Council archive · source document
07/1841 - Response to Information Request [As Published] · 132007.1841
STORMWATER QUALITY MANAGEMENT PLAN 6 4.0 Conclusion Part B of this stormwater management plan has outlined the stormwater quality objectives for this development and how these will be achieved. Predictions from the MUSIC software have been used to measure the performance of the proposed stormwater treatment train. Modelling shows that Noosa Shire Council requirements can be met for total suspended solids, total phosphorus, and total nitrogen concentrations. BARLOW GREGG VDM M3048 DECEMBER 2007
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1841 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 6.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.