07/1841 - Response to Information Request [As Published] · 132007.1841
* oo ib ken hicks AND ASSOCIATES 18 January 2008 Our Ref: 060253 Your Ref: 2007/1841 The Chief Executive Officer Noosa Council PO Box 141 TEWANTIN QLD 4565 Attention: Tracy Arthur Dear Tracy RESPONSE TO INFORMATION REQUEST DEVELOPMENT PERMIT FOR MATERIAL CHANGE OF USE FOR INDUSTRIAL BUSINESS TYPE 1 WAREHOUSE & TYPE 2 PRODUCTION, ALTERATION, REPACKAGING & REPAIRING & EDUCATION TYPE 3 - ADULT - ON LAND AT 26 EENIE CREEK ROAD, NOOSAVILLE, DESCRIBED AS PART OF LOT 1 ON SP182880. We refer to Councils request for further information dated 23 October 2007. We now respond in full to the information requested (6 copies provided). Land Use 1. Provide further defails of how if is proposed to ensure Environmental Research and Development businesses will occupy the site in accordance with the intent of the precinct. While the applicant proposes to encourage Environmental Research and Development businesses to occupy the site there is no guarantee that this can occur, nor is there any provision of the Noosa Plan to ensure this will occur. We note that Commercial Business Type 1 Office and Commercial Business Type 2 Medical are consistent code assessable uses for the site. These uses could occur on the site without any need for them to include Environmental Research and Development businesses. As detailed in our original planning report we believe that Environmental Research and Development businesses are more likely to be classified as industrial uses than office or medical. In this regard we believe the proposed industrial uses will provide a greater possibility of achieving Environmental Research and Development businesses to occur on the site. Further, restricting the industrial uses as proposed with the application will assist in ensuring that an undesirable ‘industrial’ outcome will not result 2. Provide further grounds as to why the industrial uses proposed accord with the intent of the precinct in preference to the consistent uses identified in The Noosa Plan. Consistent use for the site includes Business Type 1 Office and Commercial Business Type 2 Medical. Theses uses, together with the proposed industrial uses are also consistent uses within the applicants nearby precincts E4 & E5 {Lots 2 & 1 respectively). Code assessable development applications are currently being assessed for Lots 1 & 2 and which include in excess of 20,000m? of office use. Given this extent of office use we no not believe any further office use is needed or justified on the subject site. In essence the proposal achieves a ‘trade’ of use to provide industrial business that would have been a consistent use in Precincts £4 & ES. The extent of industrial business proposed is considerably less than could have been achieved in precincts £4 & E5. TOWN PLANNERS | CONSULTING SURVEYORS | URBAN DESIGNERS | PROJECT MANAGERS Ken Hicks & Associates Pty Ltd | [email protected] | A.C.N. 010 278 823 | A.B.N. 74308 405 611 Suite 7 Dalton Centre, 1 Newspaper Place 48/42 King Street 61-73 Sturt Street PO Box 6380, MAROOCHYDORE BC Qld 4558 PO Box 1712, CABOOLTURE, Qld 4510 PO Box 5027, TOWNSVILLE, Qld 4810 P 075443 2844 F «07: 54437146 P 0754955318 =F 0754955317 P 07 4721 3066 F 07 4721 3088
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 81 pages
Page 2
3 3. The Town Planning Report includes a list of businesses that are proposed to be restricted from the development. Please provide a list of business types thaf are anticipated to operate on the site. The Town Planning Report included a list of businesses that are proposed to be restricted from the development to ensure than an undesirable ‘industrial’ outcome does not result. Given that there is such a wide and varied range of tenants potentially suitable for the site it is extremely difficult fo list exactly who may operate. For this reason we consider it better to exclude uses rather than list proposed uses. However by way of example uses that could potentially operate from the site include eco furniture, fittings and fixtures; environmental management solutions: smart wiring; solar energy solutions; waste management solutions; water management solutions; water technologies; sustainable pumps, pipes and fittings etc. 4, The Town Planning Report indicates that the proposal involves the relocation of the existing Noosa Community Training Centre (NCTC), though this facility is not indicated on the plans. Please provide amended plans indicating a facility of similar size and functionality to that being replaced. For reference, the existing facility consists of: « Approx. 267m? Gross Floor Area + toilet facilities e includes 3 Classrooms (approx. 60m? each), | Kitchen (training) area (approx. 20m?, and I Administration Office (approx. 67m7); & e Involves up to 30 trainees at any one time and 5 permanent staff. The proposal has been amended such that the Education use (Noosa Community Training Centre} will be occupied within the original conference/gym facility, now labeled as Building K, and the remainder of the site will be for industrial use. This results in proposed uses now comprising 9101m2 of industrial use area (9510m2 GFA) and 225m? of education GFA. Building K continues to include a small gym for use of the industrial tenants and also the ability for a conference facility co-shared with the training centre classrooms. The NCTC will be responsible for maintenance and management of the facility and make the conference/meeting facility available for the use of the industry tenants with a booking system in place. 5. Provide details of the proposed financial (leasing) arrangements for the relocated NCTC and indicate how its future viability will be supported by the development. It is intended that NCTC will have a management agreement in place for the facility with costs subsidized by the owners and through fees paid by the industrial tenants for use of the conference/gym facility. These arrangements are not however considered a planning consideration and are subject to an agreement between the developer and the NCTC. 6. Provide a written indication of how any staging of the development, and works on the existing NCTC site, will affect the continuity of fhe Centre’s operation. The conference/training centre will be built with the first stage of development. We are unable to provide any information at this stage of how development works may impact the continuity of the centres operation. This is not however a planning consideration and should have no bearing on the planning assessment of the application.
Page 3
7. Provide further details of how the conference and gym facility is proposed to be utilised by the tenants of fhe site, including tifling and confractual arrangements and costing structures for its use. The conference and gym facility will not be open to the public and is provided as an ancillary facility for the industrial tenants. This facility will be managed by the NCTC. The gym will be open at all times for use by other tenants, whereas the conference/meeting facility will need to be pre-booked. Titling and contractual arrangements will depend upon whether the site is developed and retained in a single ownership or subdivided under a community titles scheme. Costs for use of the facility will be incorporated in either lease agreements or body corporate fees. 8. Provide a detailed assessment of the adequacy of the carparking facilities provided in association with the conference and gym facility and provide amended plans indicating increased parking provision as appropriate. Given that the conference and gym facility is not open to the public and is provided an as ancillary use for site tenants, no additional parking demand or provision is generated. Carparking has been provided as follows, in accordance with the requirements of the Driveways and Carparking Code: Use Carparking Rate Requirement Provided Industrial 1 space per 50m? of use | 182 19] area. Use area = 9101m?2 Education | space per employee & 5+3=8 10 ) space per 10 students of driving age. NCTC has 5 staff and 30 students/trainees Total | 190 201 As demonstrated carparking provision has been provided in excess of the requirements of the Driveways and Carparking Code. 9. Provide confirmation of the proposal'’s consistency with the various Management Plans submitted in association with the Reconfiguring of a Lot and Operational Works applications (2006/1594 & 2007/1242). Where there are conflicts, fhe proposal plans - and/or management plans shall be amended accordingly and resubmitted, clearly indicating any changes made. The proposal does not conflict with the amended Management Plans approved with the Lot Reconfiguration and Operational Works applications. 10. Provide a Bushfire Management Plan for the site that addresses the proposal. The plan previously submitted has not considered the proposed development. An amendment Bushfire Management Plan was prepared and submitted subsequent to the Operational Works approval for the lot Reconfiguration works. This Bushfire Management Plan considered the proposed development. A copy of the Plan is attached.
Page 4
11. Provide a Stormwater Management Plan for the site that addresses the proposal. The plan
previously submitted has not considered the proposed development.
A Stormwater Management Plan for the site that addresses the proposal has been prepared
by Barlow Greg VDM and is attached.
12. Confirm that there will be no disturbance of existing vegetation or ground levels within the
environmental covenant area in order to complete the development.
Approval has been given by Council for the covenant area to be cleared and utilised for
bushfire buffer purposes.
13. Provide an assessment of the development’s compliance with the streetscape character
requirements of Specific Outcome O107 (items a fo h) of fhe Noosaville Locality Code.
Details of the proposals compliance with the streetscape character requirements Specific
Outcome O107 {items a to h) of the Noosaville Locality Code are detailed below:
Specific Outcome
Proposal
O107 Buildings and structures are sited and
designed to—
a) provide for a_ consistent building
alignment fronting the street and public
spaces;
The proposal provides for a_ building
alignment fronting the street consistent with
existing development within the Shire
Business Centre and development proposed
in separate application by the applicant
over Precincts E4 and E5.
b) present a high quality streetscape
incorporating consistent built elements that
define the street and public spaces as well
as create human scale and visual interest:
The proposal will present a high quality
streetscape with built elements consistent
with existing development within the Shire
Business Centre and development proposed
in separate application by the applicant
over Precincts E4 and £5. The varying
building heights and articulation of the
buildings fronting the street will create
human scale and visual interest.
c) be consistent with the bulk and scale of
buildings on adjoining and nearby land;
The proposal will be consistent with the bulk
and scale of buildings existing within the
Shire Business Centre, that proposed by the
applicant on nearby lands and that existing
on adjoining land within the Rene Street
industrial area.
d) contribute to their setting including the
skyline;
The proposal comprises = architectural
designed buildings that achieve the
character requirements for the Noosaville
Locality, including pitched roofs, which will
contribute fo their setting including the
skyline.
e) present subtle changes in colours, textures
and materials to break up the building
facades;
The proposal includes buildings with varied
materials and finishes that break up the
building facades.
f] integrate signage with the building design;
Signage will be provided in accordance with
the Advertising Devices Code.
g) integrate landscaping into the building
design and car parking areas; and
The proposal integrates landscaping into the
building design and car parking areas
Page 5
h) retain and provide areas for outdoor | Outdoor dining is not applicable to the use.
dining and meeting opportunities on the | The proposal provides for meeting
ground level. opportunities with the conference/
gym/training facility.
14. Provide details of the extent of any cut or fill required for the proposed development, and
whether this could potentially impact on the vegetation in the adjacent open
space/covenant areas.
The extent of proposed cut/fill for the site is shown on the attached Preliminary Levels and
Cross Section Plans prepared by Barlow Gregg VDM. Potential impact on vegetation within
the covenant area is no longer an issue given Council approval for the vegetation to be
cleared for bushfire buffer purposes.
15. Confirm whether the required shade frees in the carpark can be provided in accordance
Specific Outcome 028 of the Landscaping Code requirements.
Shade trees in the carpark can be provided in accordance Specific Outcome 028 of the
Landscaping Code. This detail will be provided as part of a subsequent Operational Works —
Landscape application.
16. Provide amended plans indicating proposed waste storage/bin enclosure area for the gym
and conference facility.
The amended plans attached provide for a waste storage/bin enclosure for the
gym/conference/training facility.
Land Development
17, Provide amended proposal plans addressing the issues herein, and ensuring that all plans
are drawn to a common scale (eg. 1:500, 1:200, and 1:100, efc).and not a photocopied,
reduced scale.
The amended plans attached address alt relevant issues and have been provided to scale.
18. It is noted from the town planning report submitted with the application that the
development is proposed to be developed in stages. if a staged approval is desired,
please provide plans that clearly indicate this staging so that it is easy for everyone to
understand. In this regard separate pians that indicate each stage of the development are
required with the internal service road and car parking associated with each stage to be
clearly shown on the plans, as well as any other ancillary components that may relate to
the separate stages.
Development staging has not been finalised. As demonstrated with the proposal plans each
Building area has been designed such that it is stand alone {ie has appropriate building to
carparking ratios, landscaping etc) such that it is capable of being developed in separate
stages and also potentially allows for future subdivision under a community titles scheme.
Stage 1 would comprise the full construction of the central spine road which then provides
access to any building area which may be separately developed.
19, Please arrange a suifably qualified traffic engineer to prepare and certify a detailed Traffic
Assessment of the sife , addressing (but not limited to) the following issues:
A traffic assessment report has been prepared by Burchill VDM and is attached.
Page 6
20. 19,1. Demonstrate compliance with Part 14, Division 18 of the Planning Scheme - Transport, Roads and Drainage Code in relation to Traffic Engineering issues. The attached traffic assessment report prepared by Burchill VDM demonstrates compliance with Part 14, Division 18 of the planning scheme in relation to traffic engineering issues. 19.2. Provide an intersection analysis of all intersections that will result in an increase in traffic of 5% or more as a result of the proposed development and provide recommendations as to how these increases can be best dealt with. The attached traffic assessment report prepared by Burchill VDM provides an intersection analysis. 19.3. Demonstrate that the overall car park layout complies With the Australian Standard for Parking Facilities, Part 1: Off Street Car Parking (AS2890. 1). The attached traffic assessment report prepared by Burchill VDM demonstrates that the overall car park layout complies with the Australian Standard for Parking Facilities, Part 1: Off Street Car Parking (AS2890.1). 19.4, Provide justification for the proposed number of car parking spaces and nominate on the proposal plans the exact break-up/distribution of car park spaces with consideration given to the differing uses proposed. No justification is required for the proposed number of carparking spaces as the proposal complies with the requirements of the Driveways and Carparking Code (refer response to item 8 above}. 19.5. Demonstrate that the car park layout will function as intended, as concern is raised over the blind aisles (and hence increased manoeuvring) and generally poor circulation within the individual carpark areas. The attached traffic assessment report prepared by Burchill VOM demonstrates that the carpark will function as intended. 19.6. Demonstrate how pedestrians and cyclists will gain safe access to the site from external areas (including the various shire business centre uses within the overall development). The provision of pathways will need to be considered and the need fo. cross over roads should be avoided where possible , but where required a central refuge area will be needed. Pedestrians and cyclists will gain safe access to the site from the external road network and pathways that are being developed as part of the Shire Business Centre. It would be unreasonable for any special provision over and above the existing approved road network provision to be required or imposed on the subject application. Demonstrate that adequate end of trip facilities are incorporated within the proposed development, such as bike racks/rails (for visitors ), storage lockers (or .similar) for staff, change rooms, showering facilities, and drinking fountain (or similar). Given the scale of the development, shared female/male facilities (unisex facilities) will not be appropriate and separate facilities will need to be provided. Please illustrate all end of trip facilities on the proposal plans.
Page 7
End of trip facilities, including 40 bike racks, will be provided with Building K which will be shared by all other site users. Provision has been made for 3 separate male and 3 separate female showers/change rooms and storage lockers. 21, Demonstrate compliance with Part 14, Division 20 of the Planning Scheme - Water Sensitive Design Code. The attached Stormwater Management Plan prepared by prepared by Barlow Greg VDM demonstrates compliance with the Water Sensitive Design Code. 22. A development of this scale will be required to provide rainwater tanks with a minimum capacity of 15 litres /m2 of roof area for use within the buildings and for irrigation purposes . On this basis, please demonstrate on the proposal plans where these tanks will be located and if above ground, please illustrate on the plans, elevations and sections of the buildings and indicate the tank sizes. The attached Stormwater Management Plan prepared by prepared by Barlow Greg VDM provides details of required rainwater tanks. 23. Demonstrate on the proposal plans how it is intended fo collect and drain stormwater runoff, It is nofed in the planning report that if is intended to direct stormwater to Council infrastructure , but as the site falls towards the rear of the allotment where there will not be any Council stormwater infrastructure located it is unclear as to how the site will be drained and whether there will be any impacts as a result. Please provide plans and supporting documentation to demonstrate how the site will be drained so as to have no external impacts and no net .increase in runoff. In review of the stormwater design for the site, consideration should also be given to any overland flow paths that will flow through the site. The attached Stormwater Management Plan and Stormwater Flow Direction Plan prepared by Barlow Greg VDM demonstrate how Stormwater drainage will be achieved. 24, Provide plans that illustrate the proposed development in relation fo the natural ground levels of the site. In this regard please show the natural contours on fhe plans, proposed surface levels, the natural ground level on all elevations of the proposed buildings and provide at least 6 cross sections through the site (at least 2 in a North South direction and 4 in a east west direction). The attached Preliminary Levels and Cross Section Plans prepared by Barlow Gregg VDM provide details of existing and finished ground levels for the site. Cross sections are also provided with the proposal plans prepared by Sprout Architects. 25. Indicate on the plans, elevations, and cross-sections any cut or fill earth works and hence any retaining walls that may be required on sife and the height of such walls. The attached Preliminary Levels and Cross Section Plans prepared by Barlow Gregg VDM indicate extent of any cut/fill and retaining walls. 26, Please show on the proposal plans the actual location of the existing sewer main that traverses the site (including any easements) and any manholes that will be located within the site. Should this sewer be relocated, also show on the proposal plans the intended location of the sewer main and the easement that will be required over the new sewer. The attached Sewerage Layout Plan prepared by Barlow Gregg VDM shows the location of the existing sewer that traverses the site, together with the proposed relocation.
Page 8
27. The waste areas within the proposed development do not adequately allow for the use of bulk bins. Many premises will be able to use wheelie bins thaf can be placed af the kerbside for collection, however some businesses will require bulk bins to, be serviced on site. Council requires that any waste vehicle that enters onfo a property must be able to enter and exist the site in a forward direction. The current proposal would require waste vehicles to reverse out creating safety problems and a more flexible and compliant waste management solution needs fo be proposed. The proposal plans have been amended to provide improved access locations for waste bin enclosures, The Information and Referral Stage of IDAS has now concluded. We ask that you now provide details of adjoining owners in order that we may commence the public notification of the application. Should Council have any query regarding this matter, please contact our office. Yours faithfully KEN HICKS & ASSOCIATES Scott Sobey DIRECTOR
Page 9
N\obs07D41 Popoeed Commercial Lot loc 81S Devslopments\Onrsinga WchCAD'ModeHO7ON1 SITE PLAN pin - 4 66 PM. 1801/7008 1 vag at PROPOSED BUSINESS PARK FOR S & L DEVELOPMENTS LOT 3 EENIE CREEK ROAD NOOSAVILLE DRAWING SCHEDULE $D01 OVERALL SITE PLAN SD02 BUILDING K - DRAWINGS $D03 BUILDING A- DRAWINGS $D04 —_ BUILDING B - DRAWINGS $D05 BUILDING C - DRAWINGS SD08 BUILDING D - DRAWINGS $D07 BUILDING E - DRAWINGS $D08 BUILDING F - DRAWINGS SD09 BUILDING G - DRAWINGS SD10 BUILDING H - DRAWINGS SD11 BUILDING | - DRAWINGS $D12 BUILDING J - DRAWINGS $D13 SITE SECTIONS REV DESCRIPTION DRAWN GATE ot ‘A DAISSUE TO COUNCIL WENPE OV0R07 8 RESPONSE TOCOUNCH. © 160106 REQUEST FOR INFORMATION. Gr. architects MAROOCHYDORE BUSINESS. PARK 6/12 NORVAL CRT MAROOCHYDORE QId 4558 PO BOX 6232 MAROOCHYDORE BC —QId. 4558 PH : 07 8443 5028 FAX:07 478 2380 ABN 23123917 724 EMAIL: [email protected] au ab project PROPOSED BUSINESS PARK for S & L DEVELOPMENTS at LOT 3 EENIE CREEK ROAD NOOSAVILLE drawing COVER SHEET cate AUG 07 drawn CD scaie 1:200 érewing n0.07041 SDOO reson A be 4 Copynght of nas document semans the excise propery of SPROUT ARCHITECTS @TY LTR ‘ADI Za 123.017 724 Conirctors are to very al cxmenaiena and levels on ‘nvr prot fo commencing Repor a ciscrapanians 0 Uke Arcivect, Use tgiree amnenaans preference wa seated
Page 10
Niv008107041 Poposee Commercial Lot 3 for S.S OnvelnpmanssOnnehgriArcCADRMedetO7D41 SITE PLAN pn - 400 PM. 1710122008 REV DESCRIPTION DRAWN DATE tO tt A DAISSUE TO COUNCIL wees ovoso7 B_-RESPONSE TO. COUNCAL o 16018 REQUEST FOR INFORMATION ree. BUILDING K > IN GROUND > S RAIN WATER > a TANK BUILDING J ahs C . - BUILDING A ihe 7 X \ \ 6 \ y 1 ' , t , Oo Be had ag | 4 me PE Pr 1 & I ! “ ! ‘ ‘ ‘ n we toga 7 a # 4 wh " Ww ; — = ral = ABOVE GROUND é af 1 \e'Qh ia loys Vb. ¥ * yi é BUILDING! | = BUILDING B SITE SUMMARY iy, A = TOTAL NUMBER OF BUILDINGS " in ‘ . f MI TOTAL NUMBER OF TENANTS 33 &- g 2 © AREAS 5 “ ABOVE GROUND SITE AREA 20842,5m? 6 RAIN WATER TANK TOTAL TENANCY GFA 9839m? 2a } . (INCLUDING MEZZANINE} AANWATER ws \ , t SITE COVER 471.2% BUILDING H f= oF aN # BUILDING C caneanans ry ty ty Vay CARS PROVIDED 201 aa aN \ v a Lt , mnt LANDSCAPING - a \! . ABOVE GROUND LANDSCAPING REQUIRED 15% 326m? 6284 t i RAIN WATER TANK LANDSCAPING PROVIDED 22% 4653m? 7 ~ BUILDING G ie = aa E} BUILDINGD ss peyeariat bs. t @ ve Z Ty >. E < i ( Lom & Hl , s famwaren "ff , } S 0 HO) / 8 DAK é eG i Z / J, a-- Tt a -—sa we tS tees r yet See oe 74 4 1h 5! ABOVE GROUND architects MAROOCHYDORE BUSINESS PARK as es G/12 NORVAL CRT MAROOCHYDORE = Qid 4558 PO BOX 6232 MAROOCHYDORE BC Qld 4558 PH : 07 5443 5028 FAX:07 5479 2380 ABN 23 123.917 724 EMAIL: [email protected] BUILDING F BUILDING E ‘we projec PROPOSED BUSINESS PARK for S & L DEVELOPMENTS ve ’~ at LOT 3 EENIE CREEK ROAD 902 | NOOSAVILLE SP163309 drawing OVERALL SITE PLAN OVERALL SITE PLAN Scale 1.500 date AUG OF = drawn CD scale 1:500 Copyngp of Pas cocanend remans Bre exchusne Gropany of SPROUT ARCMTEGTE PTY UTD. ‘AB 23 122 917 724 i ‘ie pro io commencing Regon ol Gxcranzsncars 3) 1
Page 11
N-Usba®7O11 Poposee Commetco’ Lot 2 fot S.S Grrelopments Orne WONCAD MadeNO7DL' BITE PLAN pin - 4 00 PM. 1720172008
cH LEVEL
GUZNG
see Dror
PT rerrs
TEI — a a <—
RENDERED BLOCK
NATURAL EXISTING FULL HEIGHI
CARRS
STEEL FRAMED AWISING PROJECTION ‘GROUND LINE (DOTTED)
NO COMBUSTRLE MATERULS,
WEST ELEVATION
\ , kat oF we, Scale 1:200
\
\
\ ‘
\ ed ~ ‘
\ % ON bern
oe .
\ s
N
\ i .
. S
GROUND URE (DOTTED)
Fuld MEXGHT
~ Tac osins
ane
‘GROUND LINE (DOTTED;
NORTH ELEVATION
AGH LEVEL
METAL ROOF
REV DESCRIPTION ORAWN DATE
CoO
A DAISSUE TO COUNCIL WEIPS OM0907
160108
B —_-RESPONSE TO COUNCIL a
REQUEST FOR INFORMATION
STEEL FRAMEDAYINNG
NO COMBUSTIBLE a
MATERILS,
Scale 1:200
Wir LEVEL
SHEETING
STEEL FRAMED AWNING,
NO COMBUST BLE
MATER
‘RENDERED BLOCK
wal
STEEL FRAMEDAWNING
ROCOMBLSTIMLE
NATERALS
GAZKG
FUULHEIOnT
GUNG GROUND UNF (DOTTED)
, NORTH WEST ELEVATION
\
ROOF PLAN NORTH EAST ELEVATION 7 Scale 1:200
Scale 1:200 Scale 1:200
eta sett _— HH LEvEL (— sususe mea Sst
oor SHEETING Gate CwLOGURE ROOF SIEETNS,
LOST aro [
LF
7 T
+ +
\ RENDERED BLOCK r RATURAL EXISTING RENOERED BLOCK
‘\ BUILDING K wait ROUND UNE ATTED, wa
‘ ABEAS
> SOUTH ELEVATION
SITE AREA= 1078m"
, OVERALL BUILDING
’ ‘ant GFA
Grane / “4 SITE COVER = 36% Seen oune geting
/ -< CARPARKING TEE FaAweD ANG
yy a“ PROVIDED CARS © 10 CARS RAS cae
S -
v~ RENDERED BLOCK
worbaemacrvae gn LANDSCAPING sas sea m2
MATERWLE r’ - PROVIDED 37% 2397
\ ‘ ra 2 snc fects
Fa \ aso ee . MAROOCHYDORE BUSINESS PARK
enc 7 GORD Lae DOTTED) 6/12 NORVAL CRT MAROOCHYDORE Qld 4558
eae \ PO BOX 6232 MAROOCHYDORE BC Qld 4558
\s so PH : 07 5443 6028 FAX:07 5479 2380
. o
Lan . a SECTION A-A ABN 23123 917 724
ts 7 ™. Scale 1:200 EMAIL: [email protected]
project
PROPOSED BUSINESS PARK
for
S & L DEVELOPMENTS
at
Scale 1:200
LOT 3 EENIE CREEK ROAD
NOOSAVILLE
drawing
BUILDING K - DRAWINGS
date AUG 07
rewingro.Q7041 SD02
drawn CD scale 1:200
revision B
Page 12
{8 Uope0704 | Popowed Conrnercasl Lot 2 for $1.5 OnvelaprmenrOrmengathecMCADWadNPO706{ SITE PLAN pin - 4.01 PLL 17.01/2008
AWAING BELOW
11 UP PANEL
PARA
\
FC ARAN:
Scale 1:200
(UNE OF WALL UNDER
'
|
fn on wxcor s-cernon cuzans \
\ toon aoe | uewne va = ,
| I ce == I Lyne 1 ly- == Il ly-==a
zt ru o faa == !
! | { it {
| ry \ \ | \
i
|
! |
1 TENANT 1 TENANT 2 q TENANT 9 TENANT 4
| + 67 mF MEZZ 67 m? MEZZ. 67 nm? MEZZ 87 mm? MEZZ |
|
\
eo FFL 7.70 yoo FFL 7.70 we FFL 7.70 le |
| BELOW buon BELOW \
|__ |
1
'
}___it00_ iy. I
|
|
|
1
|
---4
Scale 1:200
(MEZZANINE LEVEL PAN or ©
Been Se
We
A
‘\
aE
LoT1 * CARPARKING ©
1581m? ve ton
sworrnont ~ — A PANEL VERTICAL ——
GUAZKG 766 0008 2
Loaninc gay f° LOADING BAY LOADING Bay r Loapinig say [V. ==
VA Te 4 ‘ Pei) os Py) os
“| i / \ / \ / Y 7
, & \ can) \ |
iN boyy, 4 ,41 8 ve & rg
a \7 q \eoog ve \eo
' 38 a! nN At A &
, * oN é aX § wy 4 7. g
| , NB ,oN 8% 1 oN ® roy &
“ Lg \ og FFL470 ? \ 5 FFL 4.70 FFLAT0N ¥ FFL 470 \ ®
‘ \ / \y
TENANT 2
S 1470 mm? GFA
TENANT 3.
170 mm? GFA
67 m* MEZZ 67 mi’ MEZZ
{0 COVRUSTIN E VATERILS.
Sn WOE FRE BUTER
\
NOUNDENG
“He » GROUND FLOOR PLAN
TERE é
Scate 1-200
it a
mi
}oo\e-
|
A TENANTS.
SHOPERONT GLAZING:
UaaT WEIGHT
WALL PANEL
AATIRA ESTING.
GROUND URE (DOTTED)
NORTH ELEVATION
Scale 1:200
FEATURE BLADE WALL
conven
ROOF SHEETING
THT UP PANEL
WITH BTRUCK JOINTS
(GATED PANE: DOOR,
REV DESCRIPTION DRAWN DATE
el
‘®—-DAISSUE TO COURCIL WENPE 000807
8 RESPONSE TOCOUNCRL co entne
REQUEST FOR INFORMATION
UGHT WEIGHT
WALL PANEL
BLADE WALL
WEST ELEVATION
Scale 1:200
et
THT UP PANEL
‘eam STRUCK ——
JON URES
GROUND LINE (DOTTED!
SOUTH ELEVATION
Scale 1:200
SATLRAL EXISTING. '
‘GROUND LINE {DOTTED}
EAST ELEVATION
Scale 1:200
—— Taro an WALL —>,
SITE COVER 45.7%
CARPARKING
REQUIRED CARS = 19 (1:50)
PROVIDED CARS = 19
LANDSCAPING
REQUIRED 10% 1581?
PROVIDED $5 4% = 244 8?
wots
\
‘GROUND LINE (DOTTED)
SECTION B-B
Scale 1:200
Garou
architects
MAROOCHYDORE BUSINESS: PARK
G/12 NORVAL CRT MAROOCHYDORE —QId 4558.
PO BOX 6232 MAROOCHYDORE BC Qid 4558
PH : 07 5443 5028 FAX:07 6479 2380
ABN 23129 917 724
EMAIL: [email protected]
a OI_OF
project
PROPOSED BUSINESS PARK
for
S & L DEVELOPMENTS
an
LOT 3 EENIE CREEK ROAD
NOOSAVILLE
drawing
BUILDING A - DRAWINGS
—
date AUG 07 drawn CD scale 1:200
drawingne.QO7041 SDO3 revision B
oe 4
Capyrsns af tas cocumare mina te exch
propery of SPROUT ARCHBTECTS PTY LTD
i ‘ADR 23 420 917 724
Page 13
|N Uobai07D4 Poposed Commertia! Lat J lot 5.8 Orveloment DrawgelArenCADModshOTDM1 SITE PLAN pn = 4°91 PM. 37/01/2008
; EG
|
1 aaa SS SS
I wewu—
1 Blow =
S |
| ==
\ “
I
|
I
| ec
\ a=
\ ¥
{ SSS ——
( =
I = hs
\ ax
{
|
| = SS
Je eee aaee : ---4
| ROOF PLAN
Scale 1:200
1
rerarsosn} TENANT 4
&- 1 | Som? Mezz woe '
' ion
' FFL 7.75
1
ee!
SSHOPERONT.
oun
2 &
4 x
g (CEB) TENANT1 ,
Ce 350m? GFA /
18 é 50m? MEZZ ,
FFL ATS Jf
aa
Z
fi
Fe
FPLAIS el
£32
TENANT 2
350m? GFA
~. ‘50a? MEZ2
i ~\N 1
by ; +
GROUND FLOOR PLAN
a Scale 1:200
4 :
REV DESCRIPTION ORAWN DATE
et
DARSSUE TO COUNCIL WEIPB 0N0G07
RESPONSE TO COUNCIL cc onine
REQUEST FOR INFORMATION
mre
Pee TH
STRUCK SORTS
ATURAL EXISTING,
‘GROUND LAE
SOUTH ELEVATION
Scale 1:200
METAL ROOF
‘SHEETING
WEST ELEVATION
~ Scale 1:200
META. ROOF
SAEEING
NATURAL EXETINS
‘GROLND LINE (00 TTED,
Se S- =
| NATURAL OUSTING: RATURAL XUSTING
BE REE ay et
!
|
i-& NORTH ELEVATION
EAST ELEVATION - Scale 1200
| Scale 1:200
|
I
| 1 AL SHEET
[Bilin po
!
_- a __| ee Ll iis
! scar esnael (ee
I fu FAL Fat
|
|
|
SECTION C-C
_. Gromit
architects
7
MAROOCHYDORE BUSINESS PARK
6/12 NORVAL CRT MAROOCHYDORE Qld 4558
PO BOX 6232 MAROOCHYDORE BC Id 4558
¥ auonss PH 07 5443 5028 FAX:07 5479 2380
REA! ABN 23123 917 724
EMAIL: [email protected] au
a
Project
Vom AREA = 157m"
QERALL BULOING PROPOSED BUSINESS PARK
100m? MEZZ_
‘B0OnF TOTAL
2TENANTs tor
SITE COVER =47% S & L DEVELOPMENTS
CARPARKING
REQUIRED CARS = 16 (1:50r7) at
PROMDED CARS = 16
LOT 3 EENIE CREEK ROAD
LANDSCAPING NOOSAVILLE
REQUIRED 10% = $57.7rr"
PROVIDED 18.6% = 310.2507
drawing
BUILOING B - DRAWINGS
date AUG 07 arwn CD scate 1:200
drawing 1.07041 SDO4 revision B
4 1
\ PNY
Copyngnt of ths oocument remains the Exch
Property ol SPROUT ANCHITECTS PTY LTD.
SENT 73817 724
Page 14
REV DESCRIPTION DRAWN OATE
re
A DAISSUE TO COUNCIL WEsPS ovoa07
B RESPONSE TOCOUNCHL co tenis
REQUEST FOR INFORHATION
rare
(WALL PANEL SHOP FROAT eT WEIGHT (ADE WALL
GLAZING WALL PANEL, {ATH STRUEK JO NTS
[— MRT UP WALL PANEL [ETN SHEET
WITH STRUCK JOS ROOEING,
Scale 1:200 iii fH m wn
------- wort rr oe ---- ee ~---
NATURAL BXSTING NATURAL EXBTAG.
|
\
|
I I
oy ; \
| | ' |
tl * ! SaDUe Une worreD) {ROUND Une DOTTED
| | !
1] H 1 ' \ ;
+O pews | ewer |! SOUTH ELEVATION EAST ELEVATION
cq ' I =
roost 154 mm? MEZZ \ I 436m? MEZZ 1 ! | U - Scale 1:200
ot v0 1 00 } \ Scale 7-200
! HOOR 1 FLOOR
1 tS 1 Lon ! 1 mow | I
1 , -
' FFL7.95 ' i FRLT.95 ' oe [ oe
! 1
{ ' \ ' ! |
{ 1 ' 1 ! | mez
bho . | -—
| | noun
‘ ay 1 _ aes
\ Y | DB a nie ;
WATURAL EXISTING
GROUND LINE. ~~
Leo poses! Pee end LN
: . a
© (QQ Wit:
SECTION D-D \ . H i '
. Scale 1:200 INA LLY
Y o™ __ ne
Zs architects
¢ MAROOCHYDORE SUSINESS PARK
. 6/12 NORVAL CRT MAROOCHYDORE = Qid 4558
BUILDING C \ PO BOX 6232 MAROOCHYDORE BC Qld 4558
. PH : 07 5443 5028 FAX07 5479 2380
AREAS \ ABN . 23: 123 9417 724
SITE AREA= 145770? \ EMAIL: [email protected]
‘ a OOOO___™'.-——scuat
project
(660m GFA
220 mF MEZZ
TOTAL S50e?
2 TENANTS
LOADING Bay SITE COVER = 444%
(CARPARKING
REQUIRED CARS = 19 (1:50)
PROVIDED CARS = 19.
LANDSCAPING
REQUIRED 10% = 157.7"
PROVIDED 15.3% = 240.2re
OVERALL BUILDING \
. PROPOSED BUSINESS PARK
for
S & L DEVELOPMENTS
at
LOT 3 EENIE CREEK ROAD
NOOSAVILLE
drawing
BUILDING C - DRAWINGS
date AUG 07 drawn CD scaie 1:200
drawing 2.07041 SDO5 revision B
— 1
(GROUND FLOOR PLAN é meena wma
f } Scale 1:200 wmaed
N Usba07D41 Popoaee Commertio! Lt lor S- Dvesiopments Drawings ArcMCADIModehO7041 SITE PLAN phn - 4°01 PM. 1790172008
Page 15
Hobs 704 1 Popnanet Commmerie! Lol 3 far SLE Devetogmenrs\OrmmingivenCADIMOCCHOTOAT SITE PLAN ph = 4:01 PR. 3720172008
REV DESCRIPTION DRAWN DATE
RTT Nem
‘A DAISSUE TO COUNCIL WELPR 030907
8 RESPONSE TO COUNCIL ao 160108
REQUEST FOR INFORMATION,
a matte —
WEST ELEVATION
Scale 1:200
SOUTH ELEVATION
Scale 1:200
ROOF PLAN
Scale 1:200-
V
“ = |
__ 5
8
EAST ELEVATION NORTH ELEVATION
Scale 1:200
Scale 1:200
vou
FLooR
RELOW
sHoPsHONT wwe
GLAZING
TENANT 2
128m? MEZZ
FFL 8.00
i =~ ==, i - x
ee nn ee ee ee ne eee eee ee ee ee Be eee | ©) i ‘
L an = O i
SREhen Nw) I Ly
a . ee
SECTION E-E architects
. Scale 1:200 MAROOCHYDORE BUSINESS PARK
. 6/12 NORVAL CRT MAROOCHYDORE Qld 4558
& PO BOX 6232 MAROOCHYDORE BC Qld 4558
~ 4 PH : 07 5443 5028 FAX:07 5478 2380
ABN 28129917 724
BUILDING D EMAIL: [email protected]
: AREAS
§ project
SITE AREA = 1432rn? PROPOSED BUSINESS PARK
‘0anv GFA OVERALL BUILDING
128m* MEZZ GFA for
4 Bent ez S & L DEVELOPMENTS
FFL 5.00 . Boeke? TOTAL
S$
if ae RRS «1 (15004 LOT 3 EENIE CREEK ROAD
MRED eH
FFLS00 ea PROMDED CARS 1° NOOSAVILLE
------5 B22 --
LANDSCAPING
o “ REQUIRED 10% = 143.2nv drawing
TENANT 2 PROVIDED 23% = 301m
261m? GFA BUILDING D - DRAWINGS
$28? MEZZ 4
‘ Komnds ] LY" gate AUG 07 — drawn CD scale 1:200
~ ees drawing 0.97041 SDOG revision B
‘a 4 &) A :
Scale 1:200
Page 16
Nivea T041 Popoare Commerri! Lot 3 tor 8.8 Developments Drmenghre MCAD WOceNITON SITE PLAN pin - 4101 PAL. 170172008
/
Z
’
LUNE OF AWNING
-potcceT wow
I ENE OF FACADE
gle
UNE OF noun
Scale 1:200
eG
«6
|
yoo veo
FigoR Seton FLOOR BELOW
vow
FLOOR
LOW z Ei
FFL 8.00
TENANT? TENANT 8
472 né MEZZ 2.2 mt MEZZ
-ro ‘sioerRont Ayn OER
oxno
t
i I I I
] L
| v0 ve FFL 8.00 {FFL 8.00 FFL 8.00 J FFL 8.00
Fioon sevow oon ee.ow
' von woo von
\ . oon roo | foo
tetow tov | tom
| i i
| F800 FFL 8.00
1 TENANT 3 TENANT 4} TENT ‘ST me a
47.2 10 147.2 00 472 4
TENANT 1 TENANT 2
| 412.9 MEZZ 472 0? MEZZ Merz pez Mez }MEZZ
|
|
l
l
|
|
|
|
|
!
I
I
I
|
|
FFL 8.00 '
|
I
|
|
|
|
|
{CASIONAL SINGLE UNIT TRUCK
1
---4
{LOADING BAY
>| LB
I
{
{
I
I
I
4. LOADING BAY | t 2 rN Lb T LOADING BAY e T 7 LOADING | I
. . |
NF ¥ yy tr Lf
Nn TT 7 |
{ TENANT 1 TENANT 2 vena! * or PS heNanta Penang) ) oe Pt rehawres TENANT? TENANTS !
102 § a? GEA 102.5 07 GFA 102.5 m GAA rd: 41025 mr GFAP 1025mrGFA S$ 1102.5 m? GEA 102 5 ar GFA 02.5 nv GFA 1
a ' 47.2 ne MEZZ ADD MERZ FEY 47.2 oP MRZZ, | A?2m' MEZZ | 47.2 MEZZ 1 47.208 MEZZ 47.2 nt MEZZ 47.20? MEZZ FER \
i i Fei sioo VERE! — Fe 5.00 | FFL 5.00! eA a ' FFL 5.00 |
— = ’ | s
1 UNE OF MEZINONE ABO JURE OF HEZZANINE ABINE ro ! \ } Une oF uez2aune 522 fn oF MEZZO 201
pee Sree ee YJ oy ‘ j Log ol Pine or EZR Re RO ere oe :
| \ oP. ’ Dv Pty hat fry \ ape z seo
FFL 5.007 FFL 5.00 ” BZ, ude, # Hy VPoud FFL 5.00 FFL 5.007 §
' Rs L509 Bey rAdrog g FLS oF a
I > * Pi no 4 hi ae 1g mx K z 4
i ve a as si 1s al 1% PRN y > $337,
“ A Ve RR ge fy if Bu Me a A .]- “A 539
; a sb rs p joo} peal 3 a So gy Of
T cE Tv ole or Td
' . srwoe ome FER 44
\ Bear as
GROUND FLOOR PLAN
Scale 1:200
REV DESCRIPTION DRAWN DATE
| ESSE TOOL
A DAISSUETO COUNCIL WEIPE 0M?
8 RESPONSE TOCOUNCIL oa se0 08
REQUEST FOR INFORMATION
NATURAL OuSTING
‘GROUSO UNE (DOTTED)
EAST ELEVATION
Tm
‘GROUND UNE (DOTTED)
SOUTH ELEVATION
SECTION F-F
Scale 1:200
; a I
\ | Hh
\ i!
4 ee
~ a rtd
architects
MAROOCHYDORE BUSINESS PARK
6/12 NORVAL CRT MAROOCHYDORE Qld 4558
PO BOX 6232 MAROOCHYDORE BC Qi 4558
PH : 07 5443 5028 FAX:07 6479 2380
ABN 23123 917 724
EMAIL: [email protected]
project
PROPOSED BUSINESS PARK
for
S & L DEVELOPMENTS
at
LOT 3 EENIE CREEK ROAD
NOOSAVILLE
drawing
BUILDING E - DRAWINGS
cate AUG 07 drawn CD scale 1:200
arawing 0.07041 SDO7 revision B
Canyons of wes document mane #9 archane
property of SPROUT ARCHITECTS OTY LTD
ABN) 123 817 724
Page 17
| ROOF PLAN é
Scale 1:200
LE OF AN LINE OF AWNING
ELON
{UNE OF FACADE
8.55] FFL 8.55
FFL 8.55, FFL 8.55, x FFL 8.55
TENANT B TENANT Mi 2 TENANT {
493 mt MEZZ. 41,3. 0 MEZZ, 49.3. MEZZ
MEZZANINE LEVEL PLAN —_—
Scale 1:200
LOADING BAY
LOADING BAY
LOADING BAY
(1 Uoba80704 1 Poposed Commarea! Lol 3 lot SLE Covaleemen\DreningaArhICADINOdERITOL SITE PLAN phn - 402M. 1770117008
soe
p
TENANT 8 TENANT? Tente Hrdwants | renanta! So) J fenanr a TENANT? TENANT 4
102.5 mi? GFA 402 5 mm GFA 102.5 m' GFA WORS me GFA | 1025m?°GFA \ Ba 1025 m°GFA 102.5 me’ GFA. 102.5 ne? GFA
41,3 mt ME2Z AL Se? ME2Z 41.3m?MEZZ 1 45.3 mt MGZZ 4 4 44.3 mt MEZZ 44.3. MEZZ 41.3? MEZZ
c FFL 5.55 FFL 5.56 A 5
f
Fine or uzawine store nc oF wean 26H gi 3 7a cpus ne ozone
raczaneanoretncormnmnce| Bi Py, i PB Py kU mt ornezzmune anove lune of vezzanns aa
\ FFLSSS »“ |’ FFLSSS 7 g'o4 \e FFLSS5)“ |. FFL5SS ¢
Soe Noy pod! ‘ ’ x “
bn >< 5 i yt e ‘< >
Roe aN Se 8 q oy ae
S ’ a g f LP x . S : ‘AGI
a wpe NS. als a Ade 4
oF oP v
a ee foam ra
GROUND FLOOR PLAN
Seale 1:200 '
HAZING
ALUUNIUM FRAMED ———
REV DESCRIPTION ORAWN DATE
‘A DAISSUE TO COUNCIL WELPE 030807
8 RESPONSE TOCOUNCE. o e018
REQUEST FOR INFORMATION
TOOT TTT
uy
SEE
— oo =
BUILDING F
‘AREAS
SITE AREA © 207501?
‘OVERALL BUILDING
6207 GFA
‘380? MEZ2
1150er? TOTAL
@ TENANTS: _—
SITE COVER = 41%) .
—
Spratt ING
SCANRED CARS © 23 (1:50
PROVIDED CARS © 23
ANDSCAPING
REQUIRED 10% = 207 Ser?
PROVIDED 20% © 416m
SOUTH ELEVATION
Scale 1:200
MULLIN LEVEL —
SECTION G-G
Scale 1:200
EAST ELEVATION
Scale 1:200
Garant
MAROOCHYDORE BUSINESS PARK
6/12 NORVAL CRT MAROOCHYDORE == Qid 4558
PO BOX 6232 MAROOCHYDORE 8C =—QId 4558
PH : 07 5443 5028 FAX:07 $479 2380
ABN 23.123 997 724
EMAIL: [email protected]. au
aL
project
PROPOSED BUSINESS PARK
far
S$ & L DEVELOPMENTS
at
LOT 3 EENIE CREEK ROAD
NOOSAVILLE
drawing
BUILDING F - DRAWINGS
gate AUG 07 drawn CO
arwing e.07041 SDOS revision B
scale 1:200
Conymagr of tvs document wane Se niche
Froomty of SPROUT ARCHITECTS PTY LTD
ABN 123 617 724
Page 18
NAobe107041 Popoend Commercial Let 3 for SLE Devetoomens\Drawings WeNCADVodel07041 SITE PLAN pin - 4 62M. 180172008
1920
rz
ax0.
* pithy
ROOF PLAN
TENANT 2
128m? MEZZ
FFL 8.45
303m? GFA
128m? MEZZ
FFL 5.45
FFL 5.46
CARPARKING
we
GROUND FLOOR PLAN
Scale 1:200
BUILDING G
AREAS
SITE AREA = 127m?
‘OVERALL BUILDING
(600m? GFA
200m* MEZZ
800m? TOTAL
2 TENANTS:
SITE COVER = 48%
CARPARKING
REQUIRED CARS = 16 (150m")
PROVIDED CARS = 16
LANDSCAPING
REQURED 10% = 127-2n¥
PROVIDED 138% = 177 8?
EAST ELEVATION
Scale 1:200
Gaon ne OTED,
WEST ELEVATION
Scale 1:200
SECTION H-H
Scale 1:200
REV DESCRIPTION DRAWN OATE
REL
A DAISSUE TO COUNCIL WELPE 0309107
o 160108,
8 RESPONSE TOCOUNCEL
REQUEST FOR INFORMATION.
Lor wascer (OOF OVER HANG
‘WALL PANEL
NORTH ELEVATION
Scale 1:200
TTL JP WALL PANEL WEG
WITH STRUCK JOWTS WALL PANEL
SOUTH ELEVATION
Scale 1:200
Conran,
FL
- Germ
NATURAL EXTON, -
GROWO UNE (DOTTED)
architects
MAROOCHYDORE BUSINESS PARK
6/12 NORVAL CRT MAROOCHYDORE §Qid 4558
0 BOX 6232 MAROOCHYDORE BC —Qid 4558
PH : 07 5443 5028 FAX:07 5479 2380
ABN 23 123.917 724
EMAIL: [email protected]
>
project
PROPOSED BUSINESS PARK
for
S & L DEVELOPMENTS
at
LOT 3 EENIE CREEK ROAD
NOOSAVILLE
drawing
BUILDING G - DRAWINGS
cate AUG O7 = drewn CD scale 1:200
orewing 20.7041 SDOQ cevision B
be
Page 19
NAsobs107041 Popoenc Commercial Lt ler SLS GewlopmnenOrawigiiirehCAD MedeAO7D41 SITE PLAN pin - 4.53 PR. 1401/2008
ROOF PLAN
Scale 1:200
sync over
008 |
Td
TENANT 3
88.5 m* MEZZ
FFL 8.40 L
TENANT 2
88.5 m? MEZZ
FFL 8.40 L
yoo voo
FLooR
BELOW BELOW
TENANT 1
88.5 m? MEZZ
FFL 8.40
\
I
! Oo
MEZZANINE LEVEL PLAN
Scale 1:200
REV DESCRIPTION DRAWN OATE
oO
‘A -DAISSUE TO COUNCIL WELPE 00807
B RESPONSE TO COUNCIL oO e018
REQUEST FOR INFORMATION
FEATURE BADE WALL
TH STRUCK JONTS
‘shoprRoT —
GAZING
METAL SHCET
ROOFING
META SCREEN TAT ue Pant
TH STRUDK JOS |
SHOPFRONT
GLENS
‘CONCRETE SUB,
PROIECTON
NORTH ELEVATION
Scale 1:200
TUTUP Pe GLADE WALL
Ter uP PANa
wit STRUCK one) 1wsTH STRUCK ows]
v
}+——__}
NATURAL EXISTING
GROUND LINE (OOTTED)
NATAL DUSTING
‘GROUND LINE (Q0TTED)
SOUTH ELEVATION
Scale 1:200
WEST ELEVATION
Scale 1:200
en,
Grant
|
| ae
. SECTION I-I
Peg A ~ Scale 1:200
u fA Bee NE ENE soem £53. - ES
Le architects
i ok MAROOCHYDORE BUSINESS PARK
6/12 NORVAL CRT MAROOCHYDORE = Qid 4558
ae Ke BUILOING H PO BOX 6232 MAROOCHYDORE BC —QId. 4558
Al Hl wn ole fe > |e PH : 07 5443 6026 FAX:07 6479 2380
ABN 23: 123 O17 724
| ! oxy LOT8 BW) ‘ SITE AREA= 1825m? EMAIL: [email protected]
\ : ‘ MEZZANINE 15257 SHOPFRONT > te —0.0—>——ot
yt) see 7] one OVERALL BUILDING project
y T T ‘earn! GEA PROPOSED BUSINESS PARK
YY Layer IY T cron aay IY bier
\ l \ I, “ TENANTS. tor
r S 7 . 7 oy , SrEconmnearx S & L DEVELOPMENTS
: ( . ’ toy ‘ §
q | x , N + ‘ CARPARKING
” Noe ‘ Ne ' x REQUIRED CARS = 19(150m7)
| FFL5.40 »~ FFL 5.40 ' x FFLS40 | \/ PROVIDED CARS = 19 at
\ Y
. us . \ ue X ' , . Laupscarins LOT 3 EENIE CREEK ROAD
| - . ’ \ , 1 REQURED 10% + 120) NOOSAVILLE
t , . i s \ 1 x \ i PROVIDED 10% = 152.5?
4------ BLL ee
| ’ . |
J. TENANT 3 TENANT 2 TENANT 1— —-} * drawing
I | 2345 av GFA x 234.5 m! GFA Ee 214.5 mt GFA | BUILDING H - DRAWINGS
qi 88.5 m? MEZZ 4 85.5 a MEZZ N 88.5 m? MEZZ !
Al 5 ik
e -—-aT f gate AUG O7 — drawn CD scale 1:200
GO
GROUND FLOOR PLAN
Scale 1:200
drewing 0.07041 SD10 ‘vison B
$e
‘Copyngrd ofa docurnent rene ta axchuiee
$reomty of SPROUT ARCHITECTS PTY LTD.
AGN 23 123017 724
Page 20
N WobsW07041 Paposen Commie! Lal for SLE Developmen ADrncingaihrcNICADWodenO?O41 SITE PLAN pin - 4 STEM. 18/01/2008
%
!
1
I
1
e552
!
ad. = ! &
zs !
— [
caxtuensen i
Semin BELOW |
ae I
\
re \
\
gaz ™ \
‘
\
\
\
C7 ar \
ROOF PLAN
Scale 1:200
L !
1
| !
$ ~~ Verret | ft
| t
{ ‘
i TENANT1 '
Se ert i
oe mx | [2 5
, ~ —— |EVERED
faminG OR 1
1
1 '
'
\
v0 2
Hook \
auoW
\
TENANT 2 }
50m! MEZZ \
i FFL 8.25 \
EEE :
iH \
~--- eee ee ee ,
MEZZANINE LEVEL PLAN
Scale 1:200
1
\ ;
1 ‘y 2 ae, g
TENANT 4 VON oe g
4 350 GFA to 1, smo g
> 14 | aman,
| SomP MEZZ 7 p vas
* FFL 5.25 Ch
HF
wezane
LOADING BAY OvER
~~
: 7
{ TENANT 2 ) 3
350m? GFA
50m! MEZZ
CARPARKING
*
Lao
GROUND FLOOR PLAN __
“Scale 1:200
CANTLEVERED
am
NATURAL EXISTING
EAST ELEVATION
REV DESCRIPTION DRAWN DATE
Oot
A DAISSUE TO COUNCIL WEIPE 030907
B RESPONSE TO. COUNCIL oo 160108
REQUEST FOR INFORMATION
Ta UP WALL
PANEL wit
STRUCK JONTS.
ANG.ED FACADE:
GROUND UKE DOTTED; GROUND UKE (DOTTED)
NORTH ELEVATION
Scale 1:200 Scale 1:200
L NATURAL EXTING.
BUILDING |
AREAS
SITE AREA = 145Sm?
OVERALL BUILDING
‘Toon? GFA
‘$00e* MEZZ
800? TOTAL
2 TENANTS
SITE COVER = 50 6%
CARPARKING
REQUIRED CARS = 16 (15007)
PROVIDED CARS = 16
LANDSCAPING
REQUIRED 10% =u!
PROVIDED 13.2% ®
‘GROUND LW (DOTTED)
WEST ELEVATION
{TURAL OST
‘GROUND UNF (DOTTED)
SOUTH ELEVATION
Scale 1:200
Scale 1:200
TATU HAL
ane wT ~ |
SECTION J-J
(GROUND UWE (DOTTED) ee
architects
MAROOCHYDORE BUSINESS PARK
6/12 NORVAL CRT MAROOCHYDORE = Qid 4558
PO BOX 6232 MAROOCHYDORE BC Qld 4558
le 1:
Seale 1:200 PH : 07 $443 5028 FAX:07 $478 2360
23: 123.917 724
[email protected]
ABN
EMAIL:
project
PROPOSED BUSINESS PARK
for
S & L DEVELOPMENTS
By
LOT 3 EENIE CREEK ROAD
NOOSAVILLE
drawing
BUILDING I - DRAWINGS
date AUG 07 drawn CD scale 1:200
drawing 2.07041 SDAL cevision B
XQ
Copyngnt of tea document rein Ye axchuahe
propery of SPROUT ARCHITECTS PTY LTD
AGN 23.12) 917 724
Page 21
1 obs107D41 Poposad Commercial Lot ler SLS OevslopmentiSridngaV\rchiCAD Mod4hOTDAI SITE PLAN pin - 4.59PM. 1601/2008
|
1
|
|
|
|
|
|
|
|
|
t
I
I
I
I
1
L _
| 6
; ROOF PLAN
Scale 1:200
OVER Leoc
FFL 8.20 } FFL 8.20
|
\
|
I
\
\
\
I
\
I
\
\
I
|
\
\
\
L
L-
yn
LOT 10°
1721 /
FFL5.201 \
' Vy
' vv
TENANT 1/4
102 rh GRAY
55 rh MEZA.
hy
ty
My
GROUND FLOOR PLAN
PACKED END WALL —)
REV DESCRIPTION DRAWN DATE
OTN -an0— OOO
‘A DAISSUE TOCOUNCIL WEUPR OyOUNT
B —_RESPONSE TO COUNCIL @ 160108
REQUEST FOR INFORMATION
‘SHOPFRONT
GAINS
NATURAL EXSTING
(GROUND LE (DOTTED)
EAST ELEVATION
Scale 1:200
NORTH ELEVATION
Scale 1:200
METAL ROOF “—
FTO TTT PETTITT
TTT
aTuRAL ESTOS
‘GROUND LME DOTTED:
WEST ELEVATION
Scale 1:200
BUILDING J
REAS
‘SITE AREA = 1721?
CARPARKING
REQUIRED CARS = 24 (150m)
PROVIDED CARS = 24
LANDSCAPING
REQUIRED 1x72 1
PROVIDED 14.9% = 257 tr?
RACKED ENDWALL — meme
SECTION K-K
Scale 1:200
CAlcuie
architects
MAROOCHYDORE BUSINESS. PARK
6/12 NORVAL CRT MAROOCHYDORE = QId 4559
PO BOX 6232 MAROOCHYDORE BC —Q/d 4558
PH : 07 5443 5028 FAX:07 5479 2380
ABN 23423.917 724
EMAIL: [email protected]
>
project
Bet PROPOSED BUSINESS PARK
for
S & L DEVELOPMENTS
at
LOT 3 EENIE CREEK ROAD
NOOSAVILLE
grawing
BUILDING J - DRAWINGS
date AUG 07 drawn CD scale 13:200
sawing nc. 07042 SDL2 cevison B
{
Copeman document amare be BxvNe
sromany of SPROUT ARCHITEGTS PTY LTD.
d ABN 21 179 917 724
Contractors are 20 vecty al canenasona and levels on
X site rar to enmmancng Ragan a GACrepArenE ©
\ (a Arcniect Usa Rgued crnentione m preference
‘eacalee
t
Page 22
REV DESCRIPTION DRAWN DATE
pt
A RESPONSE TO COUNCIL o 180106
REQUEST FOR INFORMATION
BUILDING F |
BOUNDARY
BUILDING J | BUILDING |
N
BUILDING H | BUILDING G
| ‘ben WDE FIRE BUFFER:
ROCOMEUSTRLE MATERALS
NO URDSEAPNO
RENE
ROAD
wencreue sssagon_] sme!
GREGG Vom DETALS LINE (DOTTED) UNE (DOTTED) UNE (DOTTED) |
C. SITE SECTION 1
Scale 1:250
i BUILDING K BUILDING A BUILDING B — i
NO COMBUSTIBLE MATERIALS-
a Vv
yn
Lc Tobead
UU ie ob Th
. eee pe MeL LL ee ee ee ee rr Maen fone ee =
a a 4 Y
| , WATURA GROUND __|
ween
— SITE SECTION 2
Scale 1:250
| BUILDING J BUILDING A 7
] |
| |
+ rocoesst ae waters:
NOLANDSCAPNG
Re et ee oe ey
vee Ne cone N 4 ei
Tot meee ee eee ee AM wins, “=
{ NATURAL GROUND KOADLEVELS TORMAON
[UME DOTTED (GREGG VOM DETARS,
BUILDING B
sewoc rac eurrer
<1 — roconeust ef waters
| RoUNoaRAPAG ee ay r
| wd
r © | Y
1 Mee a
— — .
architects
' Oe BUSINESS PARK
6/12 NORVAL CRT MAROOCHYOORE Id 4558
BUILDING G BUILDING D i PO BOX 6232 MAROOCHYDORE BC aa 4558
| j PH : 07 5443 5028 FAX:07 5479 2380
I ABN 23.123 917 724
° 7 re \ EMAIL: admin@}sproutarch.com au
CLOLT YE -—————_-- a*nv—\roonooTt
1} SEE waa
th = iat CER ia PROPOSED BUSINESS PARK
fn t none a a a Settee eos eb ee Re bs wore tor
i cA . J ' S & L DEVELOPMENTS
! ineworttoy Geecovouoerad iam tne Dorn) !
“\ SITE SECTION 5 . x
Scale 1-250 LOT 3 EENIE CREEK ROAD
NOOSAVILLE
el BUILDING F — BUILDING E zl
3 i '
* 1 drawing
Y \ SITE SECTIONS
1
<4 felon reas date AUGO7 = drown CD scale 1:250
HO LANDSCAPING
| drowing. 0.07041 SD13 vision A
4 ’
1 fo Cooma of wes docienart mane fo exchANe
ooay Seat AACATEETS PTY LTO
! ABN 25173917 TH
Scale 1250 YS “eee
N:obait7041 Poomed Commerc! Lot 3 it BLE DevelopmentiDraminga\AreniCAD\adehO7041 GITE PLAR pin - 402 PM. 170172008
Page 23
EASEMENT A TO BE EXTINGUISHEO AFTER
CONNECTION OF NEW POWER TO
SEWERAGE PUMP STATION. DEVELOPER
TO ARRANGE ALL NECESSARY CONSENTS
{NOOSA SHIRE COUNCIL AND ENERGEX).
+PREPARATION OF LEGEAL DOCUMENTATION
ANS LODGEMENT AT TITLES OFFICE. ALL
COSTS TO BE MET BY THE DEVELOPER,
MANHOLE MUST BE RETAINED
AS 4S.
7 a“
CONSTRUCT NEW MANHOLE OVER
EXISTING LINE. WORK BY
APPROVED CONTRACTOR. .
LOT.5.-
0S2- OPEN SPACE ~
{ENVIRONMENTAL AREA)
Hi <2
r= os " JG,
SEE ULE - 7 Ba RN AE = Seog:
ae, nH - DRAINAGE AREA} Yo, TT RVTRRMAS SES <=
. me MH NV 11701703 77) a a ~
NS . oe s 150 HCB MH stub gg ‘APPROVED CONTRACTOR TO CAP
N : 2-—ENERGEX EARTHWORKS... a ~ internal drop} iy Nee 2, AND SEAL EXISTING 300mm DIA
A\ ee SL 3.20 Pati ‘Saf sewer EXTERNAL TO NEW MANHOLE
IL 0.40
NV11738701 ~
SL4.30.
MH NV 11/38/01
2x150 HCB MH stubs
Sl 4.575
iL 0.800
BASE TO SUIT.
/ '
&
Pr
a
i
=
lee
im
1S
1a
I
roy ee
EXISTING SEWER TO BE REMOVED
ANO RECONSTRUCTED AS DETAILED.
MEK NV 11701704
2x150 HCB MH st
\ SL 3.95
+ IL 0.40
ubs
APPROVED CONTRACTOR TO CAP AND SEAL
EXISTING 300mm DIA SEWER EXTERNAL TO
™ ~ MANHOLE AND REBENCH BASE TO SUIT.
- . Ree ee an KE Hn ge 5 - - - - - = - GR KG YAK ---- ----- i —T
= oe
<TS Lt
225BVC tts —y 50.250 2258vC } 00.26 90.65, 138 ve ne 2 NV 11/01/05
J eG sits = se ¢ |, Sse eg SS ee he
Sy NV I01709 NV11017084X NV 11701707 NV 1701706, 9 % his LEGEND
“es SL4.85 —_ “2 \ fffer REFER DWG M3048/C57 SITE LAYOUT
% foe FOR ND ANI ENERAL SEWER NOTESS
APPROVED CONTRACTOR TO CORE ORILL NEW CONNECTION INTO 4 EXISTING BULK SEWER DISPOSAL SYSTEM AT EXISTING SEWER INSIDE EXISTING BOUNDARY \2 LEGEND AND G 907
EXISTING MANHOLE AND CAP EXISTING 225mm DIA SEWER EXISTING RENE STREET PROPERTY BOUNDARY (78-80 RENE ST) TO BE MODIFIED BY NOOSA S
EXTERNAL TO MANHOLE AND REBENCH BASE 70 THE TO 8E RELOCATED TO NOOSA SHIRE COUNCIL SHIRE COUNCIL AND CONVERTED TQ INTERNAL \ SEWE RAG E LAYOUT PLAN
306 ( SATISFACTION OF NOOSA SHIRE COUNCIL WATER & SEWERAGE SATISFACTION AT DEVELOPER'S COST. HOUSE DRAINAGE/PRIVATE SEWER. ALL \e
SP 104321 @ CAPITAL WORKS MANAGER, MIKE FROUDE, ph 5449 S288. ° ws BY NOOSA SHIRE COUNCIL AT COUNCIL \3 1 5 * 6 2 Ss ite
EXISTING 225mm DIA SEWER ACROSS RENE STREET IS 70 BE NOTE: EXISTING SYSTEM MUST BE MAINTAINE| ST. \
CAPPED AT THE MOST UPSTREAM END AND ABANDONED. UNTIL_NEW SYSTEM (5 OPERATIONAL. \. SCALE 1500 AT At
Se! \
NOTES: TITLE: PROJECT: DAE MARCH 2007 | scale AS SHOWN
Lies 1 the property of the engaeer, ond any cet | ZAN BARLOW GREGG 322>a78_| SEWERAGE LAYOUT PLAN LOT RECONFIGURATION at ves ant] ween
vane eben geonee sn ogee | | LEB san 7 93 Aon wD SHEET 3 OF & LOT 1 SP 182880 ee se tn ee
wi i r. Z
» [rome scusens nerve [at irons wes rcv eceeseme| | [Ge gy” > Base ms rams Us EENIE CREEK ROAD ea cris #1990
( | FOR CONSTRUCTION ISSUE - MINOR BDY CHANGES 18/30/47 | KT 9. Box 268. - _ .|
¢ |Fo constaucri issu = swwoR soy cwances | | mere iar 2. Faqared aensions rake precedeace over scale. aera Pa Ben coat coast: | sssoatto conan NOOSAVILLE PROJECT -SUBSET-SHEET-REVISION
1 | Seine Oe womes Meewobae Revisions 3ersgcanl nr 3. Weny el carson on sie Par KEN HICKS & ASSOCIATES M3048 - C60 D
No. Amendment Date |6y|No. Amendment Date |By teaaPratiergegg.ct Ph: {07} 5443 2864 Fax: (07) $443 7166 7
Page 24
7
RENE STREET
: »
PROPOSED LOCATION OF
32kL DETENTION TANKS
INDICATES PROPOSED
BIORETENTION AREAS
\
minim
l PIE
\4 PROPOSED LOCATION OF|
32k RAINWATER t
HARVESTING TANKS
OT 3
PROPOSED LOCATIO!
32kL DETENTION (TANKS,
I< proposed LOCATION OF
32kL DETENTION TANKS
HARVESTING TANKS
t— | —“=— PROPOSED LOCATION OF
___ 32kL_ RAINWATER
SITE DESCRIPTION
LOTS 1 ON SP182880 € 5 uw B&B mw Boe
PARISH OF TEWANTIN
COUNTY OF MARCH SCALE, 1500 @ At
EEA EEE OOO EEE XE EEE EEE EE:
OK KE KEELES KEEX EE EEE
REXEEEE
NOTATION
—
===
INDICATES STORMWATER
FLOW DIRECTION
INDICATES PROPOSED
BIORETENTION AREAS
LOT 3 STORMWATER
FLOW DIRECTION
No. Amendment Date |By|No
Amendment
Date
By
NOTES:
A. This 1s the property of the engneer, and may noi
be used. coped, of reproduces wholly. of in part
without the express permission of the engneer.
Iniringesent m ony way may result n legat actor.
dumensions take precedence over scaled.
all dimensions on site.
B
GL
ry
BARLOW GREGG 3722 4
‘ABM T7114 957 363 ACH 116 957 345
TITLE:
LOT 3 STORMWATER
FLOW DIRECTION
SCALE AS SHOWN
SUNSHINE COAST: Feat
Vi81 Brabene Reco Prase
7.0. Gas 700,
Noslealape GLB. 2557
See O6E
ASSOCIATED CONSULTANTS
KEN HICKS & ASSOCIATES
Ph: (07) S463 2846 Fax: (07} $643 716
apeaaven
APE
PROJECT-SUBSET-SHEET-RE VISION
PROJECT: DATE DECEMBER 2007
RETAIL BUSINESS SHOWROOM & cso a
COMMERCIAL BUSINESS OFFICE { o~ NRT
iat 26 EENIE CREEK ROAD recat
INOOSAVILLE
M3048 -
SK05
Page 25
S|_Lots
2 2
= [sin SURFACE [NATURAL SURFACE ~
DATUM 2.00 _ 1
CROSS SECTION Ga)
RENE ST__| >> = |_LoT s
5 Eston SURFACE punes SURFACE 5
Le - ee N\ _
DATUM 2.00 _—
CROSS SECTION Gas)
EXIST LOT [>
° CUL-DE-SAC Bl_10T $
gS [DESIGN SURFACE —_ SURFACE a
aA
DATUM 2.00
CROSS SECTION @)
> .
3a
EXIST LOT | =
5 CUL-DE-SAC | Lors
ps SURFACE [ NATURAL SURFACE =
DATUM 2.00
CROSS SECTION >
Exist LOT |S as}
5 CUL-DE-SAC [lot 5
Ss esis SURFACE tr WATURAL SURFACE a
ko f S| NOTE
—_—_ — —— * MAXIMUM BATTER SLOPES 1 in &
— ° RETAINING WALLS AS LOCATED ON
DATUM 2.00 DWG M3048-SK03
. CROSS SECTION @)
3 \SK03/
-EXIST LOT | 8
8 [DESIGN SURFACE NATURAL SURFACE mpl
[— : < ;
— — — -~ — a a
DATUM 2.00
CROSS SECTION &
Wonaontl seate 0 \seay LOT 3 CROSS SECTIONS
Vertical scale 1:100
NOTES: TITLE: PROJECT: cate OECEMBER 2007 | scat AS SHOWN
{Ths 5 the property of the engneer, and aay cet | ESSN BARLOW GREGG essa | LOT 3 PRELIMINARY LEVELS JRETAIL BUSINESS SHOWROOM &{ usin dae | sePnove0
(ees. ode erect we pert B ABM T7 116 $57 363. ACH 116 857 363 CROSS SECTIONS A TO F COMMERCIAL BUSINESS OFFICE | NRT
wirgeen! ey voy oy tes lel . G oD SUNSHOVE COAST: FRASER COAST: lat 26 EENIE CREEK ROAD ECKEO arta
| 2 Figured dimensions take precedence over scaled. ASSDCATED CONSTANTS NOOSAVILLE PROJECT -SUBSE T-SHEET-REVISION
1 Yendy ll doenons ona cy KEN HICKS & ASSOCIATES KOb
No. Amendment Oate |By|No. Amendment Oate |By Teteaptoyeeonpensanns Ph: (07) S643 2864 Fax: {07 5463 7146 M3048 ~ S 0
Page 26
4
LOT 5
Ga Gi Ga Gay
x
)
Mbt titi titi di Libbbbe
Lith
LJ
\
HHH
%
FFL 4.75
FFL 4.70
FFL 5.00
FFL 4.95 |
»
1%
WET
LL-H
TTTTPT TTT
Mee
—>
UIT =
LLL
TTT is TTL
TTTTTITITWTTTle
SKO4
§)|iels fll i Lf SK04
LL HER an 3 E
o po —
FFL 5.20 -— 7 7 | | [—— 3 E_
[— .
FFL S.25 [ FFL 5.40 ‘a | E
— 5.45 E
Ls -— LE
a eet eet E-
SEES sooo Romooorr C
SITE DESCRIPTION
LOTS 1 ON SP182880
PARISH OF TEWANTIN
COUNTY OF MARCH
so * 6 WH te
et
SCALE: £500 @ Al
Sw
mS
MS
=)
MS
EXISTING LOT 279
LOT 3 PRELIMINARY LEVELS
No Amendment
PROJECT:
NOTES TITLE:
1 tes the oropety of the anges, sod woy cor | EN BARLOW GREGG 34 75<-A_|LOT 3 PRELIMINARY LEVELS
roe ty ont | UR crane ones
y may cesull w legel ccton. SG SUNSHAE COAST: FASE
¢ precedence over scaled. 0. bos CORAL TSR TED CONSULTANTS
a C7 Reuse meets KEN HICKS & ASSOCIATES
eeteeg etry cen te Proven us wt __| Ph: (07) 5463 2844 Fox: (07) S463 7146
INGOSAVILLE
NOTATION
KKK KK RX XR INDICATES EXTENT OF
Datt OECEMBER 2007
RETAIL BUSINESS SHOWROOM &|
COMMERCIAL BUSINESS OFFICE
at 26 EENIE CREEK ROAD
PROJECT-SUBSE T~SHEET-REVISION
M3048 -SK03
Page 27
STORMWATER MANAGEMENT PLAN PART B STORMWATER QUALITY PROPOSED INDUSTRIAL AND EDUCATION DEVELOPMENT LOT 3 EENIE CREEK ROAD, NOOSAVILLE for KEN HICKS & ASSOCIATES M3048 December 2007 BARLOWGREGG VENA.
Page 28
STORMWATER QUALITY MANAGEMENT PLAN 2 TABLE OF CONTENTS 1.0 INCFOGCUCTION..............:ccsscesscssscesscesssccssscssssseesscessseressoseesssssseseseceececeeecescneeeeseneee 3 2.0 Pollutant Export Modelling..............ssssssscccssssscsssscssssssssssessesstsessseesecsnsarees 4 2.1 — Water Quality Objectives oo... cecccccceccecseeseeceeseestsenscnecseesenecsesseesenees 4 2.2 -— Treatment Nodes............ wd 2.3 — Rainfall Data................. wd 2.4 — Assessment of Results. a) 4.0 CONCIUSION ........cccsssccsscsesecsssessesssssscssccrcesssccsccsecsenscessccssccsesseosesocoesecsenecesease 6 APPENDIX A.............00e008 Proposed Development Layout APPENDIX B...........-0ceeeeee MUSIC Output APPENDIX C..........0seeeeeeee Preliminary Drainage Details BARLOW GREGG VDM M3048 DECEMBER 2007
Page 29
STORMWATER QUALITY MANAGEMENT PLAN 3 1.0 Introduction Part B of this Stormwater Management Plan aims to outline stormwater quality objectives and how they will be achieved for the proposed industrial and education development at Lot 4 Eenie Creek Road, Noosaville. The specific objectives of Part B are as follows: + Determine post-development water quality; + Identify relevant water quality objectives (WQO's); « Outline how the WQO's will be achieved. The Model for Urban Stormwater Improvement Conceptualisation (MUSIC) has been utilised to model predicted pollutant export loads and concentrations, and assess the suitability of a range of treatment devices. The site of the proposed development is approximately 2.08 Ha in area and is currently vacant. The site slopes at an approximate gradient of 1% generally towards the east of the site, into OS4, and eventually into Eenie Creek. OS4 is designated as Open Space (Environmental Drainage) under the Noosa Plan and as such no development works may be carried out in this area. The site has no upstream catchment. The proposed development involves the construction of several industrial tenancies and an education facility, with both being serviced by a central access road. Access to the site will be provided from the proposed Rene Street extension that skirts the north of the site. The proposed lawful point of discharge for the site is the north eastern corner of the lot where runoff will be discharged into OS4. The proposed development layout is attached in appendix A. BARLOW GREGG VDM M3048 DECEMBER 2007
Page 30
STORMWATER QUALITY MANAGEMENT PLAN 2.0 Pollutant Export Modelling As previously mentioned the MUSIC modelling software was utilised to predict performance characteristics of the proposed water treatment train. Modelling parameters were set up in accordance with Brisbane City Council's recommendations as specified in “Guidelines for Export Pollutant Modelling in Brisbane Version 7” (October 2003), and Gold Coast City Council’s “MUSIC Modelling Guidelines” (2006). The node layout of the music model is provided in appendix B. 2.1 — Water Quality Objectives This model uses the water quality objectives set out by Noosa Shire Council. A summary of the key indicator standards is set out below in table 2.1. Table 2.1: Noosa Shire Council Water Quality Objectives Indicator % Reduction Value Total Suspended Solids (TSS) 90 15 mg/L Total Phosphorus (TP) 70 0.05 mg/L Total Nitrogen (TN) 50 0.5 mg/L 2.2 — Treatment Nodes The recommended BCC values for commercial source nodes have been used in MUSIC to generate predicted pollutant loads from the site. The following devices have been used in the treatment train to reduce these pollutant loads to an acceptable level. + Gross Pollutant Trap — The model has used a GPT at the downstream end of drainage systems prior to discharge. This GPT was modelled to remove 90% of gross pollutants for up to a Q3 month ARI storm. The exact location of this GPT's will be detailed on future operational works drawings. + Bio-Retention Areas ~ These areas will be placed at the edges of carparks around the site, and adjacent to the eastern boundary. These areas will have an extended detention depth of 0.15m with a combined storage surface area of 3 10m’. The filter material will consist of a 0.4m deep sandy loam layer overlying a 0.1m deep drainage layer. The total area of bio-retention is to be 310 m’. Perforated pipes in BARLOW GREGG VDM M3048 DECEMBER 2007
Page 31
STORMWATER QUALITY MANAGEMENT PLAN 5 the bottom layer will carry flow to the outlet of the bio-retention areas. The location of these bio-retention areas is shown in appendix B. - Rainwater Tanks — These tanks will be positioned the proposed carparks. Runoff will be collected from the roof of the development at a rate of 151/m? of roof. This results in a total volume of rainwater storage of approximately 113kL. Water collected will be used for irrigation or other external uses 2.3 — Rainfall Data Rainfall data for the site was chosen to give the best representation of actual conditions to be expected. The meteorological data selected in the MUSIC program was the Cooroy 30/11/1980 — 31/05/1990 data provided by the Bureau of Meteorology, using a 6 minute time step. This period of data was used as requested by Noosa Shire Council. 2.4 — Assessment of Results The specified water quality objectives have been met on the subject site for total suspended solid (TSS), total phosphorus (TP), and total nitrogen (TN) concentrations through the use of a gross pollutant trap, rainwater tanks, and bio-retention areas. Appendix B contains the following MUSIC output: « Flow based sub-sample daily mean cumulative frequency graphs, « Treatment train effectiveness for the system, « Node Layout Table 2.3 below indicates the predicted export pollutant concentrations calculated by MUSIC; Table 2.3: Predicted Post-Development Treated Water Quality Indicator % Reduction Predicted Value Tota! Suspended Solids (TSS) 98.6 0.201 mg/L Total Phosphorus (TP) 78.5 0.0105 mg/L Total Nitrogen (TN) 50.0 0.129 mg/L BARLOW GREGG VDM M3048 DECEMBER 2007
Page 32
STORMWATER QUALITY MANAGEMENT PLAN 6 4.0 Conclusion Part B of this stormwater management plan has outlined the stormwater quality objectives for this development and how these will be achieved. Predictions from the MUSIC software have been used to measure the performance of the proposed stormwater treatment train. Modelling shows that Noosa Shire Council requirements can be met for total suspended solids, total phosphorus, and total nitrogen concentrations. BARLOW GREGG VDM M3048 DECEMBER 2007
Page 33
APPENDIX A PROPOSED DEVELOPMENT LAYOUT
Page 34
Page 35
APPENDIX B MUSIC OUTPUT
Page 36
MUSIC Model Layout S Ss Other Roof NY, Rainwater _ Bio-Retentiot GPT 1 Receiving Node
Page 37
Receiving Node 19/12/2007 10:13:36 Treatment Train Effectiveness Flow (MLiyr) TSS (kg/yr) TP (kg/yr) TN (kg/yr) Gross Pollutants (kg/yr) sources 32.5 7.06E3 13.8 67.4 749 tesidual Load 27.9 401 2.98 33,7 0.00 4 Reduction 14.1 98.6 78.5 50.0 100.0
Page 38
music dec - Receiving Node Total Suspended Solids contains all data r 1 ' 1 1 ! t ' ' 1 1 i — Concentration In
Page 39
music dec - Receiving Node Total Phosphorus contains all data — Concentration In
Page 40
music dec - Receiving Node Total Nitrogen contains all data 100-4 Fae fee oe 2 eee ee Saget cb ee et — Concentration In
Page 41
APPENDIX C PRELIMINARY DRAINAGE DETAILS
Page 42
1 PROPOSED LOCATION OF
32k. DETENTION TANKS.
RENE STREET
PS PROPOSED LOCATION OF
32KL DETENTION TANKS
Yt PROPOSED LOCATION OF}
+ | 32kL, RAINWATER
* THARVESTING TANKS
J PROPOSED LOCATION OF
32kL RAINWATER
HARVESTING TANKS
NOTATION
BOLATES STOPHWATER
~_ FLOW ORECTION
(NOK ATES PROPOSED
= BIGRETENTION AREAS
open em LOT 3 STORMWATER
Pi 10} WN =
COUNTY OF MARCH SAE ISI 2 41 FLOW DIRECTION
TLE PROKECT mr DECEMBER 7UBT | wee AS SHOWN
LOT 3 STORMWATER RETAIL BUSINESS SHOWROOM &[ as Pe | erro,
: FLOW DIRECTION OMMERCIAL BUSINESS OFFICE [> pat
' ' + 26 EENIE CREEK ROAD Ser rere
Kear NOOSAVILLE PROJECT-SUBSE1-SHEET-REVISION
i ‘aman Spaeth ia Lictr nanan a ‘ M3048 - SKOS
Page 43
I — — TRAFFIC IMPACT a= ASSESSMENT ft mS PROPOSED BUSINESS PARK, LOT 3 EENIE CREEK ROAD, NOOSAVILLE ~ QUEENSLAND Ie A I = — j Hl yO a REPONSE TO INFORMATION REQUEST FROM NOOSA COUNCIL I: January 2008 i _ Job No: QC070576 Report No: 4686-1 Prepared For: S & L Developments Pty Ltd
Page 44
DOCUMENT CONTROL SHEET BURCHILL VDM PTY LIMITED Evandale Place 142 Bundall Road SURFERS PARADISE QLD 4217 Telephone: +61 7 5574 0511 Fax: +61 7 5574 0011 Email: [email protected] Job No. QC070535 Report No. 4686-1 Original Date of Issue 10" January 2008 Project Leader Dale Kleimeyer REPORT DETAILS Title: Traffic Impact Assessment Proposed Business Park Lot 3 Eenie Creek Road, Noosaville, Queensland Response to Information Request from Noosa Council Author(s): Aftab Ahmed Abro — Traffic Engineer Client: S & L Developments Pty Ltd Client Contact: Client Reference: Synopsis: The report analyses the traffic impact of the proposed business park development on the surrounding road network and identifies any road/intersection upgrades that may be required as a result of the development. REVISION/CHECKING HISTORY REVISION DATE CHECKED BY ISSUED BY DISTRIBUTION - NO. OF COPIES NUMBER Client Other BP 4686-0 DTK 4686-1 OTK 4686-1 January 2008 ven BURCHILL VDM
Page 45
TABLE OF CONTENTS 1.0 Introduction 2.0 Existing Conditions 2.1 Subject Site cece erre reer rerseeeeeceeeteeersieesneeenessnetenteetneesnney 3.0 Proposed Development 3.1 COMPOSITION... cc cececet cnc rete ene cnee teat eneeesaeersestsescaeecieeensasesesneesnaesennees 3.2 Vehicular ACCESS 0.0.0.0... iccece ct eset eeeeeeeter eee te eter erin ieetneeernenieneene 3.3 Traffic Generation... ccccccccccceesenseeeeseesseeeeecceceeseeeeesensentneeeseseenssaaeeteess 3.4 Trip Distribution & ASSIQMMENt 0.0.0... ccc tet etter rteeeere terse ree ceeetieeetaeens 4.0 Traffic Impact 4.1 Intersection Operations 0.0... eee ee reer cere e rere eerrneeseeneessenieeeciaeeeenies 5.0 Response to Information Request LIST OF TABLES Table 3.1 — Composition of Proposed Business Park Table 3.2 — Trip Generation Rates Table 3.3 - Trip Generation Table 4.1 — Result Summaries for the Loop Road / Connector Road Roundabout Table 4.2 — Key Performance Indicators: Loop Road / E5 & B3 Access Roundabout LIST OF FIGURES Figure 1.1 — Site Location Figure 2.1 — Site Locality Plan Figure 3.1 — Estimated Evening Peak Traffic Demands on Loop Road Figure 4.1 — Proposed Loop Road / Connector Road Roundabout Figure 4.2 — Proposed Loop Road / E5 & B3 Access Roundabout APPENDICIES Appendix A — Site Layout Appendix B — Sidra Summaries 10 41 oo Oo fh W Jenvaty 2008 vem BURCHILL VDM
Page 46
1.0
INTRODUCTION
Burchill VDM Pty Ltd has been commissioned by S & L Developments Pty Ltd to
conduct a Traffic Impact Assessment (TIA) of a proposed Business Park on the
southern side of Eenie Creek Road in Noosaville. The site is located in the area
identified as the ‘Shire Business Centre’ (SBC) in the Noosa Plan, as shown in
Figure 1.1.
Se
W
» Road
NOOSA
JUNCTION
sii ose d
Cantre
Figure 1.1 — Site Location
This report has been undertaken in response to an information request from
Noosa Council in relation to the traffic impacts on the external state controlled
road network and internal car park layout. The Information Request from the
Council was sent to S & L Developments Pty Ltd dated on 23" October 2007.
This Traffic Impact Assessment assesses the traffic requirements and implications
of the proposed development. The report also considers the potential traffic
generation of the proposed development and examines the adequacy of the
internal site layout.
4686-1
January 2008 vem BURCHILL VDM
Page 47
2.0 EXISTING CONDITIONS
2.1 SUBJECT SITE
The subject site for this assessment is proposed Lot 3. In the SBC Masterplan, the
subject site was designated for ‘Employment (Environmental R&D Business &
Offices). The relative location of the site, within the SBC is provided in Figure 2.1,
and is labelled as E3.
<p *
OSES ae, gee —
Pete
ten EGENG
BY @S¥is5
{Rend Conta oat Cavrers}
PBLSNESS
{Car Aurting & dtton}
SUS NOSS.
{Svewrsers, OfFee & Cnsenrs!
i
Event ee
(Temcocia & Eneksemente|
Guster & Cii.cee]
evFuo“wEnT
(frecemeuol iat
Beers & ces,
EUPLOWMENI
EVPLOWMENT
(Pecatzy & Minrenn)
CA eee
(recadey & Sinerees)
TuPLoMt 7
(Pein FFtea & frorwt)
CvFLomenz
Ey (Barer & en}
| Joms cers sare
(Evearmesia’)
} Jone cece space
b (Emeuemevoi]
a
(CSS CREW SPACE
[Preamvalion af Vint ‘secnty)
Sa CPEN Space
(Esseormanic) Crane)
GBS CORN SHALE
Preservation st Vtual Aowsly]|
O96 WE SPACE,
Peesaareetion at Yituct Arse)
OST LOEW SPACE
(E-veremtial Grerage)
RRS spar
Paxson Suseeet)
SPLSRATION MEE DST
(Mei reereatses
treo esd
open aporet
j——.—— — — REYELE ATH
ELICNG, PASH
RAE £200 OD an ip eee 1
jon 2003 fff” Caetn Fe | i
& = ~~ -
Too s2 SUN [
NOOSA SHIRE BUSINESS CENTRE
MASTER PLAN - STAGE 2 - MP2 PLAN
Figure 2.1 — Site Locality Plan
senvaty 2008 vem BURCHILL VDM
Page 48
3.0 PROPOSED DEVELOPMENT 3.1 COMPOSITION The proposed development mainly comprises of light industry land use. An education training centre with an assumed capacity of 35 students, together with an ancillary (conference facility and gymnasium) have also been proposed as part of the development. The uses and the scales of the proposed development are detailed have been shown in the Table 3.1. Table 3.1 — Composition of Proposed Business Park S.No Land Use STi Quantum 1 Gymnasium 100m? GFA 0.72 2 Conference / Meeting Room 100m? GFA 0.62 3 Education Training Centre : 100m? GEA 2.79 4 Buitding A (Light Industry) 100m? GFA 9.50 5 Building B (Light Industry) 100m? GFA 8.00 6 Building C (Light Industry) 100m? GFA 9.50 7 Building D (Light Industry) 100m? GFA 8.00 8 Building E (Light industry) 100m? GFA 41.97 9g Building F (Light Industry) 100m? GEA 11.97 10 Building G (Light Industry) 100m? GFA 8.00 11 Building H (Light Industry) 100m? GFA 9.50 12 Building 1 (Light Industry) 100m? GFA 8.00 13 Building J (Light Industry) 100m? GEA 10.50 A layout of the proposed development is provided in Appendix A. 3.2 VEHICULAR ACCESS The proposed development would gain access on Rene Street and link to the Loop Road at the north of the subject site. 3.3. TRAFFIC GENERATION In order to establish the traffic volume that would result from the proposed development, a range of sources were consulted. Trip generation rates for the proposed development were referenced from the DMR Road Planning & Design Manual (RP&DM), Chapter 3, and the RTA Guide to Traffic Generating Developments (GTGD) Chapter 3. The adopted rates are summarised in Table 3.2. It is noted that conference / meeting facility would only be used occasionally and would not generate trips during the peak hours as other land uses of the proposed development. It is also noted that the gymnasium will only be opened to site users 4686-1 January 2008 vem BURCHILL VDM
Page 49
and therefore the trips from the conference / meeting facility and gymnasium have not been considered in the assessment. Table 3.2 — Trip Generation Rates Student 0.2 02 100m? GFA 0.72 0.9 100m? GFA 0.72 0.9 100m? GFA 0.72 0.9 100m? GFA 0.72 09 100m? GFA 0.72 0.9 100m? GFA 0.72 0.9 100m? GFA 0.72 0.9 1001? GFA 0.72 0.9 100m? GFA 0.72 0.9 100n? GFA 0.72 0.9 1 2 3 4 5 6 3 8 9 SI[[[TIO[AMIOO [MD O[OloOlo lo lolofealolof: =j4 aris The resultant trips generated by the proposed development have been shown in the Table 3.3. Table 3.3 — Trip Generation 2 9 54 FE 2 9 54 H 1 Z 1 8 6 4 7 36 72 6 2 8 9 47 95 otal 15 75 18 4 92 427 854 Note: - it has been assumed that 8% of the daily traffic would be trip generation rate for morning peak hour For Education Training Centre and light industry land uses, the typical morning peak hour arrival and departure ratio is 80% and 20%. !n the evening peak hour the ratio is 20% arrival and 80% departure. A departure and arrival ratio of 50%:50% has been adopted for day trip. The subject site was previously designated for employment use. The Burchill VDM Report 4622-2 "Response to Information Request Noosa Corporate Offices — Lot 2, Eenie Creek Road, Noosaville, Queensland (September 2007)” has adopted a traffic generation rate of 2 trips/100 m? for the previous use. On this basis 228 trips would have been generated during the evening peak hour. However, only 92 trips will be generated during evening peak hour based on the present use for the proposed development, which is 136 trips less than the previously calculation. 3.4 TRIP DISTRIBUTION & ASSIGNMENT 4686-1 January 2008 VnmM BURCHILL VDM
Page 50
In order to establish the traffic distribution for the proposed development, it was assumed that 80% of the development trips would generate along Loop Road. The Loop Road is accessed from Eenie Creek Road via a short ‘Connector Road’, as shown in Figure 2.1. The intersections of Eenie Creek Road / the Connector Road, and the Loop Road / the Connector Road are both roundabouts. 15% of the development would travel along Rene Street to the west and would get onto Eumundi Street at Eumundi Street / Rene Street Roundabout. Traffic volumes for all the intersections of ‘Shire Business Centre’ have been adopted from the Burchill VDM Report 4622-2 "Response to Information Request Noosa Corporate Offices — Lot 2, Eenie Creek Road, Noosaville, Queensland (September 2007)”. The traffic volumes adopted in that report for the proposed Business Park have been replaced by the trips calculated in Table 3.3 of this report and the relevant changes have been made on all the intersections. As the ‘Shire Business Centre’ and proposed Business Park generate more trips during the evening peak period, the weekday evening peak has been the focus for the subsequent assessment. The traffic demands during the evening peak at intersections are illustrated in Figure 3.1. 4686-1 January 2008 ven BURCHILL VDM
Page 51
Eenie Creek Rd c 1,053 229 __f 762 [ Et Access }—™ r 694 [ Connector Road 458 | 150 64 113 > t 62 319 26 29 290 a v4 68 a Loop Road Fi ure 3.1 — Estimated Evening Peak Traffic Demands on Loop Road 4686-1 January 2008 ven BURCHILL VDM
Page 52
4.0 TRAFFIC IMPACT 4.1. INTERSECTION OPERATIONS The capacity assessment of intersections was carried out using the SIDRA INTERSECTION 3.1 traffic modelling software. This is an advanced micro- analytical traffic evaluation tool that evaluates the capacity of the intersections. It provides thorough operational analysis of the intersections. (i) Connector Road / Loop Road Roundabout For the purpose of capacity analysis the roundabout was designed with 2 circulating lanes having width of 10m total and a central island with diameter of 15m. The layout of the roundabout has been illustrated in the Figure 4.1. Connector Road (N) Loop Road (E) Figure 4.1 — Proposed Loop Road / Connector Road Roundabout When considering roundabouts, a Degree of Saturation (DOS), (which is the ratio of flow to capacity) greater than 85% is considered over capacity. Above this value, performance deteriorates quickly and operation becomes poor. The analysis shows that the roundabout works very well as the key performance indicators are according to DMR standards. The maximum queue forming on the Southern Loop Road Approach is 25m and would not affect the operation of Loop Road / E5 & B3 Access Roundabout because two roundabouts are about 64m apart from centre to centre. The maximum queue forming on the Connector Road Approach is 19m and would not affect the operation of Roundabout on Eenie Creek Road because this roundabout is a distance of 65m from Eenie Creek Road. 4686-1 January 2008 Vem BURCHILL VDM
Page 53
10
The key performance indicators have been shown in the Table 4.1.
Table 4,1 — Result Summaries for the Loop Road / Connector Road Roundabout
Delay Queue
Cs) (dead)
1 Peak i Approach / Movement DOS
Loop Road (E)
P.M Fconnector Road (N)
Loop Road (SVVv)
The roundabout was also analysed with a single lane at the southern Loop Road
approach but the roundabout failed in its operational capacity because the traffic
demand at this approach is high and requires two lanes. Hence two circulating
lanes are recommended with two approach lanes and two receiving lanes.
(ii) Loop Road /E5 & B3 Access Roundabout
For the purpose of capacity analysis the roundabout was designed with 1
circulating lane having width of 7m and central island with diameter of 10m. The
layout of the roundabout has been illustrated in the Figure 4.2.
Loop Road (N)
——
B3 Access (E)
(MW) sse00y €8 8 3
|
“-——
\
|
/
Loop Road (S)
Figure 4.2 — Proposed Loop Road / E5 & B3 Access Roundabout
The analysis shows that the roundabout works very well as the key performance
indicators are according to DMR standards. The maximum queue at the Southern
2686-1 vem BURCHILL VDM
January 2008
Page 54
11
Loop Road Approach intersection is 62m. This queue would not affect the
operation of Loop Road / E4 Access intersection as it is at the distance of 135m.
The maximum queue at Northern Loop Road Approach is 17m and would not
affect the operation of Loop Road / Connector Road roundabout because the two
roundabouts are about 64m apart. The key performance indicators have been
shown in the Table 4.2.
Table 4.2 — Key Performance Indicators: Loop Road / E5 & B3 Access
Roundabout
{
Del
i Peak Approach / Movement DOS aia ahahaha
(e-9) (Can)
Loop Road (S)
B3 Access (E)
Loop Road (N)
ES5/B3 Access (VV)
4686-1
January 2008
vem BURCHILL VDM
Page 55
12 5.0 RESPONSE TO INFORMATION REQUEST 19.1 Compliance with Part 14 Division 18 of the Planning Scheme. Land use details for Lot 3 as follows: ° Industrial 9148 m?* useable area This use comprises and is defined as Industria! Business Type 1 — Warehouse and Industrial Business Type 2 — Production, Alteration, Repackaging & Repairing e Education 270 m?* This use is for the Noosa Community Training Centre and is defined as Education Type 3 - Adult. The 270m? of area will comprise 180m? classroom area, 30m? kitchen training area and 60m’ of administration area. It is note that the Education training centre would be accommodated in the building currently shown as conference facility. A small gym area and conference facility will remain however this is not considered a separate or additional use and does not need to be assessed in traffic or carparking generation. The conference/gym uses will not be open to the public and is an ancillary facility for use of the industrial tenancies on the site. The scheme complies with part 14 Division 18 of the scheme. 19.2 Intersection Analysis. Please refer to Section 4 of this report for the intersection operation analyses, which demonstrates the intersections perform satisfactorily with the proposed development. 19.3 Carpark Compliance Please refer to town planning report. 19.4 Carpark Numbers Please refer to town planning report. 19.5 Blind Aisles The layout of the proposed car park is consistent with the requirements as set out in" Australian Standard for Parking Facilities, Part 1: Off Street Car parking (AS2890.1)”. The carpark complies by limiting the number of circulation lanes and aisles and the blind aisles are compliant as a turning area has been provided thereby allowing cars to exit in a forward direction. Sanuaty 2008 vem BURCHILL VDM
Page 56
13 19.6 Safe Access for Pedestrians and End of Trip Facilities Pedestrian facilities can be provided safely in a north south direction with crossings over the car park entrance areas. Pedestrian crossing across car parking aisles is not uncommon and the volume of traffic in each side row is expected to be very low. End of trip facilities including showers for cyclists should be supplied according to the Australian Standards. Sanvaty 2008 vem BURCHILL VDM
Page 57
14 APPENDIX A SITE LAYOUT 4686-1 January 2008
Page 58
weg TODS TROLO wer
oorr ma ete Lon 2
NW1d BLIS TIVUZAO
une
STIIAYSOON
voy NaaND FIN|D E LOT
SANANdOTaAIG 19S
»
uVd SSANISNG AISOdOUd
atest
re
re wor ee voxh Que wna
wed Lire Fe NOY
once eure 2a Ky4 8208 Co¥8 19
ASS% PD IE AWOOMOOTUYH ZED KOR Od
BSG" HD ALOGANIOOUV 149 THABON 21/5
wind SSINISTR THOGAHOOOWH
= [851248
e
g
a nnn wouengen Are
ora wate seve
"oma 08
ZOnane JONITTING
QONIOTING 9 ONITIING
= row ONETIIOTT rea razawrs
oun croros! paaroeae ronson
BagvatOnvl
aonow env
" Taras SONIguNa HONIMING
burwdop ae ne xen
10 03
(Georvzzae DreanToM)
ent VAD ANAL LOL
armas va US
neal cae aaeee
« sure 40 voor TOL
® fonaN8 20 eR TOL
TaVWAS SOS Sg ONICTING HONITIING
YONIgTIN roniaina
Auntovd ©
JONSYSENOD
Page 59
15 APPENDIX B SIDRA SUMMARIES 4686-1 January 2008
Page 60
Movement Summary Page | of 1 SIDRA > INTERSECTION Movement Summary Proposed Business Park (Shire Business Centre Noosaville) Connector Road / Loop Road Roundabout_P.M Roundabout Vehicle Movements 95% Deg of Aver Aver Dem Flow Level of Back of Prop. Eff. Stop Mov ID Turn %HV Satn Delay . Speed (veh/h) (v/c) (sec) Service ae Queued Rate (km/h) Loop Road (E) 4 L 11 0.0 0.196 8.4 LOS A 8 0.53 0.68 48.3 6 R 158 0.0 0.197 13.8 LOS B 8 0.53 0.78 44.2 Approach 169 0.0 0.197 13.5 LOS B 8 0.53 0.77 44.5 Connector Road (N) 7 L 67 3.0 0.349 5.4 LOS A 19 0.07 0.45 51.8 9 R 497 3.0 0.348 10.2 LOS B 19 0.07 0.65 47.1 Approach 564 3.0 0.348 9.6 LOSA 19 0.07 0.63 47.6 Loop Road (SW) 30 L 1134 3.0 0.425 5.1 LOS A 25 0.39 0.46 50.5 32 R 11 0.0 0.423 10.8 LOS B 24 0.40 0.65 45.8 Approach 1145 3.0 0.425 5.1 LOSA 25 0.39 0.46 50.5 All Vehicles 1878 2.7 0.425 7.2 LOS A 25 0.31 0.54 49.0 Symbols which may appear in this table: Following Degree of Saturation # x = 1.00 for Short Lane with resulting Excess Flow * x = 1.00 due to minimum capacity Following LOS # - Based on density for continuous movements Following Queue # - Density for continuous movement + SIDRA SOLUTIONS Site: Connector Road / Loop Road F:\Burchill VDM's Work Folder\- Active Jobs\QC070576 - Lot 3\Traffic\SIDRA\Roundabouts on Loop Road.aap Processed Dec 13, 2007 02:47:34PM A0463, Burchill VDM Pty Ltd, Large Office Produced by SIDRA Intersection 3.2.0.1455 Copyright 2000-2007 Akcelik and Associates Pty Ltd id luti about:blank 10/01/2008
Page 61
Movement Summary Page | of 2
SIDRA -_=
INTERSECTION
Movement Summary
Proposed Business Park (Shire Business Centre Noosaville)
Loop Road / E5 B3 Access Roundabout_PM
Roundabout
Vehicle Movements
Dem Flow Deg of Aver Level of Back of Prop. Eff. Stop Aver
Mov ID Turn WHY Satn Delay ‘ : Speed
{veh/h) (v/c) (sec) Service ene Queued Rate (km/h)
Loop Road (S)
1 L 5 16.7 0.667 9.8 LOS A 62 0.67 0.69 46.6
2 T 821 3.0 0.698 77 LOS A 62 0.67 0.62 47.7
3 R 5 16.7 0.667 13.5 LOS B 62 0.67 0.70 43.9
Approach 833 3.2 0.698 7.7 LOS A 62 0.67 0.62 47.7
B3 Access (E)
4 L 5 16.7 0.082 75 LOS A 3 0.48 0.61 49.0
5 T 5 16.7 0.082 7.5 LOS A 3 0.48 0.61 49.0
6 R 65 3.1 0.083 13.3 LOS B 3 0.48 0.70 44.6
Approach 77 5.2 0.083 12.4 Los B 3 0.48 0.68 45.2
Loop Road (N)
7 L 27 3.6 0.315 5.4 LOS A 17 0.10 0.45 51.7
8 T 348 29 0.315 4.5 LOS A 17 0.10 0.38 52.8
9 R 119 3.4 0.315 11.3 LOS B 17 0.10 0.66 46.2
Approach 495 3.0 0.315 6.2 LOSA 17 0.10 0.45 50.9
E5 B3 Access (W)
10 L 241 2.9 0.445 13.0 LOS B 30 0.89 0.99 44.3
11 T 5 16.7 0.462 12.0 LOS B 30 0.89 0.98 45.3
12 R s 16.7 0.462 18.9 LOS B 30 0.89 0.93 40.6
Approach 253 3.6 0.446 13.1 Los B 30 0.89 0.98 44.2
All Vehicles 1658 3.3 0.698 8.3 LOSA 62 0.53 0.63 47.9
Symbols which may appear in this table:
Following Degree of Saturation
# x = 1.00 for Short Lane with resulting Excess Flow
* x = 1.00 due to minimum capacity
Following LOS
# - Based on density for continuous movements
Following Queue
# - Density for continuous movement
+
SIDRA SOLUTIONS
Site: Loop Road / ES & B3 Access
F:\Burchill VOM's Work Folder\- Active Jobs\QC070576 - Lot 3\Traffic\SIDRA\Roundabouts on Loop Road.aap
Processed Dec 13, 2007 02:47:26PM
A0463, Burchill VDM Pty Ltd, Large Office
Produced by SIDRA Intersection 3.2.0.1455
about:blank 10/01/2008
Page 62
Movement Summary Page 1 of 1 SIDRA -—~= INTERSECTION Movement Summary Noosa Lifestyle Showrooms Loop Road / E4 Access Priority-Controlled Intersection Give-way Vehicle Movements 95% Deg of Aver Aver Dem Flow Levei of Back of Prop. Eff. Stop Mov ID Turn %HV Satn Delay Speed i (veh/h) (w/c) (sec) Service ones Queued Rate (km/h) Loop Road (S) 1 L 5 16.7 0.429 8.3 LOS A 0 0.00 0.67 49.0 2 T 820 3.0 0.432 0.0 LOS A 0 0.00 0.00 60.0 Approach 826 3.1 0.432 0.1 LOS A 0.00 0.00 59.9 Loop Road (N) 8 T 359 3.1 0.253 9.1 LOS A 34 0.90 0.00 48.0 9 R 31 3.2 0.252 17.7 LOS C 34 0.90 1.01 40.4 Approach 390 3.1 0.253 9.8 LOS A 34 0.90 0.08 47.3 E4 Access (W) 10 L 72 2.8 0.316 24.4 LOS C 10 0.82 0.99 35.9 12 R 5 16.7 0.316 24.7 Los Cc 10 0.82 0.99 35.7 Approach 77 3.9 0.315 24.4 Los c 10 0.82 0.99 35.9 Not All Vehicles 1293 3.2 0.432 4.4 Applicable 34 0.32 0.09 53.5 Symbols which may appear in this table: Following Degree of Saturation # x = 1.00 for Short Lane with resulting Excess Flow * x = 1.00 due to minimum capacity Following LOS # - Based on density for continuous movements Following Queue # - Density for continuous movement + SIDRA SOLUTIONS Site: Loop Rd / E4 Access F:\Burchill VDM's Work Folder\- Active Jobs\QC070576 - Lot 3\Traffic\SIORA\Roundabouts on Loop Road.aap Processed Sep 19, 2007 07:37:29PM A0463, Burchill VDM Pty Ltd, Large Office Produced by SIDRA Intersection 3.2.0.1455 Copyright 2000-2007 Akcelik and Associates Pty Ltd www. sidrasolutions.com about:blank 10/01/2008
Page 63
Movement Summary Page 1 of 1 SIDRA -= INTERSECTION Movement Summary Noosa Lifestyle Showrooms E3 Access/ E4 Access Priority-Controlled Intersection Give-way Vehicle Movements og Deg of Aver 95% Aver Dem Flow Level of Back of Prop. Eff. Stop Mov ID Turn %HV Satn Delay . Speed (veh/h) (v/c) (sec) Service enn Queued Rate (km/h) E3 E4 Access (E) 5 T 73 2.8 0.096 0.7 LOS A 4 0.30 0.00 56.1 6 R 72 2.8 0.096 9.3 LOS A 4 0.30 0.66 47.5 Approach 143 2.8 0.096 5.0 LOSA 4 0.30 0.33 51.5 E4 Access (N) 7 L 167 3.0 0.179 9.4 LOS A 7 0.32 0.66 47.6 9 R 5 16.7 0.176 9.7 LOS A 7 0.32 0.77 47.4 Approach 173 3.5 0.179 9.4 LOS A 7 0.32 0.66 47.6 E3 Access (W) 10 L 5 16.7 0.091 8.3 LOS A 0 0.00 0.67 49.0 11 T 167 3.0 0.091 0.0 LOS A oO 0.00 0.00 60.0 Approach 173 3.5 0.091 0.3 LOS A 0.00 0.02 59.5 7 Not All Vehicles 489 3.3 0.179 4.9 Applicable 7 0.20 0.34 52.5 Symbols which may appear in this table: Following Degree of Saturation # x = 1.00 for Short Lane with resulting Excess Flow * x = 1.00 due to minimum capacity Following LOS # - Based on density for continuous movements Following Queue # ~ Density for continuous movement + SIDRA SOLUTIONS Site: E3 Access / E4 Access F:\Burchill VDM's Work Folder\- Active Jobs\QC070576 - Lot 3\Traffic\SIDRA\Roundabouts on Loop Road.aap Processed Sep 20, 2007 09:31:28AM A0463, Burchill VDM Pty Ltd, Large Office Produced by SIDRA Intersection 3.2.0.1455 Copyright 2000-2007 Akcelik and Associates Pty Ltd id uti about:blank 10/01/2008
Page 64
STORMWATER MANAGEMENT PLAN PART A QUANTITY PROPOSED INDUSTRIAL AND EDUCATION DEVELOPMENT LOT 3 EENIE CREEK ROAD, NOOSAVILLE for KEN HICKS & ASSOCIATES M3048 December 2007 BARLOWGREGG VPM. MPRA. "rember
Page 65
STORMWATER MANAGEMENT PLAN TABLE OF CONTENTS 1.0 INtrOdUCtiON ............csscssssssecsscsssorsnsssnsssserssccssssasessessesssesseassessesseansseseeseeassees 3 2.0 Existing Conditions ..........cccccceeee 3 3.0 Proposed Development................. 3 4.0 Site Stormwater Modelling.. we 4 4.1 Methodology. ..........ccccccecsseenseneeeee 4 4.2 Selection of Modelling Parameters.... 4 4.2.1 Impervious Areas.............:ceceeeee wd 4.2.2 Manning’s ‘Nn’... 5 4.2.3 Energy Loss Coefficients 0... cece csecsecseeeeeseseeseessaeseresseseeeeaees 5 4.2.4 Infiltration Characteristics 0... ce ecseeneetecseseeeeseesesesseceeseetetseraenees 5 5.0 Pre-Development Flows.......... 1 6 5.1 Rationale... 6 5.2 Result... ce 6 6.0 Post-Development Flows.. a7 6.1 Rationale... wT B.2 RESUIRS..0.0....cccccccccceseseesceetecennenscescessececeeeeeeeaeeeseneneeeaeeneseesaeseeecaeeeseeaeeeteeens 7 7.0 CONCIUSION .......csesccsssstsccsssesesesssnssessnccsecsnssscssecsseseesessssesscrsesserennsnesessesessonsees 8 APPENDIX A,......cceeceseeeeee Proposed Development Layout APPENDIX B........ceecceseeeee XP-STORM Pre-Development Results APPENDIX C.,.....ceeceeeeeernes XP-STORM Post-Development Drainage Model Layout and Results APPENDIX D........cesreeeeeeer Preliminary Drainage Details BARLOW GREGG VOM M3048 DECEMBER 2007
Page 66
STORMWATER MANAGEMENT PLAN 3 1.0 Introduction The purpose of this stormwater management plan is to determine general requirements for bulk stormwater management for the proposed industrial and education development at Lot 3 Eenie Creek Road, Noosaville. The specific objectives of this stormwater strategy are as follows: « Determine pre and post-development flows; « Identify how the non-worsening of stormwater flows will be achieved; 2.0 Existing Conditions The site of the proposed development is approximately 2.08 Ha in area and currently vacant. The site slopes at an approximate gradient of 1% generally towards the east of the site, into OS4, and eventually into Eenie Creek. OS4 is designated as Open Space (Environmental Drainage) under the Noosa Plan and as such no development works may be carried out in this area. The site has no upstream catchment. 3.0 Proposed Development The proposed development involves the construction of several industrial tenancies and an education facility, with both being serviced by a central access road. Access to the site will be provided from the proposed link road that skirts the north of the site. The proposed lawful point of discharge for the site is the north eastern corner of the lot where runoff will be discharged into OS4. The proposed development layout is attached in appendix A. BARLOW GREGG VDM M3048 DECEMBER 2007
Page 67
STORMWATER MANAGEMENT PLAN 4 4.0 Site Stormwater Modelling 4.1 Methodology The hydrology and hydraulics of the pre and post development scenarios were analysed using the XP-STORM stormwater management model with storm patterns derived from Australian Rainfall and Runoff publication and rainfall intensities derived for the Noosa area. Due to the topography of the land and the layout of the site, it was determined that runoff from the site will fall to the east, away from the road. Therefore the runoff will be directed to pits located within the carpark and conveyed via an underground pipe network to the north-eastern comer of the lot for discharge into OS4. The XP-STORM model was set up with a conservative stormwater system design comprising of overland flow paths through carparks and bio-retention areas collecting runoff before discharging into a swale along the eastern boundary of the site. Details of the proposed bio-retention areas can be found in Part B of this stormwater management plan. Roof water is to be collected in retention tanks to help attenuate stormwater flows. To accurately determine pre and post development flows, the Q10 and Q100 storms were modelled. Storm durations of 10, 20, 25, 30 ,45, 60, 75, 90, 120 and 180 minutes were investigated. 4.2 Selection of Modelling Parameters XP-STORM modelling parameters were assessed from layout drawings, contours, QUDM (Queensland Urban Drainage Manual) and considering the extent of proposed development within the catchment. 4.2.1 Impervious Areas In accordance with the current pre-developed situation, 0% of impervious ground area was used in the pre-developed model. In the post developed model the percent of impervious ground area was increased to 82% to represent the proposed development. This area was measured from the site layout drawings. BARLOW GREGG VDM M3048 DECEMBER 2007
Page 68
STORMWATER MANAGEMENT PLAN 5 4.2.2 Manning’s ‘n’ Values for the dimensionless Manning’s ‘n’ coefficient for open channel and piped flows were ig pip assigned according to Table 4.1 in accordance with QUDM. Table 4.1: Study Manning’s ‘n’ Conduit condition Manning’s ‘n’ Grassed, Landscaped Swales 0.045 Reinforced Concrete 0.014 4.2.3 Energy Loss Coefficients Entrance and exit loss coefficients were utilised according to Table 4.2 in general accordance with QUDM. Table 4.2: Pipe Energy Loss Coefficients Energy Loss Loss Coefficient Entry Loss 0.5 Exit Loss 0.2 4.2.4 Infiltration Characteristics The Horton infiltration method was adopted for the drainage study. The values used for maximum infiltration rate, minimum infiltration rate and decay rate of infiltration were 10mm/hr, Imm/hr, and 0.0001/sec respectively for pervious areas and 1mm/hr, 1mm/hr, and 0.000 l/sec respectively for impervious areas BARLOW GREGG VOM M3048 DECEMBER 2007
Page 69
STORMWATER MANAGEMENT PLAN 6 5.0 Pre-Development Flows 5.1 Rationale The proposed site is currently undeveloped, and therefore an impervious area of 0% was used. As the majority of the site contains no identifiable watercourses of concentrated overland flow, it is assumed that the pre development overland flow occurs as sheet flow. The pre- development model was set up so as that the stormwater runoff will drain to the north-eastern environmental drainage area of the site. The peak flows for the pre development conditions were derived using a conservative method by utilising only the XP-STORM model hydrologic runoff layer. 5.2 Results The peak flows for the pre development conditions are indicated in Table 5.1. Table 5.1: Pre development Peak Flows ARI Design Storm (min) Peak Flow (m°/s) 10 25 0.811 100 25 0.120 XP-STORM pre development model output is included in Appendix B. BARLOW GREGG VOM M3048 DECEMBER 2007
Page 70
STORMWATER MANAGEMENT PLAN 7 6.0 Post-Development Flows 6.1 Rationale The peak flows for the design storms for the post development conditions were derived using the XP-STORM model set up in accordance with the proposed development layout. In accordance with the pre development scenario the post developed site was modelled with the discharge point being the north-eastern environmental drainage area. However no structures will actually be located within this environmental area. The XP-STORM model was set up with a preliminary stormwater system design comprising of open bio-retention areas collecting runoff from carparks and hardstand areas before discharging into a swale along the eastern boundary. As a result of the increase in impervious ground areas and defined flow paths, detention of stormwater will be required to ensure that the development does not increase existing flow rates at the point of discharge. This storage volume will be achieved by roofwater harvesting tanks or equivalent with a combined volume of 192kL. These tanks will be located under car parking areas and will be detailed further in a future operational works application. An XP-STORM node layout plan for the post-development scenario is included in Appendix Cc. 6.2 Results Table 6.1 indicates the greatest peak flows for the post development model. Table 6.1: Post development peak flows ARI Design Storm (min) Peak Flow (m’/s) 10 25 0.714 100 25 1.002 As shown in the above table the post-developed flows compare very well to that of pre- developed. This is due to the stormwater mitigation included in the development in the form of harvesting tanks. XP-STORM pre development model output is included in Appendix C. BARLOW GREGG VOM M3048 DECEMBER 2007
Page 71
STORMWATER MANAGEMENT PLAN 8 7.0 Conclusion In conclusion it should be stated that the findings of this stormwater management plan are that it is possible to incorporate adequate stormwater detention as part of the proposed development, to result in non-worsening of stormwater flows. BARLOW GREGG VDM M3048 DECEMBER 2007
Page 72
APPENDIX A PROPOSED DEVELOPMENT LAYOUT
Page 73
— ‘am nag | a ne
Page 74
APPENDIX B XP-STORM PRE-DEVELOPMENT RESULTS
Page 75
000¢ uer
wes}
00-2
7-00
pujyiy
LO
{ijt
ANZ
OME
WT
MN
AE
[2vS'0 xe] UI Og, eSCON = [ZZ9'0 xe] UI OZ} BSOON
pid
{tit
NOl|4
ti
fii
Litt
pitt
1
—- —
[6S9'0 xe] ul OG BSCON [Log’o xey] ul og BSsooN [SL2'0 xeW] ul Gp BSOON [0220 Xe] ul OE BSOON
PY [os — —
[L+9°0 xe] ul Gz esooN [g$z'0 xepy] ul OZ BSOON [979'0 xep] ul Gg, esooN [ves o xeyy] uw QO) BSOON
Oh Gk Fah = Se est |
MOLT OLD - Juaudojaaaqg-s1g
Page 76
0002 uer -00 LO 20 €'0 v0 s‘0 90m o 80 60 Ol bb cl PLLA ETP P EP TT EET ty [ZZ6'0 xe] Wig BSOON Bel [Loz'p xe] uiwigz esoon ra a a [0SZ'0 xew] ulupgL SOON —— [PLL Xe] ulLugg BSOON [OOL"| xe] ulwgp esooN —— — (ZZ) xeW] ulgz eSooN [8LO") xeyy] ulus, BSOON MOLI OOLO- Juaudojaaaq-21g [g99"0 xe] uligZ| BSOON PC [gst', xe] ulwog eSooN — [L06'0 xeyy] ul | BSOON
Page 77
APPENDIX C XP-STORM POST-DEVELOPMENT DRAINAGE MODEL LAYOUT AND RESULTS
Page 78
LTT Node30 MTT TT] Mt Caain a. mogana FO
Page 79
SUL 00:2 oe:1 00:1 0¢:0 0002 uer eS | Jj ji j_ ij tt ) jj } tid Z PIL = XeW MOLT OLD - Juowdojaaaq-3s0d z ¢ Ss 9° 0 0 0 0 0 MOl|4
Page 80
Ow 000d uer 00:2 O€:L 00-1 0€:0 1S | Mo} C00 = Xe 8ESPON 9} 9ZSPON WOOL QcxUry] yNpuo+y
Page 81
APPENDIX D PRELIMINARY DRAINAGE DETAILS
Page 82
77 PROPOSED LOCATION OF
32kL DETENTION TANKS
INDICATES PROPOSED.
BIGRETENTION AREAS
RENE STREET
mail
We ULES
tn
PROPOSED LOCATION GF}
3UkL_ RAINWATER t
HARVESTING TANKS
PROPOSED LOCATION OF
3kL DETENTION TANKS,
FS PROPOSED LOCATION OF
32kL RAINWATER
HARVESTING TANKS,
|
sou 8 OM Me
—
NOTATION
MOKATES STORMWATER
—_ FUBW DRECTON
INDICATES. PROPOSEO
TP BIRE TENTION AREAS.
LOT 3 STORMWATER
FLOW DIRECTION
eeeemrerer
2 asec cosst mgt st
eee, heen
BARLOW GREGG ViP>mw_
re cor const
fowtas ee vomen cust
Seen sane
PROJECT oon becenOER THN [wat AS SEH
LOT 3 STORMWATER RETAIL BUSINESS SHOWROOM &[ sexe | ene
FLOW DIRECTION COMMERCIAL BUSINESS OFFICE [== et
Int 26 EENIE CREEK ROAD cc wre
aan OOSAVILLE PROVECT. SUBSET -SHEET REVISION
& ASSOCIATES
ec _ Fax 107) 5443 THE M3048 - SKOS