Council archive · source document
Response to Information Request 10-6-2025 Traffic impact assessment · OPW25/0042
Table 3-1: Summary of Sidra Outputs (Noosa Drive and Coral Tree Avenue Roundabout)
Scenario DOS Average Delay LOS 95th Percentile Critical
Queue (m)
Overal Worst Movement Overall Worst Noosa Coral Noosa
l Movement Drive Tree Dr (W)
(E) Ave (N)
Weekday - AM Peak Hour
2022 Survey 32% 5 sec 14 sec (UT Noosa Dr W) A B 18 m 2m 18 m
2025 Base 33% 5 sec 14 sec (UT Noosa Dr W) A B 19 m 2m 18 m
2025 Base + 34% 5 sec 14 sec (UT Noosa Dr W) A B 19 m 2m 19 m
Earthworks
Weekday - PM Peak Hour
2022 Survey 42% 5 sec 12 sec (UT Noosa Dr W) A B 29 m 1m 18 m
2025 Base 43% 5 sec 12 sec (UT Noosa Dr W) A B 31 m 1m 19 m
2025 Base + 44% 5 sec 12 sec (UT Noosa Dr W) A B 31 m 1m 19 m
Earthworks
Weekend – PM Peak
2022 Survey 40% 5 sec 12 sec (RT Coral Tree Ave N) A B 22 m 1m 23 m
2025 Base 41% 5 sec 13 sec (RT Coral Tree Ave N) A B 24 m 1m 24 m
2025 Base + 42% 5 sec 13 sec (RT Coral Tree Ave N) A B 24 m 1m 24 m
Earthworks
RT – Right Turn Movement, Th – Through Movement, LT – Left Turn Movement, UT – U Turn Movement; N – North, S – South, E –
East, W – West
The analysis indicates that the roundabout is expected to operate at suitable levels at the during the 2025
assessment year, with earthworks traffic included, with a worst-case DOS 44% (less than 85%, practical
capacity limit of roundabout) and overall LOS A. The addition of the Bulk Earthworks traffic has no notable
impact to key operational metrics, with minor change to average intersection delay and at most an increase
in queuing of 1 m (less than 1 vehicle length – approx. 6.0m).
Based on this SIDRA capacity assessment, the proposed Bulk Earthworks traffic generation is considered to
have negligible impact on the operations of the Noosa Drive / Coral Tree Avenue roundabout intersection.
Analysis of Grant Street / Noosa Drive / Sunshine Beach Road
Figure 3-2 overleaf shows the configuration of the Grant Street / Noosa Drive / Sunshine Beach Road
roundabout intersection adopted in the SIDRA analysis. All default SIDRA inputs were used for the analysis.
Site: 3-7 Serenity Close, Noosa – Proposed Resort Complex
Reference: 22BRT0122
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Response to Information Request 10-6-2025 Traffic impact assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.6 MB (small file)
- File type
No other editions are linked here.