08/0383 - Change to an Existing Approval [As Published] · 142008.383
I Sunshine Coast Locked ag 72
S unshiineCoast Mail Centre
old 4560
T 07 547 7
F 07 54755 277 72
E mail@sunshinecoast qld govau
Regional Council
ABN 37 876 973 913 W wwwsunshinecoast qld govau
Officer Denis Wallace
Direct Telephone (07) 5449 5179
Response Address Locked Bag 72
Sunshine Coast Mail Centre QLD 4560
Email denis wallace@sunshinecoast qld gov au
Our Reference 2008/383
Your Reference
8 January 2010
Sunshine Coast Regional Council
Denis Shaw
Locked Bag 72
SUNSHINE COAST MAIL CENTRE QLD 4560
Dear Madam
Change to an Existing Approval
Integrated Planning Act 1997
!I I I I I I I I I I I I I!I I I I I I I1 Ii i i
I refer to your request to make a change to an existing approval On 5 January 2010 Council decided
your requested changes
Details of the decision with the consolidated conditions are as follows
1 APPLICATION DETAILS
Application No 2008/383
Street address Claude Batten Drive & Haul Road Noosa Heads
Real property description Lot 114 MCH 839107 & Lot 115 MCH 839107
Planning Scheme The Noosa Plan
DECISION DETAILS
Council on 8 January 2009 decided to issue the following type of approval -
• Development Permit for Operational Works - Prescribed Tidal Works - Access Jetty, Coastal
Development Pumping facility
In relation to the request to make a change to the existing approval, Council on 5 January 2010
decided to
A Approve a change to the development approval with changes to condition 1
B Include amended Concurrence Agency conditions
C Issue a Change to Development Approval
3 RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Approval is identified in the Assessment Manager
conditions
Page 1 of 19
Caloundra Office Maroochydore Office Nambour Office Tewantin Office
1 Omrah Avenue 11 - 13 Ocean Street Cnr Currie and Bury Streets 9 Pelican Street
Caloundra Qld 4551 Maroochydore Qld 4558 Nambour Qld 4560 Tewantin Qld 4565
T 07 5420 8200 T 07 5475 8501 T 07 5475 8501 T 07 5449 5200
F 07 5420 8900 F 07 5441 8338 F 07 5441 8338 F 07 5447 1062
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 27 pages
Page 2
2008/383
ASSESSMENT MANAGER CONDITIONS
1 Development undertaken in accordance with this approval must generally comply with the
approved plans of development The approved plans are listed in the following table and as
may be amended by these conditions and annotations made to the plans -
Plan Rev. Plan / Document Name Date
Document No.
33030-0-01 Noosa Beach Nourishment Sands 7 July 2009
Recycle Automated System Pump
Station G A Sh 1 of 2
1 33030-0-02 2 Noosa Beach Nourishment Sands 12 July 2009
Recycle Automated System Pump
Station Elevations Sh 2 of 2
33030-0-03 2 Noosa Beach Nourishment Sands 11 July 2009
Recycle Automated System Pump
Station Site Plan
33030-0-04 2 Noosa Beach Nourishment Sands 13 July 2009
Recycle Automated System Sea Water
Supply Pump Station G A
33030-0-05 2 Noosa Beach Nourishment Sands 13 July 2009
Recycle Automated System Sea Water
System Site Plan
33030-8-01 2 Noosa Beach Nourishment Sands 13 July 2009
Recycle Automated System Transfer
Pipeline Alignment
11456-1 B B Proposed Sand Recycling Trial - August 2004
Noosa Spit Beach to Noosa Main
Beach Noosa Heads - Site Plan and
Details
Noosa Beach Nourishment Sands -
Recycle Automated System Land
Development Contours
and as may be amended by these conditions
2 Suitable signage shall be placed at the perimeter of the work areas advising that the area is
not accessible for members of the public The signs shall be placed prior to construction works
commencing and permanently affixed to the inlet jetty and pump station upon completion of
the works The design of the signs shall be approved by Council's Manager - Works Planning
prior to the erection of the signs
3 Existing trees on the site and within road reserves are to be retained, except where required to
be removed due to building operations or the conduct of the approved use
4 The clearing or disturbance of existing vegetation shall be limited to the proposed works area
and any necessary access ways extending from the existing road formation to the works area
5 Any areas of removed or disturbed vegetation remaining after the works shall be replaced with
suitable local native vegetation approved by Council The revegetation shall be carried out in
accordance with Council's Planning Scheme Policy No 3 Landscaping Plants & Guidelines
6 Any person acting on this permit shall prevent erosion and sediment export from leaving the
site Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary
Page 2 of 19
Page 3
2008/383
7 Certification by a Registered Professional Engineer of Queensland shall be submitted to
Council stating that the works have been constructed in accordance with best practice
methods, is in accordance with Coastal Protection and Management Act 1995 (specifically the
engineering previsions of the Coastal Protection and Other Legislation Amendment Regulation
(No 1) 2005, Schedule 4A - IDAS Code for development applications for prescribed tidal
work) and is structurally sound
8 This approval or its conditions do not constitute a ruling on structural safety and the applicant
must make their own arrangements to ensure adequacy of design and work Furthermore, the
approval does not warrant that associated plans and specifications have been checked in
detail, nor does it absolve the owner of the land from complying with all the conditions of this
approval and/or relevant Council By-Laws and Policies and/or relevant statutes and/or
statutory regulations in the execution and/or performance of the works The Council does not
accept any responsibility for the accuracy of any plans and specifications as approved
9 The Development Permit for a Operational Works lapses if the use has not happened by 9
January 2011, unless an application to extend the currency is approved by Council
5 REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are
Referral Agency
Tidal work that is Concurrence Department of Ecoaccess Customer
prescribed tidal work Environment & i Service Unit,
other than in a canal Resource PO Box 15155,
Management CITY EAST QLD 4002
Tidal work that is Concurrence Queensland MacArthur Avenue East
prescribed tidal work Transport - PINKENBA Qld 4008
Maritime Services
Qld
A copy of any referral agency conditions is attached
6 APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table
Plan / Document No.- Rev Plan / Document Name Date
33030-0-01- 2 Noosa Beach Nourishment Sands 7 July 2009
Recycle Automated System Pump
Station G A Sh 1 of 2
33030-0-02 2 Noosa Beach Nourishment Sands 12 July 2009
Recycle Automated System Pump
1 Station Elevations Sh 2 of 2
33030-0-03 2 Noosa Beach Nourishment Sands 11 July 2009
Recycle Automated System Pump
Station Site Plan
33030-0-04 2 Noosa Beach Nourishment Sands 13 July 2009
Recycle Automated System Sea Water
Supply Pump Station G A
33030-0-05 2 Noosa Beach Nourishment Sands 13 July 2009
Recycle Automated System Sea Water
System Site Plan
Page 3 of 19
Page 4
2008/383
33030-8-01 2 Noosa Beach Nourishment Sands 13 July 2009
Recycle Automated System Transfer
Pipeline Alignment
11456-1 B B Proposed Sand Recycling Trial - August 2004
Noosa Spit Beach to Noosa Main
Beach Noosa Heads - Site Plan and
Details
Noosa Beach Nourishment Sands -
Recycle Automated System Land
Development Contours
The following Advisory Notes are for information purposes only and do not form conditions of
approval
1 Should any changes or modifications to the approved plans be required as a result of
construction constraints, a Change to an Existing Approval Application under the Integrated
Planning Act must be made Amended plans clearly indicating the changes must be lodged
with this application along with the appropriate fees
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act)
The ACH Act establishes a cultural heritage duty of care which provides that "A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage" It is an offence to fad to comply with the duty of care Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act
can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural
heritage or the cultural heritage value of Aboriginal cultural heritage
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act
8 PROPERTY NOTES
Not applicable
PRELIMINARY APPRQVAL OVERRIDING SCHEME
Not applicable
10 FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit required Subject of the required Development Permit
Not applicable
SELF ASSESSABLE CODES
The developer must comply with the following codes for self-assessable development related to the
development approved under this Decision Notice
Not applicable _
X12 SUBMISSION
Not applicable
Page 4of19
Page 5
2008/383
t l!3 REASONS I GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not applicable
14 RIGHTS F APPEAL
You are entitled to appeal against this decision A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached
115, OTHER D
Should you wish to obtain more information about Council's decision electronic copies are available
on line at www sunshinecoast old oov au, or at Council Offices
Decision Notice History
8`January 2009.7 Original Decision Notice.
January 2010 w Approve a change to the
development approval witii
changes to condition 1 and
amend Concurrence
Agency conditions
Yours faithfully,
Denis Wallace
Senior Development Planner
Cc:
Department of Environment & Resource Management
Ecoaccess Customer Service Unit,
PQ Box 15155,
CITY EAST QLD 4002
Queensland Transport - Maritime Services Qld
MacArthur Avenue East
PINKENBA Qld 4008
Page 5 of 19
Page 6
2008/383
Referral Agency Conditions
Sunshine Coast INTEGRATED PLANNING ACT 1997 & 1998 REGULATION
Regional Council
Notice
Amended Concurrence Age my Response - 17608
Tt nc is xssasd by The D icnt tart art Roowwr* NorwVwrow t putrsrmnr ra S"Wift
3317 33 v6 In rat ; 1907roadw,vvis saacrr ^
Stanstaine Coest R cx Council Sutishtne east Regional Council
Fie and DevelDpmeat Assessment Una C1- gents Shaw
Locked Cag 72 P0Box 61
SUNSHINe AST MAIL MT OLD 4560 NOOSAV1LLE OLD 4666
Our r ace `937 ,; ,. Y1958
Pteai rrdrltaa i
Re. R l for Concurrence Agency Resporme
The OVatbraint of ron nt and ftesmirce, Management (DEFRtai), acting as a concurrence agency,
w ahee to advise that your appk*bQn to changes condkin of the existing de [Perm
t et tPCC411176O81, repoWed on 13 November 2009, has been d and a de== has been m e to
apprr ue the, changes to the coricurrence naeponse, subject to ndi
An AnwWed DevelbpomM Approvel (concurrence response) tf 0111760 has been issued faftaW"
'Much rep ee the ea nth perry issued 17 2008
Proper rlLocation:
address - Noose Spit and Ma,, Beaches NOO 1A HLAC}3 OLD 4667
Lot'PIa - Lot 114 and 115 en Ran 39107
2 Details of the recommendation
Aspect of Orvolopment
-Gencurre R -enoro roona1w':e
-1 a hs quarry material on State cow , --ne above htgh water m
Prescribed Tidal Weds
Recunrwividatiort
- Granted with conditions
Pape I of 7 . AFOW1109
ar 6nwamttmant mad aae
a nww derma gov stn *ew "0 M as
Page 6 of 19
Page 7
2008/383
Amended Coni urr ce A gem Response - IPCC011176O8
CEO of Number
- IP El111'TfS
Currency pfd
This appr Ural vAll lapse Iess auE e s rrn the asst by ft
snt :ert the tr,n--andr•a ports s t s1 of the ed
FIOM" Ad 1997 ap:«tlyrt to nt in thappr al AMOM me following
currency period% applying to aspects of development in this approval
This approval will lapse r to ffi aIy started w0w two years
4. The approved plans
The approved plans anditir d r for this afare
Pb w nt PlarwDocu ntmanse
1 Noma Beach Nourishimeril Sands Recycle Re
AUWAStod System -Tr nstea P"Ma Alignment dated 13 7
Noosa oh Nwrish Sands Rocycle P n2
Autorriated System - Saa Water System Site Man led 1310711
Nr R-tach N ,►nehr ent Sands Recycle R
^i_-i3O44 n2
e,,:jrna! lSystem- Sea Watef Supply Pump
ted 131071
SInGA
33030-0-03 Noosa, Beach N t Sands Recycle Re
AAuknuded System Pump Ste Srle Plan dated 1V07t09
Noose Beach Noutment Begs Rev RevES,un 2
Auftimated Systern - champ StMn G A Sh 2 of 2 doxi
Nom Beach Nounshment Sands Recycle
A d System Transfer - Pump Staban G A
1of2
Pro ,used Said R r Tr31 Noose Spit Beach
1145B-IS to Nn Asa Main Reach rooss heads- Site Plan and
re;.,3
F tac,SaMain (}r Ch Now
AutO^:vater7 ays",ena Lars,
2017• tr
Page 7 of 19
Page 8
2008/383
urrence Agency Response - IPCCO1117
Conditions of the Development Approval
Aa trrbereat:
I The wracks muet n geraifty on accondance with the approved ptar,, I ?,^d un
(4) of to noti
all l a p s e s s the parmainerA SOW &M king facility has not bow coWnxted,
I l Cl psaee
thin 20 Osys of Ula permit l
The send sttrrh :Irurty aodi'^r ei ci vt III JFt not cmae any disturb to any dams of
ant 1 in the area tf any Ater s of cultural hit are dtscovcr d dicing constructicin at
a atom ,r ticks rust osa<- r- . v c, etc iy sind the ap roi riele at rttre5 rru t be notified
4 The Sunshvis, Coast Regionial C rich must ensute that app a trica*.ures are taken to prevent
pollution as a resuh of sill rur , and grease spills from machiery, f ete hick washout and
aWA Concrete r wash *LA ,hall lanly be conducted in a specified area to fhcihtete the al
of waste o mcreta from area to t ndfol Waste from deanrig equipment shall not be
chschargW d eny or in4micty to any ,fit
9 Yr d n to the provis + the A' t 1994 and raeral
et' duar of cam not to pcOr the enwr trey or to a conterrtst l site When undertaking
WWu
grey tte : Co t
no s acuity, mw rcause advail" rrnpacts on robx-d coasW
pnxxwxoas of the religion
y 060.00ft3of send may the teas WffhAany (12)
oath period, provided it a consistent with the net natural Idaral do and does net affed the otber
appk*aJa ihon
8 to only extracted tom wee labelled 'Area or Sarni n' and only deposited in area labelled
of S id deposdof as shown in Figure i (Dr&mV 1 E)
9 While 9* sencl sitter can be rapes beta,.s?t in the 20Dm area deprc'ed eael of nor
m ht wing wall, ds :atioon ahieS always be sutti 'rky seaward to pratrodc surrbcoent beach trradth
$ir as net to have clot nPaft on the dune and v n system The s:ard shifter istie
cause long term reonsion of the Bch profile
10 No a" is to be removed tom the maw dune systerill
11 No sand be perrrr from ft act" bearhsyubami
Pap d of it * AFOWI09 D&MtUftM of FnWMWWK add Rttltrrarrae UM"OMWW
Page 8 of 19
Page 9
2008/383
Codes for sel as ss able development
Any le d&valopnent for an t ronrrra ant in torj.1
WO ON 1, nX* rngly WAh t ft4€r s i Cade o ri tal
G. Assessment Ntanageir ibilities
AM" naft that A 1.s a rah nremont rn t Se *cea 3 5 15 a, d 3 517 Fdte ratad Pang Art 1997
t o+f1' t Ma =xtrtavict ra_ rtco) tta, rhrs apphea tide
asued by Ow &mstnv agr, ! Cc r» , ;fie 1 rwded to "d11 mAwal aganW Thsref r& y u
aalg/r^ Jw ca1^s t s Unar PO t 15155 CITY EAST
41102 an _ ra fid ,:,W to
h. adtd Aon, The S 'it W k t^r^:r ee nrlre to tM#tgp' far arse t of nakm We
issues for an i4ppkaa*r /estAlm Ihe Asses tat h*vwW 7 koa , DEW has not
prowcW a noitiftabon to native t!tte dies
If y + require dnfo m w plone, tac t jam= , the , on the talophone
number d below
Yours sincerely
r
Ben Sale Enquiries
Iger^^lrwr;lr^r c".tttJ S - Reg Serv - Boo North » Sunshine Coal
taano Worth € (-^eun ll
EftvrormW" SarvMa Guth PD Box 168 COTTON TREE OLD 45558
Department of nvronr nt and Rf-ioume Management Phone; (07) 5141
Fax (07) 543 9927
P }&3e(8•tR 1 k M 61 EnAtaflotm OWR M
Page 9 of 19
Page 10
2008/383
ed Comurrence cy Response -1FCCO1117
12 The sand shAM activity aridW wsoci li not resultin dwWa. to
pin,w arid tt 1 rgme of the Noosa ewer`
13 z`.aodree na! :mris must betaken +
th ,pets "1nn t e nd 5h f; i rl ^r arxVor
14 The n r is rotto oP+,°ei'r_t,.:ic vadewof Wow the natural surface prAAI* or the
required to rr /main sta ity of the Via lever Train*n welt (wrichieveir *a the lesser)
15 SON ShO be plOt8d uniforooy a'tr,ng ih ecuoo of beach to ncvnftd using the disch
aailoWe and in aszordariee cereal Lhe ape >fied plans
16 AN d sand "I be and rtoe at slit. Glam. cr io mMenW or any other deletenoitis
5UbWAMO e tie of a arxa c=snpatlo uith t sand
Wit!SWa& lojf
17 For all works whim the salty that may prim acid sulphate soils, an acid cu to
sows erw tigabee must be nod in accordar ca with the QAS& Guidelines (Ahern C R, Ahem
M R and Powell B, 1axon's far Sarnptirtri and Analysis of L wand Amd Sulfate Sods (ASS) in
Oueensland 1t , Queensland Deportment n` Na'u-al Rosourd and Mines) or s ibsequerit versions
theired, prior to commencing the ca nst,iictiun wcrks
18 Constructicin and tint of the said sh firing facility mu-5t oo mpty wish the Latest ri of the
p twtttYrtmer Prot tion A ^sncy drrSfr^l^;fa^ , s rcr ths^ Trani rf anU ::faR^tt ofMid Sis
Sods, 2001
irate saris must be managed such that contaminants are not cirely or
result of the con5trtion and operation of the sand .shifting ect, , ity andior associated act vv it i^ ro ., „
waters or the bed and banks of any
20 AN works must be wW ken in a manner tf'°tt m*wmwa dames to the v tore adpoent to the site
21 The width of clearing of the vegetaatirrn for ar , -ss and car n works is to be ms imaed a rd Mature
try Ito be fined whom pot: hlO by r, vor realignment the Works
22 Ail organically enriched mid removed from/ the top layer (topsoil) Min the proposed development
areas must be stockpiled separately prior to excavation, and respread over the devellopmerit area after
rem thng aspart of the riovegetabon works
23 A areas of exposed are to be t iced inst wind erosion dry the construcliori period
24 All material excavaled from a dunal system for Combudion works roust be placied, filled and
bitr against Wind tort on the seawar4 sate of the budding or structure
25 Any arosm or loss of d swrounding the works that ocems because a(dwWa caused by the works
must be rechfaad
P"o Sof8 C Cos MPMUPM ark le
Page 10 of 19
Page 11
2008/383
G d Concu me - IPCCO
26 tm rely foltrswi
• The du n l Amos are be lied to naturW WoNe of the system
• thaturbed areas we to be :l *t t l wind arown and rawwwaW Tura-e [' er sto find
r&aQstated through tit of the endaim neeve plants common t+) the site,
• The eree is to be fenced to proveirit tnen aocass acraes
Itie r
• Riparian vegetatim is to be rewmstatad adjacent to the access jetty %twe emsiM vegetation is
disturbed and wheire eaz ng pump uttl1rastruchim is removed
27 The drairfte of pvom overflow a Lets and stern/ va er associated w9h the sand shelter purrptng
elation Mgt not omm a rn of the daarie or best, sateen
23 Ak_ces-, to this permanent pumping station We shy be along the deswated vehicle track, and
rr tic rig dun al station Met be maintained to satasfactioa oft Deft of
exit and F Reffewas
q.rf r,i7.^iT ""mt
29 The saiid slir'hugt activity andIce associated activities Must not cause l ter m ain +
tlr r .tni t N1¢pf :..-ibors
30 The Sunshine P,:<)rr 121 r ounvl shall he Te,p,rsftaFe for ft MWOM of the woft if in the iMM
of t h e tteparlmeM L , r ECn it )rv uri: and Rc^Lmi r Ntx' _u mon L the works Unacceptable adverse
$#$C% ar gu*n tr ay aces of erosion to ii^ stunt that t I chimes a dangerto the public
31 Should the taM shdtiirg faod4 and led anfrastnicturc be, darri sgcd as a restill d me erosion the
urrstinre Coast Regional Coumll shag be sihle for the removal at all debris Irm (he beach
32 In event cif damage or loss Lip of the works by sea erosion, true Suns sine Coast Regional Council
met a rbrnit another a pplicalmn if reconstruction of the works a proposed
33 A written widertakirg from the $unshtne Coast Regional Coi it to to be rocemod by the Department of
Enworinvent and Resource nt agreeing that the works will be considered to be an
expendable structwe and that no protection v.:oo;s, other than beach meent will be carned out in
the event of an erosion threat
Papsals• tcst Depaitwo aterwtnamienta st
Page 11 of 19
Page 12
2008/383
Amended Concurrence Resp2nw - IPCCO111
34 T br Coasit ional Court ie a ttd Mang >agmantPlan which details #DO
tir}nat and erttr attorrn atr^teg a l r5i tt#nt 4wt 1 ttla t3tlrt t t nr;:y of his api?it val Tike Flan shall
t dear nrt rn arateqy too e rrr^g t t } poet : ^' - ns tent ^zrth n91ur ne
f rate Asa ml r r, plea should t d idc wr thl y m rnt ng of the= v@ etajon lire
36 Details o f the qua" of send rei ed to be nt 4o IfNt, [ ep om it of Etwwronment.r d Rasoume
Management anamom basis
n 12 m aof and at 6 rtc•r°,:alss Cw Sooner if t h e O c t f r e r t t ' n e r i t o f Eftwirowrtenl
and of Men lon[ f w r saabie concerns that ttu; p cu3 or r aonal tialw-,iil Coastal
s"s are t g adversary` ai et-'ad, a program of resuarrfa must be undertaken to & :*Mina the
to g-term mp; of matte rfi+ng gy ration a^ t re da_pc, ita ;ua1 cha€actens a+ s r?t C1 ^ II struary In
parbcr, r. the molt,,tFry-a?mentanct asuaucettariac,¢ementseeks:odeter,,ire ha aerthe
O e'ation of the sand elPiitw lo: F Sty w,:ttiltt the sictrc s,stemi lsnderrnine31he supply of rr ii t ^t to the
estuary I tie C pt xtentt of l ri; ronamo and rce Mat nrgenrenl r.,ust to ct n;,ulled ii tl-
dovelopment of the Mosarch program
37 RxwordirQ of anyfaonal byr-c t i ese ted with the sand shrfIi r i a0vAymWbt undertak err a
dailly basis dt.nr.days of caperafion pt bya#atch must be provided to tl epar'msrit cf
Ematwr at :,t and Pe°' ur (, Man ent b t ,r a fps tie cws year of oper in
„tS Fe;,-, nr-I l rr^ ri mfIr,f) ;5, a t flka n^ y^y , ^ 6 monsr Bor ttie first fi y rs and riunllythe-e: ttr
frog n to h to 1Iie sand
; 'r a l _i r, antra at Mom Spit IUMh
>$a)ir3 .. tco t afea at Nova Ma fi Reach
One arvIlcinq row,4t be adelladed survey ( wey intorrf $ 'if -50m) anal and d,_- r- ?of the stff
f n (mil um 5r ivoter ^) The oth p frig e urit m uA icluirs 4 pox fsut, ur lI bn:a!la z:Ufu
(t at Nauss Spit Beach and twoat WOO* Mom Boa a) Both sur efs m-51: be pro•: cuc- to the
D tats t Ei-i iron(nerli ar-W sauce Man meni upon completion
Pap 7 of 8 . ANW1 F9 oftmawisit rat ekraiartrem e t eitid nt
Page 12 of 19
Page 13
2008/383
Amended Concurrence Agency Re!nse - MCC01117,608
END OF CONDITIONS
P 8of8-AF 4109 ne r n nt
Page 13 of 19
Page 14
2008/383
Jueenstand
Govern men t
ad
ill, S;mI"
4
P20
Page 14 of 19
[OCR of page images]
2008/383
. gene Queensland
nan Government
19 November 2009 ; sachin Seley
Denis Shaw duestsiand Transport
Coastal & Canals Manager
Sunshine Coast Regional Council
Locked Bag 72
Sunshine Coast Mail Centre
Atta: Peony Houston
Dear Sir
Tidal Works ~ Request for comments - Change to au existing approval for a sand recycling
system at Noosa Spit.
‘Thank you fer your letter of 12 November 2009 eboat your application to change the existing
approval for a sand recycling system at the location mentioned above.
Ag 4 comturrenice agency under the ntegrated Planning dct [997 and Cuan Protecnon
AManegeonnt det 1993, Mariteme Salsty Queensiand has no objection to the proposal prowded the
following navigation and marine safety condnions are addressed
i. The construction must comply vath Sturry Systems Marine Pry Led, Dws 33030-0411 w 5 Rev 2
and 33030-8-01 Rev 2, attached to your letier dated 12 November 2009
2 In respect to the seawater pump aovess jetty the conditions numbers 2-11 in our letter dated 06
March 2008 sail apply.
3. In respect to the snchusson at the sard shatter srtii the development application, the conditions
continued in our letter dated 25 June 2003 still apply.
4 The contractor must compete construction withia tee years from the dare of approval. If
construction is not completed. you will need additional er amended comments from the Regional
Harbour Master
Markime Salaty Queensland en sof = FRNOIGE5 ES) PAORER EsbEd P20
darts Cysarations (Brabare) Your nef
Mendis Avenue East Enguires erm Hale
Piece Caeetmard 4008 Tolaphone #01 ¥ 3000 2558
Facaindie +81 7 JO80 350+
AGH 13 3 590 820 Webslle wayemeg ght gov ay
‘Enseil a
Page 14 of 19
Page 15
2008/383
,I,', c,. nr.i i--_:1 i., r,: further c n u d'a[1 th^+ a
{,`:pl.i„ 9l'; IIs,i
']`.' is,I EI FriuUY'"Nfasl,-t 1B vi,I,,,r, -1
4^A 5'^ir.n:tn^+ P as
Page 15 of 19
Page 16
2008/383
Queensland
Government
6 MniCh 20 08 Manhrne Safety
Quernshrr
(1JPPA4lt3hri trrh5 i rt
KIis Bead}
NQoSa Council
1`0 BOX 141
Tewangn Qld 4565
F, )ear Kris
TSdal Works -Rti Request for comlucuts- 9eawatcr Supply Pump AccessJeltp -Nooslt Spit
Thank you for your lettrrof 25 February 2t71]$ about ynnr applic.atio i 10 Construct a jolty at the
location mentioned above
Asa concurrence agency udder the Inca grt2ted Ptwrvrrrrj Art 199? and oak: i Proxcrtcat
144wagernrntAct 1993, Maritime Safety Queensland ho(; no ublt9:Linn llu ILt prvpoyal prcrvidcd the
fa hewing ntivlkptlbn And murinc saF y Conditions are addressed.
1 I'he couSrll]Ction 111 US( Comply with Nona GwnOll, DraawInp No 33020 R, 33020-4--04A.
attached to your letter dated 25 February 2008
r! You, or your int. must advise the Harbour Master thr cnrllmenc chit n1 dale, pruposcd
rimctablc, and contractor contact details at least rwo rinrka beburC cc}mrncnpang constnlct]on.
3 You, jr }our agcni., rnrrat itauc any notices the Harbour hfasrer requlta;s
4. You, or your agent, I uuSt xidv I Sr Vie Harbour Mouth ti.i hen you have completed construction
5 You or your agent uwst supply. Insrall awl IIla[nlairl any nati, jtaon ]tght5, boo} 5, marks or signs
the i4srbour Nfastcr considers I]ccessal) Arry tJQhts buoys, marks kind Signs most accord wldl
Mrtniimp Safety Qiic. n gland's rcgilircmcnis. The jetty shall be fitted with wbm mg signs for a
water intake - no uw i mmmg or mooring
6 You rnu,t udcxluaia,ly light the stricture. The t:Oi motor must position all lighting o it duce not
Cause d rick in therm,fin navlys]trcn of othcr',essels Any freestanding plies In-us'[ have rerrll-
refleclivv tape fitted
marl-,r sare1X Oraaeras did Cyr rer' 71(1'C 1 E5 P275 6 E25218 F2
Kau m Gpcndois (tirwbene) Yale rni
MAcMhurAwn o- En-t EnLuarrs Glean laale
fIrMlibe Quesnaierd 4001 rcxnlhnne *51 7 RN 9559
rnea Ynlb 4si 7 3sI&I 3571
AB21132fl63WSM WebIile www rn!ggIdGavau
Final glen nh dr ul5q Clb+gvr III
P
Page 16 of 19
Page 17
2008/383
r. You. or your agatity ittttst rc ncnu rely abelrucLtunc and drl.iris rniountcrcd during. construction,
and dispo o of them, a3 the Harbour hl aster requires
$ fin, ships and crluiplnCnt you or your agent Ilse must comply with the il~vr spnvI O}rerr^t&e s
(1M. rare Srrferyl .d" 1994, the Trar,pcn Operar1errs (,mitreS'crfety) f egufat+on 2004 and the
Yrarimped Ofrtrallanv (+', frrrnr Prftvon) 4 cc 1995,
9. this facility is ttotto be t Bed for the msatmrngtyfressel5,
10. Any ship, plant a r equipment that depla}r anchors in open waters, and in and near shippin
channels roust hoer the rmuhr ry ni knd with yellow buoys and fitted with F1 Ycllow Iigh ls,
11. 1Jie oonttactor must;Pmplele c om•trti li n within n',.a years from the date of approval, If
anstrvcttvn is trot comp[eicrl, you will need additional of amended comnienis rrrrrn the Regional
I [arbour Mactcr.
4lai itime Sakti Quernnlund rkx:s not need to be fiirilier corksu[ted if till of the above cuttditittnx arc
met.
The above conditions Must he au,luderl in your application to the assessment rrtFmru.cT, 4
Yours sntcerely
Captain Richard C Jo}m_,rm
lftegiottul Aarlnru r Master (Brisbane)
Maritirm Sabsty L QOn9mno Page 2 at2
Page 17 of 19
Page 18
2008/383
Sunsh in e C o as t Appeal Rights
Regional Council INTEGRATED PLANNING ACT 1997 & 1998 REGULATION
The following is an extract from the Integrated[ (6) If an application involves assessment against a
Planning Act (Chapter 4). concurrence agency code, appeal rights for submitters
for the application are not available against the part of
Division 8 - Appeals to court relating to the approval that represents the concurrence agency's
development applications response for the code
Appeals by applicants Appeals by advice agency submitters
41 27 (1) An applicant for a development application 41 29 (1) An advice agency may, within the limits of its
may appeal to the court against any of the following- jurisdiction, appeal to the court about the giving of a
(a) the refusal, or the refusal in part, of a development development approval for a development application if-
application, (a) the development application involves impact
(b) a matter stated in a development approval, including assessment, and
any condition applying to the development, and the (b) the advice agency told the applicant and the
identification of a code under section 3 1 6,' assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a application as a submission for an appeal
development permit was applied for, (2) The appeal must be started within 20 business
(d) the length of a relevant period, days after the day the decision notice or negotiated
decision notice is given to the advice agency as a
(e) a deemed refusal
submitter
(2) An appeal under subsection (1)(a) to (d) must be
started within 20 business days (the "applicant's appeal
Appeals for matters arising after approval given
period") after the day the decision notice or negotiated (co-respondents)
decision notice is given to the applicant 4 1 30 (1) For a development approval gven for a
(3) An appeal under subsection (1)(e) may be started development application, a person to whom any of the
at any time after the last day a decision on the matter following notices have been given may appeal to the
should have been made court against the decision in the notice-
Appeals by submitters (a) a notice giving a decision on a request for extension
of the relevanrt period for an approval,
4 1 28 (1) A submitter for a development application may
appeal to the court about- (b) a notice giving a decision on a request to make a
minor change to an approval
(a) the giving of a development approval, including any
conditions (or lack of conditions) or other provisions (2) The appeal must be started within 20 business
of the approval, or days after the day the notice of the decision is given to
the person
(b) the length of a relevant period for the approval
(3) Subsection (1)(a) does not apply if the approval
(2) The appeal must be started within 20 business resulted from a development application (superseded
days (the "submitters appeal period") after the day the planning scheme) that was assessed as if it were an
decision notice or negotiated decision notice is given to application under a superseded planning scheme
the submitter
(4) Also, a person who has made a request
(3) If a person withdraws a submission before the
mentioned in subsection (1) may appeal to the court
application is decided, the person may not appeal the
against a deemed refusal of the request
decision
(5) An appeal under subsection (4) may be started at
(4) If an application involves both impact assessment
any time after the last day the decision on the matter
and code assessment, appeal rights for submitters are
should have been made
available only for the part of the application involving
impact assessment Division 9 - Appeals to court about other matters
(5) If an application is processed under section Appeals for matters arising after approval given
6 1 28(2), appeal rights for submitters for the application (no co-respondents)
are available only for the aspects of the development that 41 31 (1) A person to whom any of the following notices
would have required public notification under the have been given may appeal to the court against the
repealed Act decision in the notice-
(a) a notice giving a decision on a request to change or
cancel a condition of a development approval
Section 3 1 6 (Preliminary approval may override local
planning instrument)
Page 18 of 19
Page 19
2008/383
(b) a notice under section 6 1 442 giving a decision to (c) the decision to give a preliminary approval when a
change or cancel a condition of a development development permit was applied for,
approval (d) the length of a period mentioned in section 3 5 21
(2) The appeal must be started within 20 business relevant period,
days after the day the notice of the decision is (e) a deemed refusal
given to the person
(2) An appeal under subsection (1)(a) to (d) must be
(3) Also, a person who has made a request started within 20 business days (the "applicant's appeal
mentioned in subsection (1)(a) may appeal to the period") after the day the decision notice or negotiated
court against a deemed refusal of the request decision notice is given to the applicant
(4) An appeal under subsection (3) may be started at (3) An appeal under subsection (1)(e) may be started
any time after the last day the decision on the at any time after the last day a decision on the matter
matter should have been made should have been made
Appeals against decisions to change approval conditions The Registrar for the Building and Development
under the repealed Act Tribunal may be contacted at the website
4 1 33A (1) A person who is dissatisfied with a decision http Ilwww localgovernment qld gov au/
made on an application to change the conditions
attached to an approval given under section 2 19(3)or For Infrastructure Charges Only
section 4 4 of the repealed Act may appeal to the court 41 36 Appeals about particular infrastructure
against- charges
(a) the decision, or (1) This section applies to a person who has been
(b) a deemed refusal of the application given, and is dissatisfied with, an infrastructure charges
notice or a regulated State infrastructure charges notice
(2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of (2) The person may appeal to the court against the
the decision is to be given to the person notice
(3) An appeal under subsection (1)(b) may be started (3) The appeal must be started within 20 business days
at any time after the last day a decision on the matter after-
should have been made (a) if the notice is given because of a development
Appeals against local laws approval or master plan approval-the day the
applicant is given notice of the decision about the
4 1 33B (1) An applicant who is dissatisfied with a
approval, or
decision of a local government or the conditions applied
under a local law about the use of premises or the (b) otherwise-the day the notice is given to the person
erection of a building or other structure permitted by the (4) An appeal under this section may only be about-
planning scheme may appeal to the court against the
(a) whether a charge in the notice is so unreasonable
decision or the conditions applied
that no reasonable relevant local government, State
(2) The appeal must be started within 20 business infrastructure provider or coordinating agency could
days after the day notice of the decision is given to the have imposed it, or
applicant
(b) an error in the calculation of the charge
For Building Works Only (5) To remove any doubt, it is declared that an appeal
Rights of appeal conferred by Section 4 2 9 of the under this section can not be about the methodology
Integrated Planning Act 1997 as follows used to establish the charge in the relevant infrastructure
Division 3 - Appeals to tribunals relating to charges schedule or regulated State infrastructure
development applications charges schedule
Appeals by applicants
4 2 9(1) An applicant for a development application may
appeal to the Building and Development Tribunal against
any of the following-
(a) the refusal, or the refusal in part, of a development
application,
(b) a matter stated in a development approval, including
any condition applying to the development, and the
identification of a code under section 3 1 6,3
2 Section 6 1 44 (Conditions may be changed or
cancelled by assessment manager or concurrence
agency in certain circumstances)
3 Section 3 1 6 (Preliminary approval may override local
planning instrument)
Page 19 of 19
Page 20
'
IA VB
II
4000 3000
zz^ • s-^
COMPACTED ROAD BASE
PARKING & LAY DOWN AREA
0
a
SUNSHINE COAST
REGIONAL COUNCIL
PLANS APPROVED
Signature
Date
Note I- tronsforner Entiosure
CAhiercii t Industrial Substatbns Manual
DRS 0[605 Vera 5.0 Dated 09/06/2001 SCALE netres
Note 6 frier Is setf contoined With n0 dicClarge to the site
>,B No. 33030
am""
0r ii, td'ul) d Cfaun. a
mmmom
tWE 1 SunshineCoastI SUNSHINE COAST
ONWw.arwsaana M NOOSA BEACH NOURISHMENT
SANDS RECYCLE AUTOMATED SYSTEM
SLURRY SYSTEMS MARINE PTY LIMITED PUMP STATION G.A. Sh 1 of 2
i LN sterE mm M AWL.
of 1cw k asStow A31 33030-0-01 2
Page 21
CORRUGATED IRON COLORBOND
INF ILL CORRUGATED IRON COLORBOND
ROOF
it III 1 11
w
I
ELEVATION A-A ELEVATION B-B
CORRUGATED IRON COLORB0ND
INFILL
JIB CRANE
FOR PUMP 10-SPI MNTCE
I BRIG 33030-SK01
FEED SUMP C4
-1 H
B
8
0
M
Fe
s
fit
I
ELEVATION C-C ELEVATION D-D SUNSHINE COAST
REGIONAL COUNCIL
PLANS APPROVED
Signature
SCALE Metres
0 1 2 3 4 5 6 '5 / I A(a
NOTE: RUNOFF FROM ROOF AND SITE INTO LOCAL AREA Date
6Av30p-KS + owo3Q
w"` S uns hi ne Cogs SUNSHINE COAST JOB No 33030
R-:v *1.at:.,u d uaIrrel.elm ,Am m"NOOSA BEACH NOURISHMENT
01 mw NTC 12/7/09 " "" "a° ft" SANDS RECYCLE AUTOMATED SYSTEM
i
A
2 12/7/ o fort ooxsm cnOe TC LN NT LN
SLURRY SYSTEMS MARINE PTY LIMITED PUMP STATION G . A . Sh 2 o f 2
DRAWING No
uc:.asicm Sw€s Stn 9!E NRMk.
REFERENCE DRAWINGS ax x otac ftx aua ,^° ,,, ^,.. .. ,I AsSh o A3 33030-0 -02 2
Page 22
153
Coast Guord./
H 7061900
sum SS 9W tY MAlEA "Pan
r r r r AM SNU/SPAWAOt WWWM P6EUH
RL pii - LEVELS
e
*fl PI $dwsw Level R.U
SUNSHINE COAS
M eove R REGIONAL COUN IL
Year ARISIgm Water
Lagoa by RL LB
PLANS APPROV D
LB
Mean Hlgh Voter SprkV RL 0420 Signature
0O AJLH Date Sj IjF©
Neon Low Voter Spft A. -0.0
JOB No. 33030
NOOSA BEACH NOURISHMENT
SANDS RECYCLE AUTOMATED SYSTEM
PUMP STN. SITE PLAN
am 0.A. I of 2 $me ow
REFERENCE ORAWtNGS A3 33030-0-03
L .J
Page 23
ti
12000
SECURE GATE & 400
CHAINWIRE FENCE TO DENY
PUBLIC ACCESS
----------------
----------------- -----------+4 RL 2.600
20 Year A,R.I. Storrs Water Level,
Laguna Bay RL 1.8 AHD
YAV( Y1.
Mean High Water Spring RL 0.620
River Bank
A.H.D
Protection
Mean Low Water Spring RL -0,800
Stilling Well for Pump 10-WP4
DN 300 Std,Wt.Coated -----
Steel Pipe Open Ended
River ReH
SEA WATER
SUPPLY PUMP
SECTION A-A 10-WPI
lectrical Conduits
2 x DN100 Gal.pipes
•A 150mn Spacing
between pipes
SECURE GATE &
CHAINWIRE FENCE TO DENY'
PUBLIC ACCESS
SECTION B-B
SUNSHINE COAST
REGIONAL COUNCIL
PLANS APPROVED
Signature
Date / t Ito
Precast Concrete
Deck Units (3off) OP.wca<s *c3b1o363
SCALE
JOB No. 33030
NOOSA BEACH NOURISHMENT
SANDS RECYCLE AUTOMATED SYSTEM
SEA WATER SUPPLY PUMP STN.G.A.
SIM mm
AMSh 2
Page 24
I
SUNSHINE COAST
REGIONAL COUNCIL
a^ 1P PLANS APPROVED
07906. 733 U3
n81703. 527 S^Pw Signature
`3.2c 1+ Date
0 OP.tnipi A 0$I0 3
DETAIL 1 ,SEAWATER SUPPLY
SEAWATER SUPPLY PUMP SITE PIPELINE ALIGNMENT
SITE PAN
Sion vmK Sunshine Coast SUNSHINE COAST JW No. 33030
or I &A *w"1." twraxaw NOOSA BEACH NOURISHMENT
FAM 11050 0111 SANDS RECYCLE AUTOMATED SYSTEM
NYC ia/t/oP
SLURRY SYSTEMS MARINE PTY LIMITED SEA WATER SYSTEM SITE PLAN
2 ITC TN- TC LN wur«aom
DRAWING No REFERENCE DRAWINGS I I w D ,w- P PLV. fAN
p0 *4 Wo" ID ID. Mf1WM
0.
Asshow4 A31 33030-0-05 1 2
Page 25
i
LEAGEND
----- BURIED NV ELECTRICAL CONDUITS
BURIED SEA WATER SUPPLY PIPELINE SCALE
BURIED SAND/SEAWATER TRANSFER PIPELINE Q SD 110 Zoe 3Q0
S uns h ine C oas SUNSHINE COAST JOB No. 33030
- --- w-= - " pi a NOOSA BEACH NOURISHMENT
NTC iaioa SANDS RECYCLE AUTOMATED SYSTEM
"w" 2 Karoo FoRomsyRUp11CN
SLURRY SYSTEMS MARINE PTY LIMITED TRANSFE R PIPELINE ALIGNMENT
TC LN WT-c LN t^xrr^m lnaea secs ao^wc ^
DRAWNI6 No. I AEFpt04M DRAW= M to am cm 1WLWItl4YL
PA
aAna w rwwr AtShow A3 33030 -8-01 2
J
Page 26
LAGUNA BAY
Alw
RECYCLE SAND LINE FROM SAND - \ v
4 601
1^ SNIFTER TOPUMP MPISE BY LAGUNA RAY
AC Ttl - PIPELINE 8UKf0 \
CONTRACTOR
BELOW BE
BEACH. tiv
\ N 70 819 59 427
NOMINAL 2SO.n DIA WATER SUPPLY PIPELINE
LAID ON TOP OF THE GROUND ADJACENT TO
E%KTRIG PATH. BY COUNCIL (11 - PIPELINE
POSITIONED MANUALLY WITH MINIMAL
CLEARING
C
280000U SAND RECYCLE PfLIE
LAID ON TOP OF GROUND AT TOP OF
280 00 UA SAND RECYCLE PIPELINE BANS NEAR TREE LINE
LAO ON TOP OF GROUND NEAR
TREE LIE REFER TYPKAL
SECTION BY COUNCIL 11 TYPKAL LKATO OF PPELA
ALONG SPIT OEAGI & NOOSA WOODS.
MEAN HIGH WATER SPRING RL 0 620 SUNSHINE COAST
--------
RL;- REGIONAL COUNCIL
MEAN LOW WATER SPRING RL •0 800
PLANS APPROVED
Signature J 1_-_
A Date 5 / 1 110
RL-SQf SQ Cam, WbRKS *. og(63$3
4
SUBMARINE SAND
THE SUBMARINE SAND SNIFTER WILL Of INITIALLY
SHIFTER
DETAL'A' - PROPOSED SAND EXTRACTION LOCATED ADJACENT TO THE TEST DOLL SITE BUT
MAY BE RELOCATED TO ANOTHER LOCATION WITHIN
AREA NEAR RIVER MOUTH TRANIM THE PERMIT AREA IF NECESSARY
SCALE 1 1000
oO 10 20 &J&nr
HORIZONTAL TYPICAL SECTION A - A
SEALS HORR 1500
SCALE PERT 1100
LEGEND
(11 PIPELINE WORK TO BE UNDERTAKEN A. CONTRACTOR TO PROVIDE SAFETY PLAN FOR OPERATION
BY NOOSA COUNCIL OF SAND SNIFTER AM ENVIRONMENTAL MANAGEMENT PLAN
(2) PIPELINE WORK To BE UNDERTAKEN B THIS PLAN 6 TO BE READ IN CONJUNCTION WITH REAL
BY CONTRACTOR PROPERTY PLAN MCII619101 AND AERIAL PHOTOGRAPH
SHEET 1 OF1
ma RHENDU OW
FOR L. I NOOSA PROPOSED SAND RECYCLING TRIAL ORANING No
B COUNCIL NOOSA SPIT BEACH TO NOOSA MAIN BEACH
ORARN ..^ 11 DATE
N rpli )PO Box 141 Tewaodn Q 4565
F1 . (m) U& S2flO
NOOSA HEADS
SITE PLAN AND DETAILS
11456-1B
lNOI REY19ON DETMS OMRGKII v WJKO
Page 27
SUNSHINE COAST REGIONAL COUNCIL PLANS APPROVED Signature Date S/J JId ov.wo^^cs .# 0$03$3 [OCR of page images] SUNSHINE COAST REGIONAL COUNCIL PLANS APPROVED Signature On JL Date... S]se On works 3 08/(03GR
Page 28
Locked Bag 72
lSunshineCoast Sunshine Coast Mail Centre
Qld 4560 POSTAGE
Regional Council
PAID
AUSTRALIA
1
/0
Used in these records
08/0383 - Change to an Existing Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.