Skip to the record
Beware of cheap imitations.

Original source · versioned page text

2022-05-16 GC Agenda - Item 7 - Attachment 2 - Noosa Oyster Ecosystem Restoration Project - Project Restoration Plan

of 75

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                 Matters of State environmental significance (MSES) - Tewantin

                 Refer to attached plans – MSES (Annex 2), MQ1401 (Annex 3), Noosa River FHA (Annex 4)

                       •   High Ecological Value Waters (wetland)
                       •   High Ecological Significance Wetlands
                       •   Noosa River Declared Fish Habitat (A) Area

                 High Ecological Value (HEV) Waters (wetland) / High Ecological Significance (HES) Wetlands

                 The oyster ecosystem restoration works are designed to enhance the values of the wetland by restoring
                 a complex ecosystem to what is currently a degraded aquatic environment.

                 Mangroves and seagrasses are not within the footprint of this project and will not be impacted.

                 A small stand of mangroves is shoreward of the proposed restoration footprint. Mangrove areal roots
                 extend into the intertidal zone adjacent to the proposed restoration footprint. Mangrove roots are
                 excluded from the restoration footprint at a minimum distance of 2m. Seagrass is found upstream and
                 outside of the restoration footprint and is excluded from the footprint at a minimum distance of 10m
                 from the footprint.

                 According to project consultants, ESP, macroalgae growing on rocks, dominated by Padina sp. is sparse
                 (less than 15% of the surface area), with a footprint of less than 479m 2. The macroalgal assemblages
                 are in relatively poor condition due to high sediment loads observed on and around the existing rocky
                 reef and rubble areas, with some sections of reef having a high coverage of fine sediment.

                 ESP also confirmed that given the speed at which Padina can colonise hard surfaces (dead oyster shell)
                 elsewhere in the estuary, it is anticipated that supplementary habitat provided as part of the proposed
                 restoration project would be colonised rapidly within 1 year of deployment, and that coverage would
                 be similar to the current condition within 2 to 3 years post deployment, particularly in sections that
                 particularly in sections that remain subtidal and not covered by fine silt.

                 The proposed oyster reef patches are designed and certified by engineers. The oyster reef patches are
                 spaced (1-4m apart) so as not to not impede fish passage, cause significant or impact negatively on
                 natural hydrological processes of the waterway. The oyster reef patches are set away from the
                 shoreline and will not interfere with overland flow and runoff as a result of floods.

                 Water quality will be maintained at the restoration sites during the construction phase in accordance
                 with the sediment management protocol outlined in this Restoration Plan (see Section 6.4: Sediment
                 Management). The restored oyster ecosystems will enhance water quality by filtering estuarine water,
                 removing algae and particulate matter from the water column and converting nutrients, such as
                 nitrogen and phosphorus, into biogenic oyster growth as well as binding these into the surrounding
                 sediments[1].

                 Water quality will be monitored at the restoration sites using standard parameters (pH, temperature,
                 dissolved oxygen, salinity, total dissolved solid) and significant changes reported.

                 The works will maintain recreational access to shorelines or the waters in which the oyster ecosystems
                 grow. All shorelines with recreational access have been excluded from the selection process. Visual

                 [1]
                   Kellogg, M. & Cornwell, Jeffrey & Owens, Michael & Paynter, Kennedy. (2013). Denitrification and nutrient
                 assimilation on a restored oyster reef. Marine Ecology Progress Series. 480. 1-19. 10.3354/meps10331.
                                                                                                                               27




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022
Log in to download the original file

2022-05-16 GC Agenda - Item 7 - Attachment 2 - Noosa Oyster Ecosystem Restoration Project - Project Restoration Plan(PDF, 7MB).pdf · 7.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.