Council archive · source document
07/1841 - Response to Information Request [As Published] · 132007.1841
STORMWATER MANAGEMENT PLAN 3 1.0 Introduction The purpose of this stormwater management plan is to determine general requirements for bulk stormwater management for the proposed industrial and education development at Lot 3 Eenie Creek Road, Noosaville. The specific objectives of this stormwater strategy are as follows: « Determine pre and post-development flows; « Identify how the non-worsening of stormwater flows will be achieved; 2.0 Existing Conditions The site of the proposed development is approximately 2.08 Ha in area and currently vacant. The site slopes at an approximate gradient of 1% generally towards the east of the site, into OS4, and eventually into Eenie Creek. OS4 is designated as Open Space (Environmental Drainage) under the Noosa Plan and as such no development works may be carried out in this area. The site has no upstream catchment. 3.0 Proposed Development The proposed development involves the construction of several industrial tenancies and an education facility, with both being serviced by a central access road. Access to the site will be provided from the proposed link road that skirts the north of the site. The proposed lawful point of discharge for the site is the north eastern corner of the lot where runoff will be discharged into OS4. The proposed development layout is attached in appendix A. BARLOW GREGG VDM M3048 DECEMBER 2007
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1841 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 6.6 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.