Council archive · source document
Body Corp Approval · 51988.2852.02
↵
1st October 2021
TO ALL OWNERS
FOR YOUR INFORMATION
BODY CORPORATE FOR NOOSA HILL RESORT CTS 5887
VOCM - PENTHOUSE RENOVAITONS FOR LOTS 31 AND 18 AND 5
We refer to a Voting Paper of 23 September 2021 sent out to all Committee and advise that the following Motion has
been carried:
COMMITTEE RESOLUTIONS
_______________________________________________________________________
VOCM - RENOVATION TO LOT 31 PENTHOUSE ROOF AREA
COMMITTEE MOTION
That the Committee approve the following renovation works to Lot 31:-
Install fixed wall mounted folding umbrella over the outdoor dining area instead of the current market
umbrella;
Install retractable shade awning to the spa area;
Replace existing lighting with led lighting to the spa and seating area and door access;
Install MFL by Masson Torant LED white Floodlight over the door;
Install LEDlux Caspa 500mm IP65 LED Wall Sconce over the outdoor dining area;
Install LEDlux Miles up/down wall bracket over the spa area; and
All in white.
Subject to the following conditions:-
That the upgrade and installation is completed as detailed in the applicants original request;
That the cost of installation and future maintenance of the lighting, retractable awning and folding umbrella is
the responsibility of the Owners of Lot 31;
That the proposed works are completed by a suitably qualified tradesman;
That rectification of any damage sustained to common property (in particular waterproofing membrane), or
another Lot, as a result of the installations will be the responsibility of the Owner of Lot 31;
That the works completed are maintained to a high standard;
That the installations meet any Council requirements and any relevant Building Code;
The owner obtains council approval and also provides evidence of this approval to the committee before
proceeding with the work;
That the work not be performed during school or public holidays; and
On the understanding that approval can be withdrawn at any time if the above conditions are not met.
MOTION CARRIED. YES – 7 NO – 0 ABSTAIN - 0
_______________________________________________________________________
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 2 pages
Page 2
_______________________________________________________________________
VOCM - INSTALLATION OF AN “ECLIPSE” OPENING ROOF TO LOT 18 PENTHOUSE ROOF AREA
COMMITTEE MOTION
That the Committee approve the installation of an “Eclipse” Opening Roof to Lot 18 as described below:-
The new roof will have 3 bays of opening roof system that will be operable via remote control. This system will
be waterproof and be constructed from T6 marine grade aluminium and 316 stainless steel components to
eliminate any rust or corrosion issues;
The new opening roof system will be attached to the existing Unit walls and extend out. The new 200x50mm
T6 marine grade aluminium beams will run out dead level on all four sides and the fall will be created within
the internal gutter system. The new system will have a 600mm cantilever past the existing side walls towards
the existing storm water location as per the scale drawn plans;
The blades will be extruded aluminium in the new flat blade design. They are approximately 4mm overall
thickness to eliminate any potential wind, rain and hail damage. The new system will be engineered to meet
the relevant wind rating in your area;
It will require a widespan beam capable of spanning approx. 7.7m from side wall to side wall of the balcony.
It is based on covering of the stairwell access void section of 3440x3005mm and adding 1200x7700mm
section covering a portion of the wider balcony section; and
The two side bits will be 1930x1200mm near the spa location and 2750x1200mm near the storage room side.
Subject to the following conditions:-
That the installation is completed as detailed in the applicants original request;
That the cost of installation and future maintenance of the “eclipse” opening roof is the responsibility of the
Owners of Lot 18;
That the proposed works are completed by a suitably qualified tradesman;
That rectification of any damage sustained to common property (in particular waterproofing membrane), or
another Lot, as a result of the installation will be the responsibility of the Owner of Lot 18;
That the works completed are maintained to a high standard;
That the installations meet any Council requirements and any relevant Building Code;
The owner obtains council approval and also provides evidence of this approval to the committee before
proceeding with the work;
That the work not be performed during school or public holidays; and
On the understanding that approval can be withdrawn at any time if the above conditions are not
met.
MOTION CARRIED. YES – 7 NO – 0 ABSTAIN - 0
_______________________________________________________________________
Page 3
_______________________________________________________________________
VOCM - INSTALLATION OF AN “ECLIPSE” OPENING ROOF TO LOT 5 PENTHOUSE ROOF AREA
COMMITTEE MOTION
That the Committee approve the installation of an “Eclipse” Opening Roof to Lot 5 as described below:-
The new roof will have 3 bays of opening roof system that will be operable via remote control. This system will
be waterproof and be constructed from T6 marine grade aluminium and 316 stainless steel components to
eliminate any rust or corrosion issues;
The new opening roof system will be attached to the existing Unit walls and extend out. The new 200x50mm
T6 marine grade aluminium beams will run out dead level on all four sides and the fall will be created within
the internal gutter system. The new system will have a 600mm cantilever past the existing side walls towards
the existing storm water location as per the scale drawn plans;
The blades will be extruded aluminium in the new flat blade design. They are approximately 4mm overall
thickness to eliminate any potential wind, rain and hail damage. The new system will be engineered to meet
the relevant wind rating in your area;
It will require a widespan beam capable of spanning approx. 7.7m from side wall to side wall of the balcony;
and
It is based on covering of the stairwell access void section of 3440x2930mm and adding 1200x7700mm
section covering a portion of the wider balcony section.
Subject to the following conditions:-
That the upgrade and installation is completed as detailed in the applicants original request;
That the cost of installation and future maintenance of the “eclipse” opening roof is the responsibility of the
Owners of Lot 5;
That the proposed works are completed by a suitably qualified tradesman;
That rectification of any damage sustained to common property (in particular waterproofing membrane), or
another Lot, as a result of the installations will be the responsibility of the Owner of Lot 5;
That the works completed are maintained to a high standard;
That the installations meet any Council requirements and any relevant Building Code;
The owner obtains council approval and also provides evidence of this approval to the committee before
proceeding with the work;
That the work not be performed during school or public holidays; and
On the understanding that approval can be withdrawn at any time if the above conditions are not met.
MOTION CARRIED. YES – 6 NO – 0 ABSTAIN - 1
_______________________________________________________________________
Yours sincerely,
Adelle Sirett
Body Corporate Manager
TEAM BODY CORPORATE