Original source · versioned page text
2022-05-16 GC Agenda - Item 7 - Attachment 2 - Noosa Oyster Ecosystem Restoration Project - Project Restoration Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Aids to navigation and signage shall be placed in close association with the substrate footprint and
positioned to minimise impacts on marine plants and habitats. Signage and aids to navigation installed
by a qualified contractor and removed as per permit conditions. Once positioned, signage and aids to
navigation will be included with ‘as constructed’ drawings of the restoration substrate footprints and
submitted to authorities, as per permit conditions. Signage and aids to navigation will be maintained,
removed or relocated during the permit period, as required with the written direction of authorities.
61
Document Set ID: 21802641
Version: 1, Version Date: 31/01/2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.