The key performance indicators have been shown in the Table 4.1.
Table 4,1 — Result Summaries for the Loop Road / Connector Road Roundabout
Delay Queue
Cs) (dead)
1 Peak i Approach / Movement DOS
Loop Road (E)
P.M Fconnector Road (N)
Loop Road (SVVv)
The roundabout was also analysed with a single lane at the southern Loop Road
approach but the roundabout failed in its operational capacity because the traffic
demand at this approach is high and requires two lanes. Hence two circulating
lanes are recommended with two approach lanes and two receiving lanes.
(ii) Loop Road /E5 & B3 Access Roundabout
For the purpose of capacity analysis the roundabout was designed with 1
circulating lane having width of 7m and central island with diameter of 10m. The
layout of the roundabout has been illustrated in the Figure 4.2.
Loop Road (N)
——
B3 Access (E)
(MW) sse00y €8 8 3
|
“-——
\
|
/
Loop Road (S)
Figure 4.2 — Proposed Loop Road / E5 & B3 Access Roundabout
The analysis shows that the roundabout works very well as the key performance
indicators are according to DMR standards. The maximum queue at the Southern
2686-1 vem BURCHILL VDM
January 2008
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1841 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 6.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.