   these concerns are validated by TNC and local authorities, then the
                  reef patches                     respective oyster reef patch/es will be modified in height or shape
                                                   to alleviate the concerns, once all other avenues to address the
                                                   concerns have been exhausted.
                  Erosion caused by oyster reef    Where significant erosion is detected within 100m of a restoration
                  patches                          site and is shown to be directly attributable to the presence of the
                                                   oyster reef patches, remedial actions will be undertaken in
                                                   consultation with authorities. Remedial actions may include
                                                   modification of the height or form of oyster reef patches, to reduce
                                                   the erosion hazard, and/or remedial actions to the affected
                                                   shorelines or property.




                                                                                                                        74




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

Section 75

                 SECTION 9 - ANNEXES
                 Annex 1 - Noosa River Habitat Survey Report - ESP
                 Annex 2 - Noosa River MSES Map - Tewantin & Goat Island
                 Annex 3 - Noosa River Environ Values & Water Quality Map
                 Annex 4 - Noosa River Fish Habitat Area
                 Annex 5 - Community Engagement Workshop Report
                 Annex 6 - Public Information Sessions Report
                 Annex 7 - Engineering Specifications
                 Annex 8 - Safety in Design Report
                 Annex 9 - Code 7 - Maritime Safety
                 Annex 10 - Code 8 - Coastal Development & Tidal Works
                 Annex 11 - Code 11 - Marine Plants
                 Annex 12 - Code 12 - Declared fish habitat area
                 Annex 13 - Schedule 3 - Prescribed Tidal Works
                 Annex 14 - Engineering Drawings NROR-2021




                                                                            75




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.