Council archive · source document
07/1841 - Response to Information Request [As Published] · 132007.1841
7. Provide further details of how the conference and gym facility is proposed to be utilised by the tenants of fhe site, including tifling and confractual arrangements and costing structures for its use. The conference and gym facility will not be open to the public and is provided as an ancillary facility for the industrial tenants. This facility will be managed by the NCTC. The gym will be open at all times for use by other tenants, whereas the conference/meeting facility will need to be pre-booked. Titling and contractual arrangements will depend upon whether the site is developed and retained in a single ownership or subdivided under a community titles scheme. Costs for use of the facility will be incorporated in either lease agreements or body corporate fees. 8. Provide a detailed assessment of the adequacy of the carparking facilities provided in association with the conference and gym facility and provide amended plans indicating increased parking provision as appropriate. Given that the conference and gym facility is not open to the public and is provided an as ancillary use for site tenants, no additional parking demand or provision is generated. Carparking has been provided as follows, in accordance with the requirements of the Driveways and Carparking Code: Use Carparking Rate Requirement Provided Industrial 1 space per 50m? of use | 182 19] area. Use area = 9101m?2 Education | space per employee & 5+3=8 10 ) space per 10 students of driving age. NCTC has 5 staff and 30 students/trainees Total | 190 201 As demonstrated carparking provision has been provided in excess of the requirements of the Driveways and Carparking Code. 9. Provide confirmation of the proposal'’s consistency with the various Management Plans submitted in association with the Reconfiguring of a Lot and Operational Works applications (2006/1594 & 2007/1242). Where there are conflicts, fhe proposal plans - and/or management plans shall be amended accordingly and resubmitted, clearly indicating any changes made. The proposal does not conflict with the amended Management Plans approved with the Lot Reconfiguration and Operational Works applications. 10. Provide a Bushfire Management Plan for the site that addresses the proposal. The plan previously submitted has not considered the proposed development. An amendment Bushfire Management Plan was prepared and submitted subsequent to the Operational Works approval for the lot Reconfiguration works. This Bushfire Management Plan considered the proposed development. A copy of the Plan is attached.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1841 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 6.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.