A set of 5 plans by Bird Landscape Design Numbered LD1 to LD3 & LP1 to LP2 and dated 2nd April, 2022
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn STREET TREE PLANTING DETAIL PLAN Plant pit 2x width of respective pot. 2x pot Ø Shrub / groundcover / tufty
Scarify all pit walls and bottom, typ. grass plant species per plan
Pot Ø
Backfill plant pit with specified 100mm deep and settled organic
50mm x 150mm H4 F14 hardwood timber topsoil, avoid compaction, typ. mulch as specified, keep minimum
Topsoil with mulch edge, refer detail, typical 50mm from plant stem. Form shallow
above - mulch to back dish drain to base of plant, typ.
1800
of kerb, typical Garden topsoil as specified,
avoid compaction, typ.
Rootball
Fix edging with 3x F14 hardwood
Street tree,
50mm x 25mm x 450mm stakes, with 2x 100mm, typ.
refer detail below
galvanised nails to fix stakes to edging, typical
Slow release fertiliser as specified.
'Figure 8' hessian tree tie, typical
Rootbarrier, 2x rootball depth, typ. Use phosphorus free tablets for
see notes below Hardwood stakes (2), see section set parallel Banksia, Callistemon and Grevillea
KERB INVERT
to road, typical species.
150mm, typ. 150mm deep cultivated
subgrade, typ.
ROAD
2x hot dipped galvanised triple grip screw to fix Existing subgrade, typ.
mitred timber edging together, typical
NOTES:
Extent of tree pit excavation to be 1800mm x 1800mm in area, minimum (subject to footpath location). Remove all excavated fill off-site.
Place tree, 1000mm from back of kerb, or between kerb and footpath as applicable. 5 Potted Shrub, Groundcover Planting
Garden areas to extend from back kerb to footpath, typ. LD3 Typical Section Detail N.T.S.
Edging to extend to footpaths where applicable with street tree centrally located within garden (allowing for services setbacks), refer to
plans for path locations.
Ensure crown of rootball level is set higher than adjacent finished ground levels to prevent excessive ponding around rootball.
When footpath is adjacent to street tree install root barrier to footpath side of plant pit as per notes above.
1800
Full and even crown, typical
Notes
2 - 50mm x 50mm x 2400mm F14 hardwood
· Refer to architect's plans for planter wall heights/widths/materials and podium planter bed widths.
centrally pointed non-treated stakes (shown
· Refer to hydraulic engineer's plans for planter drainage and irrigation designs, and sealing.
perpendicular to kerb for graphic clarity only)
· Refer to irrigation designer's plans for irrigation system design.
50mm wide hessian tree ties to be driven vertically into ground outside of the
· Water proofing and independent certification of water proof membrane by others.
wrapped loosely around trunk, rootball and shall have a finished height lower
· Refer to Finishes Schedule for product specifications and Planting Schedule for plant selections.
then a figure 8 and secured to than the tree's lower lateral limbs
stake with galvanised nails or Form shallow saucer shaped depression
staples. Position tree tie between
around base of plant and keep mulch 50mm Plant per plan and Plan Schedule
1/3 to 1/2 overall height of tree.
from trunk base
4m L root barrier panels as Drip irrigation emitter and tube
100mm deep organic mulch as specified.
specified, centred at trunk with Slotted inspection grate, do not glue
Mound mulch at edge of plant pit to collect
root deflecting ribs (or equal)
water to fall down edges of plant pit.
facing tree, installed per Mulch as specified, 100mm deep settled, 50mm from plant stem, typ.
Turf as specified manufacturer's instructions Turf as specified 100mmØ uPVC slotted drainage / inspection pipe - 1m from tree rootball, typ.
Timber Edge Detail 1 - LD3 1) Planter wall, typ.
150mm Topsoil as specified
2) Waterproofing as specified to all interior planter wall surfaces, typ.
Metal Edging as specified 3) Protection board as specified
600
Tree pit to be excavated to nominal depth of 4) Geo-textile membrane as specified
600mm. Backfill hole with 100% friable Drainage cell as specified
100mm mulch as specified ameliorated site topsoil firming progressively.
50mmØ pvc drip irrigation conduit
Tapered Edging Stake as specified All excavated fill to be removed off site. Scarify
Slow release fertilizer all sides of plant pit, typical.
300mm Topsoil as specified as specified Proprietary podium drainage unit and carry-off pipe by builder
150mm cultivated subgrade, typ. 150mm cultivated subgrade 100mm deep uniform gravel layer. Provide Podium slab bottom to slope minimum 3% to low point, typ.
Existing subgrade and pit walls clean connection to road drainage as advised Podium soil as specified
on site by civil engineer.
1 Metal Garden Edge N.T.S. 3 Street Tree Planting - Timber Edges 1:30 6 Podium Planter 1:30
LD3 Typical Detail LD3 Typical Section Detail LD3 Typical Section
NOTES:
Ensure crown of rootball level is set higher than adjacent finished ground levels to prevent excessive ponding around rootball.
When footpath is adjacent to street tree install root barrier to footpath side of plant pit as per notes above.
1800
Timber Specification:
Unseasoned hardwood, Class 1 Select Grade F17, ACQ or Tanalith E minimum H4 treatment, Full and even crown, typical
with one coat of timber coating.
2 - 50mm x 50mm x 2400mm F14 hardwood
Galvanised timber centrally pointed non-treated stakes to be
fixing screws, typ. driven vertically into ground outside of the
50mm wide hessian tree ties rootball and shall have a finished height lower
wrapped loosely around trunk, than the tree's lower lateral limbs
then a figure 8 and secured to
stake with galvanised nails or Form shallow saucer shaped depression 600mm
staples. Position tree tie between typical
around base of plant and keep mulch 50mm
1/3 to 1/2 overall height of tree.
from trunk base
ELEVATION
100mm deep organic mulch as specified.
Mound mulch at edge of plant pit to collect
water to fall down edges of plant pit. Varies,
1200mm, maximum refer
Turf as specified Plans
PLAN
150mm x 50 mm timber edging 50mm x 25mm x 450mm Tree pit to be excavated to nominal depth of
hardwood peg 600mm. Backfill hole with 100% friable
20mm @1200mm centres Slow release fertilizer ameliorated site topsoil firming progressively.
Turf as specified as specified All excavated fill to be removed off site. Scarify
Mulch as specified
all sides of plant pit, typical.
2x hot dipped galvanised
triple grip screw to fix mitred
100mm deep uniform gravel layer. Provide
timber edging together,
clean connection to road drainage as advised
typical.
on site by civil engineer. Road
SECTION Back of kerb or hardstand Turf Roll, typical
2 Hardwood Treated Garden Edge N.T.S. 4 Tree Planting - in Garden or Turf 1:30 7 Turfing
LD3 Typical Detail LD3 Typical Section LD3 Typical Plan Detail N.T.S.
NOTES:
This plan is Copyrighted © by Bird Landscape Design (Brian Bird - AILA RLA #1736).
Landscape Operational Works Package Project: BIRD LANDSCAPE DESIGN
Any reproduction or unauthorized use without written consent from Job No: 2224 Proposed Duplex Landscape Architecture, Urban Design, Land Planning
Bird Landscape Design is strictly prohibited. Lot 106 RP41223, 27 Hilton Terrace, Tewantin, QLD 3 Vector Place, Little Mountain, QLD 4551 Australia
Do not scale from PDF plans. M: +614 7705 5222
02.04.22 A For Application BB BB All dimensions in millimetres unless noted otherwise.
LD3 Details E: [email protected]
11.03.22 A For Application BB BB
Sheet Title Sheet 3 of 5 Client: Urban Fabric W: birdgolfdesign.com
DATE ISSUE DESCRIPTION DRAWN CKD