Off Maintenance
55. Prior to requesting an Off Maintenance inspection the developer must provide a written
request for the Off Maintenance inspection.
56. A re-inspection fee in accordance with Council’s Fees and Charge Register will be charged
where:
a. a Council inspection reveals works do not comply with approval requirements
b. submitted certification falsely states works comply with approval requirements.
5. REFERRAL AGENCIES
Not applicable.
6. ADVISORY NOTES
The following notes are included for guidance and information purposes only and do not form part
of the assessment manager conditions:
General Advisory Notes
1. Council has undertaken an audit check of the Operational Works drawings in relations to the
proposed works. A detailed check of the calculations and drawings has not been undertaken,
as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of
the engineering design. Council reserves the right to require further amendments and/or
additions at a later date should design errors become apparent.
2. Council reserves the right to call up any performance bond held or levy charges against the
property, should emergency works be required to be undertaken by Council to make the site
safe due to inactivity on the development site for extended periods of time.
3. Should any changes or modifications to the approved plans be required as a result of
construction constraints, a “Request to change an existing approval” under the Planning Act
2016 must be made. Amended plans clearly indicating the changes must be lodged with this
application along with the appropriate fees.
Prestart, On and Off Maintenance Inspections Request
4. Contact Council on 5329 6500 to arrange a prestart or an inspection giving a minimum of 5
business days notice of preferred inspection time.
5. If Council officers are required to undertake additional inspections of the same works, a
reinspection fee will be applicable in accordance with Council’s Fees and Charges register
applicable at the time.
6. A minimum maintenance period of 12 months will apply to all municipal works and thereafter
until such time as the works are performing in accordance with the approved design unless
noted otherwise.
Prestart
7. Tree Protection Bond:
a. may be drawn upon by Council if:
iii. the recommendations of the Arborist report are not implemented and,
iv. any trees identified for retention are damaged to the point where they cannot be
saved (as confirmed by the site Arborist and agreed in writing by Council).
b. will be returned upon receiving certification from the site Arborist that all requirements
nominated in the Arborist report referenced within this Decision Notice have been
completed.
Retention of Existing Trees
Page 15 of 18
Document Set ID: 22338918
Version: 6, Version Date: 21/04/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning OPW22 0303 [As published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 353 KB (small file)
- File type
No other editions are linked here.