Flood Investigation & Stormwater Quantity Management Plan                                                                  BROWN
Proposed Residential Development at Doonella Stage C  -
                                                                                                                                   Snutrt Wztn"




                                       Table 3.2: Developed Scenario Sub.Catchment Details

                      Sub.Catchment                                 Area (ha)                    Fraction Impervious
                      A                                                 2.42                              0.18
                      B1                                                3.46                              0.53
                      B2                                                1.55                              0.48
                      C1                                                1.61                              0.65
                      C2                                                1.73                              0.70
                      C3*                                              0.18                               0.80
               .
                -
                    External sub-catchment of Sea Eagle Drive discharging minor design storm (pipe drainage) flows only to site.


For determining peak flows downstream of the site (for hydraulic modelling within the environmental corridor, refer to

Section 4) additional external sub-catchments over the adjacent residential development to the east and south have

been delineated for modelling of post development (mitigated scenario) conditions. Details of the external sub-

catchment areas and calculated fraction imperviousness is summarised in Table 3.3 below.

                                             Table 3.3: External Sub.Catchment Details *

                      Sub.Catchment                                 Area (ha)                    Fraction Impervious
                      01                                               0.43                               0.46
                      02                                               4.99                               0.62
                      03                                               1.82                               0.26
                             .
                              -
                                  Sub-Catchments used only for the determination of peak flows for hydraulic analysIs.


Refer to Drawing No. B09182.W.SK01 in Appendix 0 for the location and delineation of each developed scenario

sub-catchment area.


3.2      Existing Scenario Model
The existing scenario WBNM was created using the sub-catchment areas and fraction impervious values summarised

in Table 2.1 along with the follow input data adopted.

3.2.1    Rainfall Data

Design storm rainfall hydrographs were generated within WBNM using the log normal intensities and geographical
factors presented in Table 3.4 below. These values, sourced from the The Bureau of Meteorology Rainfall IFD Data

System website, are consistent with the Intensity Frequency Duration (IFD)data from Council’s DDPSP that have been
used in Rational Method as outlined in Section 3.2.4.

                                    Table 3.4: Log Normal Intensities & Geographical Factors

                      Log Normal Intensities                         1 hr                 12 hr                  72 hr
                      2YARI                                     52.03mm/hr            10.34mm/hr            3.46mm/hr
                      50Y ARI                                   93.95mm/hr            24.00mm/hr            8.66mm/hr
                                                                       G                    F2                   F50
                      Geographical Factors
                                                                     0.11                 4.40                   17.6



3.2.2    Routing Factors
A stream lag factor of 1 was adopted for all sub catchments for the Existing Scenario.

3.2.3    Loss Model & Lag Parameter

As part of the WBNM Calibration various configurations of initial loss, continuing loss and lag Paramter were trialled
until a configuration      produced peak flows consistent with those calculated using the Rational Method. Refer to
Section 3.2.4 for details on the WBNM calibration and Rational Method Calculations. Table 3.5 below summarises
the optimum Loss and Lag Parameters that resulted from the calibration process.



B09182.w-02A                                                                                                                            Page 4

Used in these records

About this file

File size
35.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Pre-Request Response Application 132001.210310.1.pdf · 35.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.