Original source · versioned page text
Attachment 1 - Proposal Plans
The original of this document is very large (12.1 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnfor develop approval PROJECT: Tooth Landscape Design Drawings Address: 1/15 Howard Street, Noosaville, QLD, 4566 Council: Noosa General Notes ISSUED DRAWINGS: DATE OF ISSUE: ISSUED REVISION: SURVEY DRAWINGS Sur 01: Not Engaged Do not scale from drawings. All set outs, dimensions & levels to be confirmed on-site by the contractor. STRUCTURAL ENGINEERS DRAWINGS SUPERSEDE ARCHITECTURAL DRAWINGS LANDSCAPE STRUCTURAL DRAWINGS INCLUDING ANY PROPOSED DRAINAGE DETAILS. A01: Not Engaged The Contractor is solely responsible to verify the location of all boundary lines, pegs, underground services, easements & any governing restrictions of the site prior to the LANDSCAPE DRAWINGS commencement of any earthworks or construction. Temple Outdoor Design & Living takes no responsibility for their accuracy. L01: SITE ANALYSIS 24.5.21 ISSUED These specifications shall be read in conjunction with all L02: LANDSCAPE SKETCH LAYOUT architectural, engineering and other consultants drawings 24.5.21 ISSUED and specifications and with such other written instructions L03: 3D VISUALISATIONS 4.6.21 ISSUED as may be issued during the course of the contract. L04: MASTERPLAN 4.6.21 ISSUED All structural works where applicable to be approved by the consulting Engineer prior to work commencing. All drainage L05: HORTICULTURAL DESIGN & SPECIFICATIONS 9.6.21 ISSUED details & levels shown shall be deemed as 'Proposed' only. Please refer to future Hydraulic Engineers details for final L06: PROPOSED LEVELS 9.6.21 ISSUED drainage locations & specifications. L07: PROPOSED STRUCTURAL SET OUT 9.6.21 ISSUED All discrepancies shall be referred to the designer for decision before proceeding with the work. Dimensions shall L08: PROPOSED MATERIAL SCHEDULE 9.6.21 ISSUED not be obtained by scaling the drawings. During construction, the structure shall be maintained in a stable L09: PROPOSED SPECIFICATIONS 9.6.21 ISSUED condition and no part shall be over-stressed. All workmanship and material shall be in accordance with the requirements of the SAA codes and the By- laws and ordinances of the relevant building authority. Refer to Architectural & Engineering drawings for set-out dimensions. The waterproofing of structures in this design are the builder’s responsibility. The contractor is responsible to locate ALL services prior to commencing any earthworks. DIAL BEFORE YOU DIG www.1100.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.