Skip to the record
Search everything, all in one place.

Council archive · source document

Decision Notice - 010.2007.00001987.001 [As Published] · 152007.1987

of 5

Text shows just the words. Original shows the document exactly as it was published.

NOOSA COUNCIL IDAS Development Application Decision Notice                                                    3 of 5




                                     Noosa Council Conditions
                                     INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION


1.     For the purpose of these conditions, the following definitions apply: -

       A Plan of Survey means the plan for the reconfiguration of a lot required to be endorsed by Council
       pursuant to S3.7.1 of the Integrated Planning Act 1997.

       The person acting on this permit means anyone who undertakes development pursuant to this permit.

2.     The lot reconfiguration shall be in accordance with Plan 1 of 1 Ref:99/741B dated 25/09/07 as submitted
       by Max Watterson & Associates except as may be modified by the conditions of this approval.

3.     Pursuant to Section 3.5.21(2)(a) of the Integrated Planning Act 1997, the currency period is two (2) years
       from the day this permit takes effect by which time all conditions must have been complied with and the
       Plan of Survey lodged with the Council for endorsement of its approval.

4.     Correct documentation (including legal) and the prescribed fee must be lodged for Council endorsement
       with the Plan of Survey.

Service Easements Sewer

5.     A registered easement shall be created over the zone of influence of all sewers within the subject site and
       over those parts of the subject site that are impacted upon by sewers on any adjoining sites. The
       easements shall generally be parallel to and centred over the sewer main and be equivalent in width to
       twice the depth to invert level of the sewer at the deepest point within the allotment (measured from the
       finished surface) and be no less than 3.0m wide overall. In this regard a licensed surveyor shall
       accurately locate all sewer mains and determine the necessary width of the easement. To this extent the
       surveyor shall certify that the sewer and the zone of influence is wholly contained within the easement to
       be created.
       In addition to this the Applicant’s Solicitor shall give Council’s Solicitor an appropriate undertaking in
       writing that the Title Deed and the easement documents will be lodged at the Land Titles Office and any
       additional Titles Office forms or requisitions requiring the consent of Council will be attended to promptly.
       No building or other structure shall be constructed or encroach over an easement.
6.     Pursuant to Section 3.7.3(3)(b) of the Integrated Planning Act, all outstanding rates and charges owing to
       Noosa Council in respect of the lots being reconfigured shall be paid prior to endorsement of the Plan of
       Survey.

7.     Any building structures on the site that do not comply with Council’s minimum setback clearances shall be
       removed, modified or relocated such that they do comply prior to the endorsement of the Plan of Survey.




NSC c:\docume~1\rhr\locals~1\temp\bcl technologies\easypdf 5\@bcl@5809e46b\@[email protected]

Used in these records

About this file

File size
24 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2007.00001987.001 [As Published].pdf · 24 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.