201026 16 Grant Street, Noosa TP Report

Attached to the e-mail Operational Works Application - 16 Grant Street Noosa Heads.

of 16
  treatment during the construction     capture in accordance with Appendix
  phase.                                2, Table A of the Queensland State
                                        Planning Policy and International
                                        Erosion Control Association Best
                                        Practice Erosion and Sediment
                                        Control (BPESC) 2008;
                                        AND
                                        S1.2                                        S1.2 Complies
                                        Construction works are designed and         Sediment barriers will be provided
                                        managed to restrict the extent of           throughout and downslope of
                                        clearing and soil exposure to that          disturbed areas to prevent
                                        necessary for access, and safe              sediment washing into gutters,
                                        construction;                               drains and watercourses either on
                                        AND                                         or off the site.
                                        S1.3                                        S1.3 Complies
                                        Clean stormwater is diverted or             Clean stormwater will be diverted
                                        managed around or through the site          or managed appropriately in
                                        without increasing the concentration        accordance with the relevant
                                        of total suspended solids or other          provisions.
                                        contaminants in the flow and without
                                        causing erosion (onsite or offsite);
                                        AND
                                        S1.4                                        S1.4 Complies
                                        Cleared areas are effectively               Cleared areas are effectively
                                        stabilised prior to rainfall if works are   stabilised prior to rainfall if works
                                        delayed or works are not intended to        are delayed or works are not
                                        occur immediately;                          intended to occur immediately
                                        AND
                                        S1.6                                        S1.6 Complies
                                        For buildings –                             The proposal at hand involves
                                        a) upstream runoff must be diverted         appropriate measures to ensure
                                            around the construction site; and       no sediment is discharged in
                                        b) sediment barriers are provided           compliance with the relevant
                                            downslope of disturbed areas to         provisions.
                                            prevent sediment washing into
                                            gutters, drains and watercourses
                                            either on or off the site; and
                                        c) exposed soil and construction
                                            access must be managed in
                                            accordance with International
                                            Erosion Control Association Best
                                            Practice Erosion and Sediment
                                            Control (BPESC) 2008; and
                                        d) temporary or permanent
                                            downpipes are connected to the
                                            stormwater system before laying
                                            the roof; or
                                        e) e) localised erosion is avoided by
                                            directing flow from downpipes
                                            over non-erosive areas.
 Works in a watercourse
 O2                                     S2.1                                        S2.1 Complies
 Construction activities within         Work within waterways must be               The proposal will be undertaken
 watercourses are planned to            undertaken in accordance with Best          in accordance with Best Practice
 prevent erosion, construction          Practice Erosion and Sediment               Erosion and Sediment Control.
 failure and associated                 Control, Appendix I – Instream
 sedimentation.                         works, Sections 14 and 16
                                        International Erosion Control




12

Operational Work (Development Permit)
16 Grant Street, Noosa

Log in to download the original (201026 16 Grant Street, Noosa TP Report.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.