Skip to the record
For the highest quality transcripts.

Council archive · source document

07/1841 - Response to Information Request [As Published] · 132007.1841

of 82

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

3.0

PROPOSED DEVELOPMENT

3.1 COMPOSITION

The proposed development mainly comprises of light industry land use. An
education training centre with an assumed capacity of 35 students, together with
an ancillary (conference facility and gymnasium) have also been proposed as part
of the development. The uses and the scales of the proposed development are
detailed have been shown in the Table 3.1.

Table 3.1 — Composition of Proposed Business Park

 

 

 

 

 

 

 

 

 

 

 

 

S.No Land Use STi Quantum
1 Gymnasium 100m? GFA 0.72
2 Conference / Meeting Room 100m? GFA 0.62
3 Education Training Centre : 100m? GEA 2.79
4 Buitding A (Light Industry) 100m? GFA 9.50
5 Building B (Light Industry) 100m? GFA 8.00
6 Building C (Light Industry) 100m? GFA 9.50
7 Building D (Light Industry) 100m? GFA 8.00
8 Building E (Light industry) 100m? GFA 41.97
9g Building F (Light Industry) 100m? GEA 11.97
10 Building G (Light Industry) 100m? GFA 8.00
11 Building H (Light Industry) 100m? GFA 9.50
12 Building 1 (Light Industry) 100m? GFA 8.00
13 Building J (Light Industry) 100m? GEA 10.50

 

 

 

 

 

 

A layout of the proposed development is provided in Appendix A.

3.2 VEHICULAR ACCESS

The proposed development would gain access on Rene Street and link to the
Loop Road at the north of the subject site.

3.3. TRAFFIC GENERATION

In order to establish the traffic volume that would result from the proposed
development, a range of sources were consulted.

Trip generation rates for the proposed development were referenced from the
DMR Road Planning & Design Manual (RP&DM), Chapter 3, and the RTA Guide
to Traffic Generating Developments (GTGD) Chapter 3. The adopted rates are
summarised in Table 3.2.

It is noted that conference / meeting facility would only be used occasionally and
would not generate trips during the peak hours as other land uses of the proposed
development. It is also noted that the gymnasium will only be opened to site users

 

4686-1

January 2008 vem BURCHILL VDM

Used in these records

About this file

File size
6.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1841 - Response to Information Request [As Published].pdf · 6.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.