Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

2022-05-16 GC Agenda - Item 7 - Attachment 2 - Noosa Oyster Ecosystem Restoration Project - Project Restoration Plan

of 75

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                 SECTION 6 – CONSTRUCTION
                 Construction standards applied in this project align with shellfish restoration best practice and the
                 Society for Ecological Restoration (SER) International Principles and Standards for the Practice of
                 Ecological Restoration global guidelines6.

                 The construction methodology described here has been successfully employed by TNC construction
                 contractors in shellfish restoration projects in Port Philip Bay (VIC), Adelaide (SA), Albany and Swan River
                 (WA). This methodology was also employed by the Department of Primary Industries (DPI) for the
                 restoration of rock oyster ecosystems in Port Stephens, NSW. TNC also has 25 years of experience in
                 utilising similar deployment methodologies in projects throughout the United States.

                 6.1 Methodology

                 The construction contractor engaged to handle and deploy the restoration substrate will have
                 experience with tidal works in the Noosa River, or similar sized estuaries, and preferably have
                 experience with shellfish restoration projects.

                 The contractor will acquire and manage the rock substrate from its source to its deployment. TNC will
                 supply the cured oyster shell to be used as a composite mixture with rock.

                 The contractor will stockpile the rock at an agreed load out site, selected with Noosa Shire Council, and
                 managed in accordance with the Site Management Plan and Construction and Environmental
                 Management Plan (CEMP), which meets with permit conditions.

                 In the appropriate weather window, related to suitable construction safety and operational
                 requirements (so as to avoid any potential damage to the receiving environments as well as staff), the
                 contractor will load the substrate onto a small barge from the load out site, transport the substrate to
                 the restoration site, and deploy the substrate onto site using an excavator (Figure 6.1).

                 Where a composite of rock and shell is used, the contract will mix this on the barge immediately prior
                 to placement to avoid shell damage due to rehandling (unless another method which achieves the same
                 objective is identified). The contractor will lay the substrate in configurations and clearances specified
                 for the site.

                 The first deployment of substrate will be closely supervised by the TNC monitoring team and the
                 configuration of the substrate inspected, in-water, to confirm accuracy of placement. Once TNC is
                 satisfied with the accuracy and appropriateness of the deployment technique, the contractor will be
                 permitted to continue with the deployment and subsequent deployments.

                 The contractor may use GPS, site markers or similar equipment to accurate mark the depositional sites.

                 The deployment barge only anchors at the restoration site where the minimum distance specifications
                 for marine plants, marine habitats and infrastructure can be met. Sediment plumes are managed in
                 accordance with the management protocol outlined in Section 6.4: Sediment management.

                 Once restoration substrates are in place, and signage and aids to navigation installed, authorities are
                 notified and accurate ‘as constructed’ drawings with RPEQ certification are provided as per permit
                 conditions.


                                                                                                                          52




Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022
Log in to download the original file

2022-05-16 GC Agenda - Item 7 - Attachment 2 - Noosa Oyster Ecosystem Restoration Project - Project Restoration Plan(PDF, 7MB).pdf · 7.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.