c. Underground service conduits for water supply, electricity and any other services must
be provided as part of the access driveway
d. Where there is an existing pedestrian path, a matching crossfall must be provided for
the driveway on the alignment of the path, for the full width of the path.
e. The property access must be located a minimum of 1m clear of existing power poles,
streetlights or other signage. The developer is responsible for any necessary relocation
of existing services to provide this clearance and must contact the relevant service
authorities and comply with their requirements in relation to these works.
26. Pedestrian / Vehicular Warning signs must be installed at basement entrance to improve
driver awareness of pedestrians and enhance pedestrian safety.
Earthworks and Retaining Walls
27. All earthworks shall be undertaken in accordance with the provisions of AS 3798 Guidelines
on Earthworks for Commercial and Residential Development, with geotechnical testing
undertaken in accordance with Section 8 of the Standard as defined in Appendix B. Test
results as required by AS 3798, and a certificate of quality and uniformity of fill shall be
provided by a RPEQ and submitted to Council prior to the commencement of the use.
28. Fall protection must be provided to retaining walls that are over 1m high.
29. Slope and batters are a maximum grade of:
a. 1 in 6 where in proximity to waterbodies
b. 1 in 4 for grassed areas.
c. 1 in 3 for planted areas.
d. 1 in 2 for combined structural engineering and planting solutions.
Stormwater Drainage
30. Appropriate scour protection must be provided at the outlet of all stormwater pipes including
temporary outlets.
31. Works associated with this permit must not adversely impact on the existing drainage
conditions on other properties (eg by blocking or interfering with natural overland flows).
32. Construction of all internal stormwater drainage works must comply with the relevant
section/s of Australian Standard AS/NZS 3500.3.
Erosion and Sediment Control
33. Prescribed Water Contaminants (as defined in Schedule 10 of Environmental Protection
Regulation 2019) must not be released from the site or to waters within the site, or be likely
to be released should rainfall occur, unless all reasonable and practicable measures are
taken to prevent or minimise the release and concentration of contamination. These
measures must be designed, implemented and maintained in accordance with “Best Practice
Erosion and Sediment Control” published by the International Erosion Control Association
(Australasian Chapter) (IECA, 2008), to the extent that such measures and practices are also
consistent with the following:
a. Minimise Erosion:
i. For areas of the site which drain to a sediment basin, implement drainage and
erosion control measures prior to rainfall which prevent or minimise rill erosion
and gully erosion
ii. For areas of the site which do not drain to a sediment basin, implement drainage
and erosion control measures prior to rainfall (including contingency measures)
which prevent or minimise erosion, including rain drop erosion, chemical erosion,
rill erosion and gully erosion
Page 9 of 18
Document Set ID: 22338918
Version: 6, Version Date: 21/04/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning OPW22 0303 [As published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 353 KB (small file)
- File type
No other editions are linked here.