2008/383
7 Certification by a Registered Professional Engineer of Queensland shall be submitted to
Council stating that the works have been constructed in accordance with best practice
methods, is in accordance with Coastal Protection and Management Act 1995 (specifically the
engineering previsions of the Coastal Protection and Other Legislation Amendment Regulation
(No 1) 2005, Schedule 4A - IDAS Code for development applications for prescribed tidal
work) and is structurally sound
8 This approval or its conditions do not constitute a ruling on structural safety and the applicant
must make their own arrangements to ensure adequacy of design and work Furthermore, the
approval does not warrant that associated plans and specifications have been checked in
detail, nor does it absolve the owner of the land from complying with all the conditions of this
approval and/or relevant Council By-Laws and Policies and/or relevant statutes and/or
statutory regulations in the execution and/or performance of the works The Council does not
accept any responsibility for the accuracy of any plans and specifications as approved
9 The Development Permit for a Operational Works lapses if the use has not happened by 9
January 2011, unless an application to extend the currency is approved by Council
5 REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are
Referral Agency
Tidal work that is Concurrence Department of Ecoaccess Customer
prescribed tidal work Environment & i Service Unit,
other than in a canal Resource PO Box 15155,
Management CITY EAST QLD 4002
Tidal work that is Concurrence Queensland MacArthur Avenue East
prescribed tidal work Transport - PINKENBA Qld 4008
Maritime Services
Qld
A copy of any referral agency conditions is attached
6 APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table
Plan / Document No.- Rev Plan / Document Name Date
33030-0-01- 2 Noosa Beach Nourishment Sands 7 July 2009
Recycle Automated System Pump
Station G A Sh 1 of 2
33030-0-02 2 Noosa Beach Nourishment Sands 12 July 2009
Recycle Automated System Pump
1 Station Elevations Sh 2 of 2
33030-0-03 2 Noosa Beach Nourishment Sands 11 July 2009
Recycle Automated System Pump
Station Site Plan
33030-0-04 2 Noosa Beach Nourishment Sands 13 July 2009
Recycle Automated System Sea Water
Supply Pump Station G A
33030-0-05 2 Noosa Beach Nourishment Sands 13 July 2009
Recycle Automated System Sea Water
System Site Plan
Page 3 of 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0383 - Change to an Existing Approval [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.