Response to Information Request 10-6-2025 Traffic impact assessment · OPW25/0042
1.2.1 Traffic Distribution
The distribution of Bulk Earthworks traffic within the surrounding network is based on the proposed route
outlined in the Avada Traffic – Traffic Management Plan and illustrated in Figure 1-1.
K atharina Street
TRAFFIC NETWORK DIAGRAM
Traffic Distribution
ALL VEHICLES Serenity Close
Banksia Avenue
Legend:
Weekday AM Peak*
Weekday PM Peak*
Weekend PM Peak*
50%
50%
DEVELOPMENT SITE 0% 0% 0% 50%
0% 50% 50% 50%
0%
0%
Cor al Tr ee Avenue
Gr ant Road
0% 50% 50% 50% 50%
0% 0% 0% 0% 50%
50% 50% 50% 0% 50%
Noosa Drive
50% 50% 50%
Sunshine Beac h Road
Figure 1-1: Traffic Distribution
Based on the above distribution and generation outlined above the traffic generated by the Bulk Earthworks
traffic in the respective peak hour periods is shown in Figure 1-2.
K atharina Street
TRAFFIC NETWORK DIAGRAM 3
Traffic Generation OPW
ALL VEHICLES Serenity Close
Banksia Avenue
Legend:
Weekday AM Peak*
Weekday PM Peak*
Weekend PM Peak*
5
5
DEVELOPMENT SITE 5
0 5 5 5
0
0
Cor al Tr ee Avenue
Gr ant Road
0 5.0 5.0 5.0 5.0
0 0 0 0 5.0
5.0 5.0 5.0 0.0 5.0
Noosa Drive
5.0 5.0 5.0
Sunshine Beac h Road
Figure 1-2: Traffic Generation (vph)
Site: 3-7 Serenity Close, Noosa – Proposed Resort Complex
Reference: 22BRT0122
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Information Request 10-6-2025 Traffic impact assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.