Original source · versioned page text
Annual Report 2014-15
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
NOOSA SHIRE COUNCIL
Notes to the financial statements
For the year ended 30 June 2015
14 Fair value measurements continued
Accumulated Depreciation
In determining the level of accumulated depreciation, bridges are disaggregated into significant components
which exhibit different useful lives. Useful lives are an estimate of the total service capacity in years for that
type of asset.
Stormwater
A comprehensive valuation of stormwater infrastructure was undertaken by independent valuers Aurecon
Australia Pty Ltd effective 30 June 2015.
As there is a significant level of professional judgement used in determining the valuation due to the level
of unobservable data, the valuation of drainage assets has been determined as Level 3.
The fair value unit rates were determined using the prevailing market costs for supply and installation
of similar assets or their modern equivalent. The methodology for calculation of unit rates from first
principles consists of breaking down each asset into its cost components such as demolition,
reinstatement, excavation, construction, delivery and installation. The models used to determine the
unit rates included internal selection of variables for asset size, depth, location and soil type.
Accumulated Depreciation
In determining the level of accumulated depreciation, stormwater assets are disaggregated into significant
components which exhibit different useful lives. Useful lives are an estimate of the total service capacity
in years for that type of asset.
Sensitivity Analysis - Roads, Bridge and Stormwater Network
As detailed above Council's road, bridge and stormwater network has been valued using written down current
replacement cost. This method utilises a number of inputs that require judgement and are therefore classed as
unobservable. While these judgements are made with the greatest care, and based upon years of experience,
different judgemenis could result in a different valuation. The table below summarises the effect that changes
in the most significant unobservable inputs would have on the valuation:
unobservable input") [ustece ies: inputs to fair-valuees 8 ee:
metre or sqm higher the fair value
ra gga [mee
Standard material usage | Varies depending | The higher the usage quantities,
quantities upon the type of | the higher the fair value
life) above —QH/OM _ |the lower the fair value.
(lowest) to GH/6M .
(highest) ~
:
life, the higher the fair value. {
Page 26See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Annual Report 2014-15(PDF, 3MB).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.