Council archive · source document
08/0383 - Change to an Existing Approval [As Published] · 142008.383
2008/383
ed Comurrence cy Response -1FCCO1117
12 The sand shAM activity aridW wsoci li not resultin dwWa. to
pin,w arid tt 1 rgme of the Noosa ewer`
13 z`.aodree na! :mris must betaken +
th ,pets "1nn t e nd 5h f; i rl ^r arxVor
14 The n r is rotto oP+,°ei'r_t,.:ic vadewof Wow the natural surface prAAI* or the
required to rr /main sta ity of the Via lever Train*n welt (wrichieveir *a the lesser)
15 SON ShO be plOt8d uniforooy a'tr,ng ih ecuoo of beach to ncvnftd using the disch
aailoWe and in aszordariee cereal Lhe ape >fied plans
16 AN d sand "I be and rtoe at slit. Glam. cr io mMenW or any other deletenoitis
5UbWAMO e tie of a arxa c=snpatlo uith t sand
Wit!SWa& lojf
17 For all works whim the salty that may prim acid sulphate soils, an acid cu to
sows erw tigabee must be nod in accordar ca with the QAS& Guidelines (Ahern C R, Ahem
M R and Powell B, 1axon's far Sarnptirtri and Analysis of L wand Amd Sulfate Sods (ASS) in
Oueensland 1t , Queensland Deportment n` Na'u-al Rosourd and Mines) or s ibsequerit versions
theired, prior to commencing the ca nst,iictiun wcrks
18 Constructicin and tint of the said sh firing facility mu-5t oo mpty wish the Latest ri of the
p twtttYrtmer Prot tion A ^sncy drrSfr^l^;fa^ , s rcr ths^ Trani rf anU ::faR^tt ofMid Sis
Sods, 2001
irate saris must be managed such that contaminants are not cirely or
result of the con5trtion and operation of the sand .shifting ect, , ity andior associated act vv it i^ ro ., „
waters or the bed and banks of any
20 AN works must be wW ken in a manner tf'°tt m*wmwa dames to the v tore adpoent to the site
21 The width of clearing of the vegetaatirrn for ar , -ss and car n works is to be ms imaed a rd Mature
try Ito be fined whom pot: hlO by r, vor realignment the Works
22 Ail organically enriched mid removed from/ the top layer (topsoil) Min the proposed development
areas must be stockpiled separately prior to excavation, and respread over the devellopmerit area after
rem thng aspart of the riovegetabon works
23 A areas of exposed are to be t iced inst wind erosion dry the construcliori period
24 All material excavaled from a dunal system for Combudion works roust be placied, filled and
bitr against Wind tort on the seawar4 sate of the budding or structure
25 Any arosm or loss of d swrounding the works that ocems because a(dwWa caused by the works
must be rechfaad
P"o Sof8 C Cos MPMUPM ark le
Page 10 of 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0383 - Change to an Existing Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.